{
  "summary": {
    "historicalPairs": 819,
    "historicalPairsWithDistance": 22,
    "historicalUnder100m": 22,
    "historicalUnder50mSameSiteCandidates": 21,
    "hgabLines": 5765,
    "hgabLinesWithUsablePoint": 1711,
    "currentSameBarangayCoordinatePairs": 95,
    "currentVerifiedSameBarangayPairs": 85,
    "currentUnder50mSameSiteCandidates": 6,
    "coordinateAuditQualifiedMatched": 1215,
    "coordinateAuditOutside": 145,
    "coordinateAuditUnmatched": 496,
    "coordinateAuditPlaceUnresolved": 448,
    "coordinateAuditBoundaryUnmatched": 39
  },
  "historical": [
    {
      "category": "Multi-purpose building",
      "project": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "source_code": "2027DPWH-Proposal-23169",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Agustin, Malabon City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.662042,
        "longitude": 120.952531,
        "raw": "14.662042, 120.952531",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "san agustin · malabon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Agustin, Malabon City",
      "sourceLabel": "2027DPWH-Proposal-23169",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543818",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "source_code": "2027DPWH-Proposal-23172",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 60000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Santulan, Malabon City,  14.685767, 120.958842",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31253",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 6.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.685711,
        "longitude": 120.958868,
        "raw": "14.685711, 120.958868",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.685767,
        "longitude": 120.958842,
        "raw": "14.685767, 120.958842",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "santulan · malabon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Santulan, Malabon City,  14.685767, 120.958842",
      "sourceLabel": "2027DPWH-Proposal-23172",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 31253",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-33710",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Ising, Carmen, Davao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485482",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ising · carmen · davao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Ising, Carmen, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-33710",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485482",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-33710",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532895",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ising · carmen · davao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-33710",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532895",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "source_code": "2027DPWH-Proposal-34725",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "prior_amount": 148000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eric Yap"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "otherProject": "Completion of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "sourceLabel": "2027DPWH-Proposal-34725",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595805",
      "currentAllocationPesos": 150000000,
      "otherAllocationPesos": 148000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "source_code": "2027DPWH-Proposal-36285",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall) in Brgy. Mataas na Lupa, Taysan, Batangas",
      "prior_amount": 13000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599290",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Barangay Hall) in Brgy. Mataas na Lupa, Taysan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36285",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599290",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 13000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "source_code": "2027DPWH-Proposal-36285",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building (Barangay Hall) at Brgy. Mataas na Lupa, Taysan, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35158",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "otherProject": "Construction of Multi-purpose Building (Barangay Hall) at Brgy. Mataas na Lupa, Taysan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36285",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35158",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas",
      "source_code": "2027DPWH-Proposal-09606",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas (13.823227,121.028655)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34852",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.823227,
        "longitude": 121.028655,
        "raw": "13.823227,121.028655",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas (13.823227,121.028655)",
      "sourceLabel": "2027DPWH-Proposal-09606",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34852",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-28896",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Nueva, City of San Pedro, Laguna",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Nueva, City of San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-28896",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545669",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-28896",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Nueva, San Pedro City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599450",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Nueva, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-28896",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599450",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
      "source_code": "2027DPWH-Proposal-09554",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bagong Tubig, San Luis, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545317",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagong tubig · san luis · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Bagong Tubig, San Luis, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09554",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545317",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
      "source_code": "2027DPWH-Proposal-09563",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gamao, Tingloy, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545326",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gamao · tingloy · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Gamao, Tingloy, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09563",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545326",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36284",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Palahanan I, San Juan, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599236",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palahanan i · san juan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Palahanan I, San Juan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36284",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599236",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36282",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Brgy. Sta. Cruz, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. cruz · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court) at Brgy. Sta. Cruz, Rosario, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36282",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35140",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38448",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Covered Court), Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596613",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Barangay Covered Court), Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-38448",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596613",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38793",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "prior_amount": 12000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602565",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lingayao · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "sourceLabel": "2027DPWH-Proposal-38793",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602565",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38794",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602638",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mahogany · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "sourceLabel": "2027DPWH-Proposal-38794",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602638",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
      "source_code": "2027DPWH-Proposal-38605",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Miguel Macasarte, Banisilan, Cotabato",
      "prior_amount": 6000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "miguel macasarte · banisilan · cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
      "otherProject": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Miguel Macasarte, Banisilan, Cotabato",
      "sourceLabel": "2027DPWH-Proposal-38605",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602341",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "source_code": "2027DPWH-Proposal-37891",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Poblacion, Kawayan, Biliran",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.677362,
        "longitude": 124.35771,
        "raw": "124.357710°, 11.677362",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Poblacion, Kawayan, Biliran",
      "sourceLabel": "2027DPWH-Proposal-37891",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420038",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "source_code": "2027DPWH-Proposal-22741",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City",
      "prior_amount": 67457000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595702",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.602757,
        "longitude": 121.022818,
        "raw": "121.022818, 14.602757",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City",
      "sourceLabel": "2027DPWH-Proposal-22741",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595702",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 67457000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "source_code": "2027DPWH-Proposal-09594",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545316",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san teodoro · bauan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09594",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545316",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38796",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602563",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lawan-lawan · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "sourceLabel": "2027DPWH-Proposal-38796",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602563",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered court), Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales (14.855419, 120.290497)",
      "source_code": "2027DPWH-Proposal-11120",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545245",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.855419,
        "longitude": 120.290497,
        "raw": "14.855419, 120.290497",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gordon heights · olongapo · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered court), Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales (14.855419, 120.290497)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court) Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales",
      "sourceLabel": "2027DPWH-Proposal-11120",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545245",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-05182",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597149",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Sandro Marcos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "otherProject": "Construction of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "sourceLabel": "2027DPWH-Proposal-05182",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597149",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-34879",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Evacuation Center), Brgy. Nueva Era, San Manuel, Isabela",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548760",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva era · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
      "otherProject": "Construction of Multi-Purpose Building (Evacuation Center), Brgy. Nueva Era, San Manuel, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34879",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 548760",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "source_code": "2027DPWH-Proposal-02651",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "prior_amount": 9000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420161",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.447525,
        "longitude": 124.313751,
        "raw": "12.447525, 124.313751",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "otherProject": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "sourceLabel": "2027DPWH-Proposal-02651",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420161",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 9000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "source_code": "2027DPWH-Proposal-02651",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "prior_amount": 15000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532332",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.447525,
        "longitude": 124.313751,
        "raw": "12.447525, 124.313751",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "otherProject": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "sourceLabel": "2027DPWH-Proposal-02651",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532332",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Operations Center), Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
      "source_code": "2027DPWH-Proposal-39119",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Operations Center), Barangay Poblacion, Catarman, Camiguin, 124.67487933332, 9.1231116667",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.1231116667,
        "longitude": 124.67487933332,
        "raw": "124.67487933332, 9.1231116667",
        "orientation": "longitude, latitude",
        "decimalPlaces": 10,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Operations Center), Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
      "otherProject": "Construction of Multi-Purpose Building (Operations Center), Barangay Poblacion, Catarman, Camiguin, 124.67487933332, 9.1231116667",
      "sourceLabel": "2027DPWH-Proposal-39119",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40403",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36174",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599519",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "v-a · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "otherProject": "Rehabilitation of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36174",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599519",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
      "source_code": "2027DPWH-Proposal-33541",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 9200000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Namaltugan, Sudipen, La Union",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "namaltugan · sudipen · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Namaltugan, Sudipen, La Union",
      "sourceLabel": "2027DPWH-Proposal-33541",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597342",
      "currentAllocationPesos": 9200000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
      "source_code": "2027DPWH-Proposal-33542",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5750000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pandan, Bacnotan, La Union",
      "prior_amount": 6000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597336",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pandan · bacnotan · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pandan, Bacnotan, La Union",
      "sourceLabel": "2027DPWH-Proposal-33542",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597336",
      "currentAllocationPesos": 5750000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33543",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction / Improvement of Multi-Purpose Building, Poblacion, Santol, La Union",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544181",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "otherProject": "Construction / Improvement of Multi-Purpose Building, Poblacion, Santol, La Union",
      "sourceLabel": "2027DPWH-Proposal-33543",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544181",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33543",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597351",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santol · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "otherProject": "Construction of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "sourceLabel": "2027DPWH-Proposal-33543",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597351",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
      "source_code": "2027DPWH-Proposal-33544",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 14950000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rimos 5, Luna, La Union",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597321",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rimos 5 · luna · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Rimos 5, Luna, La Union",
      "sourceLabel": "2027DPWH-Proposal-33544",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597321",
      "currentAllocationPesos": 14950000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417471",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36763",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417471",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Bagong Silang, San Pedro City, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545679",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "otherProject": "Construction of Multi Purpose Building, Brgy. Bagong Silang, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36763",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545679",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-Purpose Building at Barangay Bagong Silang, San Pedro City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599453",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "otherProject": "Construction/Completion of Multi-Purpose Building at Barangay Bagong Silang, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36763",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599453",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35071",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Fugu, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597799",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "fugu · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Fugu, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35071",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597799",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35055",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Ganzano, Gattaran, Cagayan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544452",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ganzano · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Ganzano, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35055",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544452",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37064",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Maasin, Bulalacao, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417962",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Maasin, Bulalacao, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37064",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417962",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Mahabang Lalim, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36345",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mahabang Lalim, General Nakar, Quezon",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mahabang lalim · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Mahabang Lalim, General Nakar, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mahabang Lalim, General Nakar, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36345",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413723",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "source_code": "2027DPWH-Proposal-34083",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 72000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466054",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "manresa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-34083",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466054",
      "currentAllocationPesos": 72000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "source_code": "2027DPWH-Proposal-34083",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 72000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "prior_amount": 8300000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413047",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "manresa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-34083",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413047",
      "currentAllocationPesos": 72000000,
      "otherAllocationPesos": 8300000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37438",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419085",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palaka · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37438",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419085",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37438",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600898",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palaka · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37438",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600898",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "source_code": "2027DPWH-Proposal-35241",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion 1, Santa Maria, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544540",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.467914,
        "longitude": 121.752852,
        "raw": "17.467914, 121.752852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion 1 · santa maria · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion 1, Santa Maria, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35241",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544540",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483062",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Poblacion, Bulalacao, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37066",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483062",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417948",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "otherProject": "Construction (Improvement) of Multi-Purpose Building at Barangay Poblacion, Bulalacao, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37066",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417948",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531248",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Poblacion, Bulalacao, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37066",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531248",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
      "source_code": "2027DPWH-Proposal-34292",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction / Improvement of Multi-Purpose Building, Barangay Poblacion, Laoac, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544285",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · laoac · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
      "otherProject": "Construction / Improvement of Multi-Purpose Building, Barangay Poblacion, Laoac, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34292",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544285",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36625",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Gabriel, San Pablo City, Laguna",
      "prior_amount": 12000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san gabriel · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Gabriel, San Pablo City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36625",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482695",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35066",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tagumay, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tagumay · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tagumay, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35066",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529793",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building in Barangay 1, Hinoba-an, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37602",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.6004,
        "longitude": 122.46686,
        "raw": "9.60040,122.46686",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · hinoba-an · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building in Barangay 1, Hinoba-an, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "sourceLabel": "2027DPWH-Proposal-37602",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-21359",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 520365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-21359",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 520365",
      "currentAllocationPesos": 150000000,
      "otherAllocationPesos": 150000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
      "source_code": "2027DPWH-Proposal-35401",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Santor, Reina Mercedes, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santor · reina mercedes · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Santor, Reina Mercedes, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35401",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481534",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.99926, 14.885576)",
      "source_code": "2027DPWH-Proposal-10599",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan",
      "prior_amount": 35000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 520524",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.885576,
        "longitude": 120.99926,
        "raw": "120.99926, 14.885576",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.99926, 14.885576)",
      "otherProject": "Construction of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-10599",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 520524",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 35000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37347",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.6004,
        "longitude": 122.46686,
        "raw": "9.60040,122.46686",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · hinoba-an · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "sourceLabel": "2027DPWH-Proposal-37347",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37349",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · ilog · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37349",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546797",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-35381",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abagao · camalaniugan · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35381",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597794",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
      "source_code": "2027DPWH-Proposal-37121",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building of Barangay Alibunan, Calinog, Iloilo",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418763",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alibunan · calinog · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
      "otherProject": "Rehabilitation of Multi-Purpose Building of Barangay Alibunan, Calinog, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37121",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418763",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Aplaya, Bauan, Batangas",
      "source_code": "2027DPWH-Proposal-09601",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Aplaya, Bauan, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530436",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aplaya · bauan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Aplaya, Bauan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Aplaya, Bauan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09601",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530436",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35388",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Asinga Via, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597778",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Asinga Via, Baggao, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35388",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597778",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35382",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Baculod, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597783",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baculod · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Baculod, Alcala, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35382",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597783",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38494",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Bagongon, Compostela, Davao de Oro",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagongon · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Bagongon, Compostela, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-38494",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 421280",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
      "source_code": "2027DPWH-Proposal-36700",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Baguio, Tayabas City, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baguio · tayabas · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Baguio, Tayabas City, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36700",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599581",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34883",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ballesteros · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34883",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415927",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34883",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ballesteros · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34883",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597934",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35168",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bangatan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35168",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597797",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413658",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525464",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545188",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545188",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building in Brgy. Baras Baras, Tarlac City",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 565695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction of Multi Purpose Building in Brgy. Baras Baras, Tarlac City",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2024 GAA · docs/GAA-2024.xlsx · row 565695",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 100000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595942",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baras-Baras, City of Tarlac, Tarlac (15.518348, 120.565008)",
      "prior_amount": 7000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34213",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.518348,
        "longitude": 120.565008,
        "raw": "15.518348, 120.565008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Baras-Baras, City of Tarlac, Tarlac (15.518348, 120.565008)",
      "sourceLabel": "2027DPWH-Proposal-33633",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34213",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35150",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597815",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barbarit · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35150",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597815",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "source_code": "2027DPWH-Proposal-35023",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544467",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batangan · gonzaga · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35023",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544467",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "source_code": "2027DPWH-Proposal-36170",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417306",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batong dalig · kawit · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36170",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417306",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "source_code": "2027DPWH-Proposal-36170",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Batong Dalig, Kawit, Cavite",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35353",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batong dalig · kawit · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. Batong Dalig, Kawit, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36170",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35353",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34960",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598027",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bisag · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34960",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598027",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-34963",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529904",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bitabian · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34963",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529904",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-34963",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bitabian · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34963",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598008",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38598",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "biwang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38598",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35868",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544975",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35868",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544975",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "source_code": "2027DPWH-Proposal-37262",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 11000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor-Embarkadero, Dumangas, Iloilo",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.819806,
        "longitude": 122.712086,
        "raw": "10.819806, 122.712086",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor-Embarkadero, Dumangas, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37262",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600576",
      "currentAllocationPesos": 11000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "source_code": "2027DPWH-Proposal-37262",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 11000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819624, 122.711925",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 26.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 10.819806,
        "longitude": 122.712086,
        "raw": "10.819806, 122.712086",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.819624,
        "longitude": 122.711925,
        "raw": "10.819624, 122.711925",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buenaflor embarkadero · dumangas · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "otherProject": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819624, 122.711925",
      "sourceLabel": "2027DPWH-Proposal-37262",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37401",
      "currentAllocationPesos": 11000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36043",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Bulac, Talavera, Nueva Ecija",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Bulac, Talavera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36043",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481802",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
      "source_code": "2027DPWH-Proposal-37620",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Cabal-asan, Maria, Siquijor",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabal-asan · maria · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Cabal-asan, Maria, Siquijor",
      "sourceLabel": "2027DPWH-Proposal-37620",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484369",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36048",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija, 15.580838, 120.873065",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33915",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.580838,
        "longitude": 120.873065,
        "raw": "15.580838, 120.873065",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
      "otherProject": "Construction of Multi Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija, 15.580838, 120.873065",
      "sourceLabel": "2027DPWH-Proposal-36048",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33915",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "source_code": "2027DPWH-Proposal-39542",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596127",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eulogio Rodriguez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calatagan proper · virac · catanduanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "otherProject": "Completion of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "sourceLabel": "2027DPWH-Proposal-39542",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596127",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35018",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Capissayan Sur, Gattaran, Cagayan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544457",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "capissayan sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Capissayan Sur, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35018",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544457",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
      "source_code": "2027DPWH-Proposal-37269",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600569",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.059806,
        "longitude": 122.617673,
        "raw": "11.059806 ,122.617673",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "capuling · duenas · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37269",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600569",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36038",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija, 15.603977, 120.782105",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33867",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.603977,
        "longitude": 120.782105,
        "raw": "15.603977, 120.782105",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cardinal · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija, 15.603977, 120.782105",
      "sourceLabel": "2027DPWH-Proposal-36038",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33867",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34962",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598028",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro east · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34962",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598028",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34874",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34874",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 17000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34874",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "prior_amount": 40000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.099294,
        "longitude": 121.698193,
        "raw": "17.099294, 121.698193",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "sourceLabel": "2027DPWH-Proposal-34874",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 40000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38584",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 422052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "datu karon · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38584",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 422052",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38584",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602528",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "datu karon · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38584",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602528",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34156",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "eguia · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34156",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597403",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35859",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Faigal, Guimba, Nueva Ecija",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530145",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "faigal · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Faigal, Guimba, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35859",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530145",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
      "source_code": "2027DPWH-Proposal-34177",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan (16.388052, 119.893274)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.388052,
        "longitude": 119.893274,
        "raw": "16.388052, 119.893274",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "germinal · bolinao · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan (16.388052, 119.893274)",
      "sourceLabel": "2027DPWH-Proposal-34177",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32008",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34759",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Gonogon, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597720",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gonogon · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Gonogon, Bontoc, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34759",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597720",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35046",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597803",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "jurisdiccion · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35046",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597803",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
      "source_code": "2027DPWH-Proposal-36692",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Kalangay, Lucban, Quezon (14.156733°, 121.552353°)",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35735",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.156733,
        "longitude": 121.552353,
        "raw": "14.156733°, 121.552353",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kalangay · lucban · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Kalangay, Lucban, Quezon (14.156733°, 121.552353°)",
      "sourceLabel": "2027DPWH-Proposal-36692",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35735",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38579",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Keytodac, Lebak, Sultan Kudarat",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "keytodac · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Keytodac, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38579",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485802",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 700000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484292",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "sourceLabel": "2027DPWH-Proposal-37790",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484292",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "prior_amount": 42500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414646",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "sourceLabel": "2027DPWH-Proposal-37790",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414646",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 42500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "labangon · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37790",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547105",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601187",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "labangon · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37790",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601187",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "source_code": "2027DPWH-Proposal-36695",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545735",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lipata · panukulan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36695",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545735",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34878",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34878",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34878",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34878",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "source_code": "2027DPWH-Proposal-35384",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabanguc · aparri · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35384",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597805",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37489",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600829",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabini · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37489",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600829",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35845",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598607",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macamias · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35845",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598607",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35845",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Macamias, Guimba, Nueva Ecija, 15.62991, 120.705729",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.62991,
        "longitude": 120.705729,
        "raw": "15.62991, 120.705729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macamias · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi Purpose Building, Barangay Macamias, Guimba, Nueva Ecija, 15.62991, 120.705729",
      "sourceLabel": "2027DPWH-Proposal-35845",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33797",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35856",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530168",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maeling · nampicuan · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35856",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530168",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-09806",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599430",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaban · binan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-09806",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599430",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 17000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-09806",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna (14.354068°, 121.086786°)",
      "prior_amount": 80000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30396",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.354068,
        "longitude": 121.086786,
        "raw": "14.354068°, 121.086786",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaban · binan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna (14.354068°, 121.086786°)",
      "sourceLabel": "2027DPWH-Proposal-09806",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30396",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 80000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
      "source_code": "2027DPWH-Proposal-34922",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Mangandingay, Angadanan, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481540",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Mangandingay, Angadanan, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34922",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481540",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "source_code": "2027DPWH-Proposal-31412",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 70000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, Pasig City",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543884",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.597582,
        "longitude": 121.102681,
        "raw": "14.597582,121.102681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Manggahan, Pasig City",
      "sourceLabel": "2027DPWH-Proposal-31412",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543884",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34961",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598024",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "marikit · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34961",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598024",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38798",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Mat-I, Las Nieves, Agusan del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602599",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mat-i · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Mat-I, Las Nieves, Agusan del Norte",
      "sourceLabel": "2027DPWH-Proposal-38798",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602599",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35841",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530169",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maycaban · cuyapo · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35841",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530169",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
      "source_code": "2027DPWH-Proposal-35236",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. Olango, Mallig, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481481",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "olango · mallig · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
      "otherProject": "Construction (Completion) of Multi-purpose Building, Brgy. Olango, Mallig, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35236",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481481",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35019",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palagao sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35019",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529792",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35019",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597813",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palagao sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35019",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597813",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35021",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597790",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "piggatan · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35021",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597790",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35849",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion norte · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35849",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33793",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "source_code": "2027DPWH-Proposal-37625",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion norte · maria · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "sourceLabel": "2027DPWH-Proposal-37625",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419989",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
      "source_code": "2027DPWH-Proposal-35560",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Mayantoc, Tarlac (15.620404, 120.377428)",
      "prior_amount": 18000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.620404,
        "longitude": 120.377428,
        "raw": "15.620404, 120.377428",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Mayantoc, Tarlac (15.620404, 120.377428)",
      "sourceLabel": "2027DPWH-Proposal-35560",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34223",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 18000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34178",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building, Barangay Poblacion, Agno, Pangasinan (16.116157, 119.799239)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.116157,
        "longitude": 119.799239,
        "raw": "16.116157, 119.799239",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · agno · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "otherProject": "Construction of Multi-purpose Building, Barangay Poblacion, Agno, Pangasinan (16.116157, 119.799239)",
      "sourceLabel": "2027DPWH-Proposal-34178",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32010",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
      "source_code": "2027DPWH-Proposal-37266",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Anilao, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483566",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · anilao · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Poblacion, Anilao, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37266",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483566",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "source_code": "2027DPWH-Proposal-37267",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.002222,
        "longitude": 122.821944,
        "raw": "11.002222,122.821944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37267",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38495",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532858",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-38495",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532858",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38495",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40882",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-38495",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40882",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597404",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34176",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597404",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan (15.990590, 119.880249)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.99059,
        "longitude": 119.880249,
        "raw": "15.990590, 119.880249",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan (15.990590, 119.880249)",
      "sourceLabel": "2027DPWH-Proposal-34176",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32000",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "source_code": "2027DPWH-Proposal-34179",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597405",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · mabini · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34179",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597405",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "source_code": "2027DPWH-Proposal-34179",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan (16.071635, 119.938395)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32006",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.071635,
        "longitude": 119.938395,
        "raw": "16.071635, 119.938395",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · mabini · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan (16.071635, 119.938395)",
      "sourceLabel": "2027DPWH-Proposal-34179",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32006",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38492",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421290",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · monkayo · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-38492",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 421290",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 1500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33635",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33635",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "currentAllocationPesos": 35000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "source_code": "2027DPWH-Proposal-37732",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547003",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · samboan · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37732",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547003",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "source_code": "2027DPWH-Proposal-37732",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596294",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · samboan · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37732",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596294",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34894",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544570",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rang-ayan · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34894",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544570",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36499",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Rizal Poblacion, Lopez, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599706",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal poblacion · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Rizal Poblacion, Lopez, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36499",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599706",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34904",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597944",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34904",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597944",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36690",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sablang · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36690",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "currentAllocationPesos": 8500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34875",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415949",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san bonifacio · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34875",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415949",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34875",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san bonifacio · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34875",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544581",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36046",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598587",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san carlos · aliaga · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36046",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598587",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-34880",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. San Francisco, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481485",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
      "otherProject": "Construction (Completion) of Multi-purpose Building, Brgy. San Francisco, San Manuel, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34880",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481485",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
      "source_code": "2027DPWH-Proposal-37123",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 62000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo (10.943639, 122.635672)",
      "prior_amount": 75000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30517",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.943639,
        "longitude": 122.635672,
        "raw": "10.943639, 122.635672",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose ward · pototan · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo (10.943639, 122.635672)",
      "sourceLabel": "2027DPWH-Proposal-37123",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30517",
      "currentAllocationPesos": 62000000,
      "otherAllocationPesos": 75000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
      "source_code": "2027DPWH-Proposal-35698",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of Botolan, Zambales",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530383",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · botolan · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of Botolan, Zambales",
      "sourceLabel": "2027DPWH-Proposal-35698",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530383",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36047",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416484",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36047",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416484",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34873",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-purpose Building, Brgy. San Miguel, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597917",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
      "otherProject": "Completion of Multi-purpose Building, Brgy. San Miguel, Burgos, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34873",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597917",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36040",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33823",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36040",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33823",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "source_code": "2027DPWH-Proposal-01288",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, San Miguel, Mahinog, Camiguin",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547638",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 9.131037,
        "longitude": 124.783466,
        "raw": "124.783466,9.131037",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "otherProject": "Rehabilitation (Completion) of Multi-Purpose Building, San Miguel, Mahinog, Camiguin",
      "sourceLabel": "2027DPWH-Proposal-01288",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547638",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35878",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, San Ricardo, Talavera, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481845",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, San Ricardo, Talavera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35878",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481845",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35878",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598589",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san ricardo · talavera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35878",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598589",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
      "source_code": "2027DPWH-Proposal-36493",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Roque Ilaya Calauag, Quezon (13.946706°, 122.360431°)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35906",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.946706,
        "longitude": 122.360431,
        "raw": "13.946706°, 122.360431",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Roque Ilaya Calauag, Quezon (13.946706°, 122.360431°)",
      "sourceLabel": "2027DPWH-Proposal-36493",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35906",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "source_code": "2027DPWH-Proposal-34991",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Sisim, Peñablanca, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481455",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sisim · penablanca · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Sisim, Peñablanca, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34991",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481455",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35855",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544972",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "south west poblacion · nampicuan · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35855",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544972",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36045",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Tabacao, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416492",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Tabacao, Talavera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36045",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416492",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35765",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan (14.771199, 120.544899)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.771199,
        "longitude": 120.544899,
        "raw": "14.771199, 120.544899",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tabing ilog · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan (14.771199, 120.544899)",
      "sourceLabel": "2027DPWH-Proposal-35765",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33431",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35077",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597796",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "takiki · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35077",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597796",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. Taligan, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481378",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "otherProject": "Improvement of Multi-Purpose Building, Brgy. Taligan, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35017",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481378",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35017",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544473",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597814",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35017",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597814",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36696",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talisoy · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36696",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413726",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38578",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602543",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tran · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38578",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602543",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38578",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat(6.720811,124.049454)",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41628",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.720811,
        "longitude": 124.049454,
        "raw": "6.720811,124.049454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat(6.720811,124.049454)",
      "sourceLabel": "2027DPWH-Proposal-38578",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 41628",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "source_code": "2027DPWH-Proposal-39541",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Tubli, Caramoran, Catanduanes",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418340",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "otherProject": "Construction of Multi-Purpose Building, Tubli, Caramoran, Catanduanes",
      "sourceLabel": "2027DPWH-Proposal-39541",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418340",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "source_code": "2027DPWH-Proposal-39541",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596126",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tubli · caramoran · catanduanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "sourceLabel": "2027DPWH-Proposal-39541",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596126",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34893",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "turod · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34893",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597945",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
      "source_code": "2027DPWH-Proposal-34914",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Victoria, Alicia, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481535",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ian Paul Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · alicia · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Victoria, Alicia, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34914",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481535",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34881",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villa nuesa · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34881",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597940",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34884",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-purpose Building, Brgy. Vira, Roxas, Isabela",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "vira · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
      "otherProject": "Construction/Completion of Multi-purpose Building, Brgy. Vira, Roxas, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34884",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597929",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "source_code": "2027DPWH-Proposal-03564",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangca, Baliwag, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416336",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.987998,
        "longitude": 120.896441,
        "raw": "120.896441, 14.987998",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "otherProject": "Construction of Multi-Purpose Building, Barangca, Baliwag, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-03564",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416336",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City (14.657236, 120.948131)",
      "source_code": "2027DPWH-Proposal-34054",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 84000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City,  14.657167, 120.948126",
      "prior_amount": 100000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30194",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 7.7,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.657236,
        "longitude": 120.948131,
        "raw": "14.657236, 120.948131",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.657167,
        "longitude": 120.948126,
        "raw": "14.657167, 120.948126",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sipac-almacen · navotas city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City (14.657236, 120.948131)",
      "otherProject": "Construction of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City,  14.657167, 120.948126",
      "sourceLabel": "2027DPWH-Proposal-34054",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30194",
      "currentAllocationPesos": 84000000,
      "otherAllocationPesos": 100000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
      "source_code": "2027DPWH-Proposal-37778",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pitalo, San Fernando, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419526",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pitalo, San Fernando, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37778",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419526",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "source_code": "2027DPWH-Proposal-37143",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 6500000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Joaquin Multi-purpose Building, San Joaquin, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525685",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "otherProject": "Construction of San Joaquin Multi-purpose Building, San Joaquin, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37143",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525685",
      "currentAllocationPesos": 6500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "source_code": "2027DPWH-Proposal-37143",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 6500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Municipality of San Joaquin, Iloilo",
      "prior_amount": 5250000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546468",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Municipality of San Joaquin, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37143",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546468",
      "currentAllocationPesos": 6500000,
      "otherAllocationPesos": 5250000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34986",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Solana, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Solana, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34986",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597859",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Tunghaan, Minglanilla, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "otherProject": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Tunghaan, Minglanilla, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37779",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484116",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37779",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546961",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tunghaan, Minglanilla, Cebu (10.250968°, 123.781574°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38422",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.250968,
        "longitude": 123.781574,
        "raw": "10.250968°, 123.781574",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tunghaan, Minglanilla, Cebu (10.250968°, 123.781574°)",
      "sourceLabel": "2027DPWH-Proposal-37779",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 38422",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, at Barangay Cullit, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35053",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Cullit, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415766",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullit · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, at Barangay Cullit, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Cullit, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35053",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415766",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34653",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Talite, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544415",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Talite, Aguinaldo, Ifugao",
      "sourceLabel": "2027DPWH-Proposal-34653",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544415",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34653",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597691",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "otherProject": "Construction of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "sourceLabel": "2027DPWH-Proposal-34653",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597691",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34629",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Ubao, Aguinaldo, Ifugao",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481345",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "otherProject": "Construction of Multi-purpose Building, Ubao, Aguinaldo, Ifugao",
      "sourceLabel": "2027DPWH-Proposal-34629",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481345",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34629",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ubao, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Ubao, Aguinaldo, Ifugao",
      "sourceLabel": "2027DPWH-Proposal-34629",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597695",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35081",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35081",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35081",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "source_code": "2027DPWH-Proposal-33963",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597005",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "166 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "sourceLabel": "2027DPWH-Proposal-33963",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597005",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
      "source_code": "2027DPWH-Proposal-34815",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Calaba, Bangued, Abra",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Bernos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Calaba, Bangued, Abra",
      "sourceLabel": "2027DPWH-Proposal-34815",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481259",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484305",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City",
      "sourceLabel": "2027DPWH-Proposal-37787",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484305",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Guadalupe, Cebu City",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419759",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Guadalupe, Cebu City",
      "sourceLabel": "2027DPWH-Proposal-37787",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419759",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532161",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guadalupe · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37787",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532161",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38486",
      "office": "Davao del Norte District Engineering Office",
      "region": "Region XI",
      "amount_2027": 17000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building (Brgy. Hall), Barangay Camansa, Asuncion, Davao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532912",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "De Carlo Uy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
      "otherProject": "Construction of Multi-Purpose Building (Brgy. Hall), Barangay Camansa, Asuncion, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-38486",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532912",
      "currentAllocationPesos": 17000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
      "source_code": "2027DPWH-Proposal-39430",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Poblacion, Talisay, Camarines Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rosemarie Panotes"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Poblacion, Talisay, Camarines Norte",
      "sourceLabel": "2027DPWH-Proposal-39430",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596140",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22973)",
      "source_code": "2027DPWH-Proposal-11098",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22973)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22973,
        "raw": "14.88227, 120.22973",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22973,
        "raw": "14.88227 ,120.22973",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22973)",
      "otherProject": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22973)",
      "sourceLabel": "2027DPWH-Proposal-11098",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34389",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
      "source_code": "2027DPWH-Proposal-11106",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), East Bajac - Bajac, Olongapo City, Zambales (14.83624 ,120.28795)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34387",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.83624,
        "longitude": 120.28795,
        "raw": "14.83624, 120.28795",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.83624,
        "longitude": 120.28795,
        "raw": "14.83624 ,120.28795",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
      "otherProject": "Construction of Multi-Purpose Building, (Barangay Hall), East Bajac - Bajac, Olongapo City, Zambales (14.83624 ,120.28795)",
      "sourceLabel": "2027DPWH-Proposal-11106",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34387",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "source_code": "2027DPWH-Proposal-11088",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376 ,120.190068)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.943376,
        "longitude": 120.190068,
        "raw": "14.943376, 120.190068",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.943376,
        "longitude": 120.190068,
        "raw": "14.943376 ,120.190068",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "otherProject": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376 ,120.190068)",
      "sourceLabel": "2027DPWH-Proposal-11088",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34369",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864, 120.25706855)",
      "source_code": "2027DPWH-Proposal-11096",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864 ,120.25706855)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34375",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.86376864,
        "longitude": 120.25706855,
        "raw": "14.86376864, 120.25706855",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.86376864,
        "longitude": 120.25706855,
        "raw": "14.86376864 ,120.25706855",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864, 120.25706855)",
      "otherProject": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864 ,120.25706855)",
      "sourceLabel": "2027DPWH-Proposal-11096",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34375",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "source_code": "2027DPWH-Proposal-11109",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall) Barangay Sta. Rita, Olongapo City (14.84897 ,120.29113)",
      "prior_amount": 10500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34399",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.84897,
        "longitude": 120.29113,
        "raw": "14.84897, 120.29113",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.84897,
        "longitude": 120.29113,
        "raw": "14.84897 ,120.29113",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "otherProject": "Construction of Multi-Purpose Building, (Barangay Hall) Barangay Sta. Rita, Olongapo City (14.84897 ,120.29113)",
      "sourceLabel": "2027DPWH-Proposal-11109",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34399",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
      "source_code": "2027DPWH-Proposal-37632",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at DPWH-Bacolod City DEO Compound, Bacolod City (10.653285, 122.953680)",
      "prior_amount": 10928000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37767",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.653285,
        "longitude": 122.95368,
        "raw": "10.653285, 122.953680",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
      "otherProject": "Construction of Multi-Purpose Building at DPWH-Bacolod City DEO Compound, Bacolod City (10.653285, 122.953680)",
      "sourceLabel": "2027DPWH-Proposal-37632",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37767",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 10928000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34988",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597839",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "natappian east · solana · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34988",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597839",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039, 120.237729)",
      "source_code": "2027DPWH-Proposal-11095",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039 ,120.237729)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34371",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.889039,
        "longitude": 120.237729,
        "raw": "14.889039, 120.237729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.889039,
        "longitude": 120.237729,
        "raw": "14.889039 ,120.237729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mangan-vaca · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039, 120.237729)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039 ,120.237729)",
      "sourceLabel": "2027DPWH-Proposal-11095",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34371",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36287",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Agustin, Ibaan, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545493",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Agustin, Ibaan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36287",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545493",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "source_code": "2027DPWH-Proposal-09568",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599091",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "jaybanga · lobo · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09568",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599091",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "source_code": "2027DPWH-Proposal-22951",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 12000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building (Covered Court), Barangay 178, Caloocan City",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.753695,
        "longitude": 121.064569,
        "raw": "14.753695, 121.064569",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "otherProject": "Construction of Multi-purpose Building (Covered Court), Barangay 178, Caloocan City",
      "sourceLabel": "2027DPWH-Proposal-22951",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 480927",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36924",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417756",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alcate · victoria · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36924",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417756",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389, 120.228420)",
      "source_code": "2027DPWH-Proposal-11097",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389 ,120.228420)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.913389,
        "longitude": 120.22842,
        "raw": "14.913389, 120.228420",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.913389,
        "longitude": 120.22842,
        "raw": "14.913389 ,120.228420",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aningway-sacatihan · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389, 120.228420)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389 ,120.228420)",
      "sourceLabel": "2027DPWH-Proposal-11097",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34381",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
      "source_code": "2027DPWH-Proposal-38610",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Aroman, Carmen, Cotabato",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602349",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aroman · carmen · cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
      "otherProject": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Aroman, Carmen, Cotabato",
      "sourceLabel": "2027DPWH-Proposal-38610",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602349",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "source_code": "2027DPWH-Proposal-37893",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Bilwang, Kawayan, Biliran",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601315",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.699,
        "longitude": 124.39829,
        "raw": "124.398290°, 11.699000",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Brgy. Bilwang, Kawayan, Biliran",
      "sourceLabel": "2027DPWH-Proposal-37893",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601315",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36906",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, Calapan City, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gulod · calapan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, City of Calapan, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, Calapan City, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36906",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417745",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "source_code": "2027DPWH-Proposal-11089",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196 ,120.189947)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34383",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.943196,
        "longitude": 120.189947,
        "raw": "14.943196, 120.189947",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.943196,
        "longitude": 120.189947,
        "raw": "14.943196 ,120.189947",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "magsaysay · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196 ,120.189947)",
      "sourceLabel": "2027DPWH-Proposal-11089",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34383",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
      "source_code": "2027DPWH-Proposal-34940",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes (20.335943°, 121.871824°)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32694",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 20.335943,
        "longitude": 121.871824,
        "raw": "20.335943°, 121.871824",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malakdang · sabtang · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes (20.335943°, 121.871824°)",
      "sourceLabel": "2027DPWH-Proposal-34940",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32694",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76929°, 7.89914°)",
      "source_code": "2027DPWH-Proposal-01461",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76974°, 7.8991°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30780",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 49.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 7.89914,
        "longitude": 123.76929,
        "raw": "123.76929°, 7.89914",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 7.8991,
        "longitude": 123.76974,
        "raw": "123.76974°, 7.8991",
        "orientation": "longitude, latitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76929°, 7.89914°)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76974°, 7.8991°)",
      "sourceLabel": "2027DPWH-Proposal-01461",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30780",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34215",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597461",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salapingao · dagupan · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34215",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597461",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36626",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) in Barangay San Juan, San Pablo City, Laguna",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417488",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court) in Barangay San Juan, San Pablo City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36626",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417488",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 1500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "source_code": "2027DPWH-Proposal-01271",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bug-ong, Mambajao, Camiguin (124.677225666°,9.250853833°)",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40413",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 46.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 9.250525,
        "longitude": 124.676971666,
        "raw": "124.676971666, 9.250525",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 9.250853833,
        "longitude": 124.677225666,
        "raw": "124.677225666°,9.250853833",
        "orientation": "longitude, latitude",
        "decimalPlaces": 9,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Bug-ong, Mambajao, Camiguin (124.677225666°,9.250853833°)",
      "sourceLabel": "2027DPWH-Proposal-01271",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40413",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City",
      "source_code": "2027DPWH-Proposal-33964",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City, 14.730841, 121.020927",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31494",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.730841,
        "longitude": 121.020927,
        "raw": "14.730841, 121.020927",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "167 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City, 14.730841, 121.020927",
      "sourceLabel": "2027DPWH-Proposal-33964",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 31494",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-21338",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 531879",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maparat · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "otherProject": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-21338",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 531879",
      "currentAllocationPesos": 150000000,
      "otherAllocationPesos": 100000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "source_code": "2027DPWH-Proposal-11105",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (DSWD SWAD-Zambales Office), Olongapo City",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742, 120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "otherProject": "Construction of Multi-Purpose Building (DSWD SWAD-Zambales Office), Olongapo City",
      "sourceLabel": "2027DPWH-Proposal-11105",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598940",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "source_code": "2027DPWH-Proposal-11105",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742 ,120.285479)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34385",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742, 120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742 ,120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "otherProject": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742 ,120.285479)",
      "sourceLabel": "2027DPWH-Proposal-11105",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34385",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Gymnasium), Tandu- Bato, Luuk, Sulu",
      "source_code": "2027DPWH-Proposal-38172",
      "office": "Sulu 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 60000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Gymnasium), Tandu-Bato, Luuk, Sulu",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543633",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Abdulmunir Mundoc Arbison"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Gymnasium), Tandu- Bato, Luuk, Sulu",
      "otherProject": "Construction of Multi-Purpose Building (Gymnasium), Tandu-Bato, Luuk, Sulu",
      "sourceLabel": "2027DPWH-Proposal-38172",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543633",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 40000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-05152",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 835000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (INSPIRE Building), Laoag City, Ilocos Norte",
      "prior_amount": 300000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Sandro Marcos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (INSPIRE Building), Laoag City, Ilocos Norte",
      "sourceLabel": "2027DPWH-Proposal-05152",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543403",
      "currentAllocationPesos": 835000000,
      "otherAllocationPesos": 300000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37764",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Poblacion Ward I, Minglanilla, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484108",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "otherProject": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Poblacion Ward I, Minglanilla, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37764",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484108",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37764",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Ward I, Minglanilla, Cebu (10.24459°, 123.797915°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.24459,
        "longitude": 123.797915,
        "raw": "10.24459°, 123.797915",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Ward I, Minglanilla, Cebu (10.24459°, 123.797915°)",
      "sourceLabel": "2027DPWH-Proposal-37764",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 38394",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33608",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Bagumbayan, Bocaue, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530074",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Bagumbayan, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33608",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530074",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33608",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Bagumbayan, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598432",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building Barangay Bagumbayan, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33608",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598432",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33607",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Bambang, Bocaue, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Bambang, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33607",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598398",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Barangay Hall (Completion), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34125",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597202",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eugenio Angelo Barba"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Barangay Hall (Completion), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "sourceLabel": "2027DPWH-Proposal-34125",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597202",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
      "source_code": "2027DPWH-Proposal-11092",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675  ,120.229466)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30312",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.878675,
        "longitude": 120.229466,
        "raw": "14.878675, 120.229466",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.878675,
        "longitude": 120.229466,
        "raw": "14.878675  ,120.229466",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
      "otherProject": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675  ,120.229466)",
      "sourceLabel": "2027DPWH-Proposal-11092",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30312",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
      "source_code": "2027DPWH-Proposal-37326",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabalabaguan, Mina, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600622",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabalabaguan · mina · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cabalabaguan, Mina, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37326",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600622",
      "currentAllocationPesos": 20500000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Improvement Multi-Purpose Building, Lolomboy, Bocaue, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "otherProject": "Construction/Improvement Multi-Purpose Building, Lolomboy, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33600",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481710",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lolomboy, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525408",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lolomboy, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33600",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525408",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Lolomboy, Bocaue, Bulacan (14.781112, 120.933370)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.781112,
        "longitude": 120.93337,
        "raw": "14.781112, 120.933370",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Lolomboy, Bocaue, Bulacan (14.781112, 120.933370)",
      "sourceLabel": "2027DPWH-Proposal-33600",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33576",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33596",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tambubong, Bocaue, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530054",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tambubong, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33596",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530054",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "source_code": "2027DPWH-Proposal-33921",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 70000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay 390 Zone 40, Manila City",
      "prior_amount": 46500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529319",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.598462,
        "longitude": 120.9898245,
        "raw": "14.5984620, 120.9898245",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "390 zone 40  · manila city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "otherProject": "Construction of Multi-Purpose Building at Barangay 390 Zone 40, Manila City",
      "sourceLabel": "2027DPWH-Proposal-33921",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529319",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 46500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36351",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Abiawin, Infanta, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abiawin · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Abiawin, Infanta, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36351",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482726",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35069",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alba · baggao · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35069",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544464",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35069",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alba · baggao · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35069",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597792",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "source_code": "2027DPWH-Proposal-33902",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 73000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Alicia, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alicia · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "otherProject": "Rehabilitation of Multi Purpose Building at Brgy. Alicia, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33902",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466083",
      "currentAllocationPesos": 73000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "source_code": "2027DPWH-Proposal-33902",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 73000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Alicia, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415125",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alicia · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Alicia, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33902",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415125",
      "currentAllocationPesos": 73000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
      "source_code": "2027DPWH-Proposal-36342",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Alupay, Sampaloc, Quezon",
      "prior_amount": 3180000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alupay · sampaloc · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Alupay, Sampaloc, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36342",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482754",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3180000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
      "source_code": "2027DPWH-Proposal-36364",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Amaga, Patnanungan, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530856",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "amaga · patnanungan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Amaga, Patnanungan, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36364",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530856",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36365",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599552",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apad · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36365",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599552",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36365",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon (14.714683°, 122.420162°)",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35707",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.714683,
        "longitude": 122.420162,
        "raw": "14.714683°, 122.420162",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apad · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon (14.714683°, 122.420162°)",
      "sourceLabel": "2027DPWH-Proposal-36365",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35707",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "otherProject": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33905",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466084",
      "currentAllocationPesos": 54000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "prior_amount": 4800000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "otherProject": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33905",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413053",
      "currentAllocationPesos": 54000000,
      "otherAllocationPesos": 4800000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Bagong Pag-asa, Quezon City, 14.66251, 121.03321",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.66251,
        "longitude": 121.03321,
        "raw": "14.66251, 121.03321",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Bagong Pag-asa, Quezon City, 14.66251, 121.03321",
      "sourceLabel": "2027DPWH-Proposal-33905",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 31726",
      "currentAllocationPesos": 54000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28763",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 9000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Banay-Banay, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599174",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Banay-Banay, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-28763",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599174",
      "currentAllocationPesos": 9000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28763",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 9000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation Of Multi-Purpose Building At Barangay Banay-Banay, Lipa City, Batangas (13.934282°, 121.112479°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 25298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.934282,
        "longitude": 121.112479,
        "raw": "13.934282°, 121.112479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "otherProject": "Rehabilitation Of Multi-Purpose Building At Barangay Banay-Banay, Lipa City, Batangas (13.934282°, 121.112479°)",
      "sourceLabel": "2027DPWH-Proposal-28763",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 25298",
      "currentAllocationPesos": 9000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
      "source_code": "2027DPWH-Proposal-33586",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Baraka, Norzagaray, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530118",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraka · norzagaray · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Baraka, Norzagaray, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33586",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530118",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
      "source_code": "2027DPWH-Proposal-35475",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi Purpose Building at Barangay Buenlag, Gerona, Tarlac",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 15.627114,
        "longitude": 120.581505,
        "raw": "15.627114, 120.581505",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buenlag · gerona · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
      "otherProject": "Construction of Multi Purpose Building at Barangay Buenlag, Gerona, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-35475",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530342",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-36226",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Buhay na Tubig, Imus City, Cavite",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482535",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Buhay na Tubig, Imus City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36226",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482535",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-36226",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building at Buhay na Tubig, Imus, Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417265",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building at Buhay na Tubig, Imus, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36226",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417265",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "source_code": "2027DPWH-Proposal-31415",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building at Brgy. Buting, Pasig City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466212",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.55329035,
        "longitude": 121.0689975,
        "raw": "14.55329035, 121.0689975",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "otherProject": "Construction of Multi-purpose Building at Brgy. Buting, Pasig City",
      "sourceLabel": "2027DPWH-Proposal-31415",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466212",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Calendola, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417472",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Calendola, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36761",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417472",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building in Barangay Calendola, San Pedro City, Laguna",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530826",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "otherProject": "Construction (Completion) of Multi-Purpose Building in Barangay Calendola, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36761",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530826",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Calendola, San Pedro City, Laguna",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Calendola, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36761",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599443",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Calendola, City of San Pedro, Laguna (14.343225°, 121.036087°)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.343225,
        "longitude": 121.036087,
        "raw": "14.343225°, 121.036087",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Calendola, City of San Pedro, Laguna (14.343225°, 121.036087°)",
      "sourceLabel": "2027DPWH-Proposal-36761",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35545",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
      "source_code": "2027DPWH-Proposal-34483",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Alcala, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415484",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canarvacanan · alcala · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Alcala, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34483",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415484",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34271",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Binalonan, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canarvacanan · binalonan · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Binalonan, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34271",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544274",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37678",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "prior_amount": 550000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419592",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "candabong · dumanjug · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37678",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419592",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 550000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-37784",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Canduman, Mandaue City, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canduman · mandaue · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Canduman, Mandaue City, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37784",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484280",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Casuguran, Jomalig, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482731",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Casuguran, Jomalig, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36366",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482731",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Casuguran, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530866",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Casuguran, Jomalig, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36366",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530866",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599600",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36366",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599600",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon (14.714380°, 122.367384°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.71438,
        "longitude": 122.367384,
        "raw": "14.714380°, 122.367384",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon (14.714380°, 122.367384°)",
      "sourceLabel": "2027DPWH-Proposal-36366",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35723",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36420",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417473",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530814",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36420",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530814",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36420",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599444",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, City of San Pedro, Laguna (14.340566°, 121.047357°)",
      "prior_amount": 7000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35547",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.340566,
        "longitude": 121.047357,
        "raw": "14.340566°, 121.047357",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, City of San Pedro, Laguna (14.340566°, 121.047357°)",
      "sourceLabel": "2027DPWH-Proposal-36420",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35547",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building at Brgy. Cumba, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "otherProject": "Improvement of Multi-Purpose Building at Brgy. Cumba, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33866",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466610",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cumba, Lipa City, Batangas",
      "prior_amount": 5320000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cumba, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33866",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417150",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5320000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "prior_amount": 55000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595995",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33866",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595995",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 55000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35585",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598340",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dakila · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35585",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598340",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "source_code": "2027DPWH-Proposal-33903",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 69500000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Damar, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466086",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "damar · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "otherProject": "Rehabilitation of Multi Purpose Building at Brgy. Damar, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33903",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466086",
      "currentAllocationPesos": 69500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "source_code": "2027DPWH-Proposal-33903",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 69500000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Brgy. Damar, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525104",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "damar · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "otherProject": "Rehabilitation of Multi-Purpose Building at Brgy. Damar, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33903",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525104",
      "currentAllocationPesos": 69500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Del Carmen, Pagbilao, Quezon",
      "source_code": "2027DPWH-Proposal-36337",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Del Carmen, Pagbilao, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "del carmen · pagbilao · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Del Carmen, Pagbilao, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Del Carmen, Pagbilao, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36337",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529084",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36355",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Dinahican, Infanta, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dinahican · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Dinahican, Infanta, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36355",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482732",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37058",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "don pedro · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "otherProject": "Construction (Improvement) of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37058",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417945",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37057",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Happy Valley, Roxas, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Happy Valley, Roxas, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37057",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483058",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36096",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Inanama, Llanera, Nueva Ecija",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544993",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "inanama · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Inanama, Llanera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36096",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544993",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
      "source_code": "2027DPWH-Proposal-36339",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Kalyaat, Lucban, Quezon",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482718",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kalyaat · lucban · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Kalyaat, Lucban, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36339",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482718",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
      "source_code": "2027DPWH-Proposal-36769",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Kanluran Talaongan, Cavinti, Laguna",
      "prior_amount": 7700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482587",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kanluran talaongan · cavinti · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Kanluran Talaongan, Cavinti, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36769",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482587",
      "currentAllocationPesos": 6500000,
      "otherAllocationPesos": 7700000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36762",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Langgam, San Pedro City, Laguna",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "langgam · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Langgam, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36762",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599445",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
      "source_code": "2027DPWH-Proposal-36243",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lewin, Lumban, Laguna",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482585",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lewin · lumban · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lewin, Lumban, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36243",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482585",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35587",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598350",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lumbac · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "otherProject": "Rehabilitation of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35587",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598350",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37051",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "otherProject": "Completion of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37051",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599911",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37430",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Malingin, Bago City, Negros Occidental",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546815",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malingin · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Malingin, Bago City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37430",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546815",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36779",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 80000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 1, City of San Pedro, Laguna (14.345371°, 121.056255°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35571",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.345371,
        "longitude": 121.056255,
        "raw": "14.345371°, 121.056255",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pacita 1, City of San Pedro, Laguna (14.345371°, 121.056255°)",
      "sourceLabel": "2027DPWH-Proposal-36779",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35571",
      "currentAllocationPesos": 80000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36760",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 2, San Pedro City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599454",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pacita 2, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36760",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599454",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36760",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 70000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 2, City of San Pedro, Laguna (14.350064°, 121.048682°)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35573",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.350064,
        "longitude": 121.048682,
        "raw": "14.350064°, 121.048682",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pacita 2, City of San Pedro, Laguna (14.350064°, 121.048682°)",
      "sourceLabel": "2027DPWH-Proposal-36760",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35573",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28786",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 22000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. Pagolingin East, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pagolingin east · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "otherProject": "Improvement of Multi-Purpose Building, Brgy. Pagolingin East, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-28786",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482369",
      "currentAllocationPesos": 22000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37059",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417947",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "panaytayan · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "otherProject": "Construction (Improvement) of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37059",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417947",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33587",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481792",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "prior_amount": 8300000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414402",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33587",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414402",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 8300000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Patubig, Marilao, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Patubig, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33587",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595934",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35588",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.927881,
        "longitude": 120.841578,
        "raw": "14.927881, 120.841578",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "penabatan · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "sourceLabel": "2027DPWH-Proposal-35588",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
      "source_code": "2027DPWH-Proposal-34481",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pindangan Centro, Alcala, Pangasinan",
      "prior_amount": 5500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415495",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pindangan centro · alcala · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pindangan Centro, Alcala, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34481",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415495",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37053",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Poblacion Multi-Purpose Building, at Brgy. Poblacion, Bongabong, Oriental Mindoro",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545999",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
      "otherProject": "Construction of Poblacion Multi-Purpose Building, at Brgy. Poblacion, Bongabong, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37053",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545999",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35589",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35589",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37040",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531232",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · pinamalayan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37040",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531232",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37041",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417967",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sabang · pinamalayan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37041",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417967",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sablang, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36349",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sablang · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sablang, General Nakar, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36349",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37054",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sagana, Bongabong, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599951",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagana · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sagana, Bongabong, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37054",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599951",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "source_code": "2027DPWH-Proposal-36773",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "prior_amount": 11100000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san diego · luisiana · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36773",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530794",
      "currentAllocationPesos": 6500000,
      "otherAllocationPesos": 11100000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "source_code": "2027DPWH-Proposal-35240",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "prior_amount": 16000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529852",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.288839,
        "longitude": 121.807212,
        "raw": "17.288839, 121.807212",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san pedro · tumauini · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35240",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529852",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 16000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "source_code": "2027DPWH-Proposal-35240",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597905",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.288839,
        "longitude": 121.807212,
        "raw": "17.288839, 121.807212",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san pedro · tumauini · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35240",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597905",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
      "source_code": "2027DPWH-Proposal-36363",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Rafael, Burdeos, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482740",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san rafael · burdeos · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Rafael, Burdeos, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36363",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482740",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-36148",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 39500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building Barangay, San Rafael, Tarlac City, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
      "otherProject": "Construction (Completion) of Multi-Purpose Building Barangay, San Rafael, Tarlac City, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-36148",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530298",
      "currentAllocationPesos": 39500000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37072",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531234",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · bulalacao · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque, Bulalacao, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37072",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531234",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-35597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544870",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35597",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544870",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-35597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598423",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · paombong · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35597",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598423",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
      "source_code": "2027DPWH-Proposal-33566",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Vicente, Santa Maria, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Salvador Pleyto"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san vicente · santa maria · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Vicente, Santa Maria, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33566",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595929",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36097",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530178",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. barbara · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36097",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530178",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 25000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466060",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-23015",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466060",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 25000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 20750000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413049",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-23015",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413049",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 20750000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525129",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-23015",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525129",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35579",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan (14.817809, 120.857842)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33586",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.817809,
        "longitude": 120.857842,
        "raw": "14.817809, 120.857842",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taal · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan (14.817809, 120.857842)",
      "sourceLabel": "2027DPWH-Proposal-35579",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33586",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
      "source_code": "2027DPWH-Proposal-39397",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 8500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tamaoyan, Legazpi City, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546039",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tamaoyan · legazpi · albay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tamaoyan, Legazpi City, Albay",
      "sourceLabel": "2027DPWH-Proposal-39397",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546039",
      "currentAllocationPesos": 8500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
      "source_code": "2027DPWH-Proposal-36770",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Tibatib, Cavinti, Laguna",
      "prior_amount": 2800000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibatib · cavinti · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Tibatib, Cavinti, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36770",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482595",
      "currentAllocationPesos": 6500000,
      "otherAllocationPesos": 2800000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37435",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tibsoc, San Enrique, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419088",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibsoc · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tibsoc, San Enrique, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37435",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419088",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28760",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466636",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tipacan · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-28760",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466636",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36358",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tongohin, Infanta, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tongohin · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tongohin, Infanta, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36358",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525536",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37063",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417977",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "waygan · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-37063",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417977",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Brgy. Abaga (Covered Court), Lala, Lanao del Norte",
      "source_code": "2027DPWH-Proposal-39168",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Abaga, Lala, Lanao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547671",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abaga · lala · lanao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Brgy. Abaga (Covered Court), Lala, Lanao del Norte",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Abaga, Lala, Lanao del Norte",
      "sourceLabel": "2027DPWH-Proposal-39168",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547671",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
      "source_code": "2027DPWH-Proposal-34195",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 13000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Barangay Lingayen, Lingayen, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 567253",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
      "otherProject": "Construction of Multi Purpose Building, Barangay Lingayen, Lingayen, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34195",
      "otherSource": "FY2024 GAA · docs/GAA-2024.xlsx · row 567253",
      "currentAllocationPesos": 13000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36428",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Molino 4, City of Bacoor, Cavite",
      "prior_amount": 9000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417367",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Molino 4, City of Bacoor, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36428",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417367",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 9000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36428",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Molino 4, Bacoor City, Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599396",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Molino 4, Bacoor City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36428",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599396",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
      "source_code": "2027DPWH-Proposal-36149",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Gerona, Gerona, Tarlac",
      "prior_amount": 3100000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Gerona, Gerona, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-36149",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482105",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 3100000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Tongko, Tayabas City, Quezon",
      "source_code": "2027DPWH-Proposal-36329",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tongko, Tayabas, Quezon",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545713",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Tongko, Tayabas City, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tongko, Tayabas, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36329",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545713",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37566",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483403",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546370",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37566",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546370",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental (10.6717, 122.9465)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.6717,
        "longitude": 122.9465,
        "raw": "10.6717, 122.9465",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental (10.6717, 122.9465)",
      "sourceLabel": "2027DPWH-Proposal-37566",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37761",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37596",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 4, Isabela, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419017",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dino Yulo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "4 · isabela · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 4, Isabela, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37596",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419017",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37567",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alangilan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37567",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531610",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37567",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental (10.662042, 123.097617)",
      "prior_amount": 7500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37773",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.662042,
        "longitude": 123.097617,
        "raw": "10.662042, 123.097617",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alangilan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental (10.662042, 123.097617)",
      "sourceLabel": "2027DPWH-Proposal-37567",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37773",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466839",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37568",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466839",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "prior_amount": 12450000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413249",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37568",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413249",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 12450000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Banago, Bacolod City, Negros Occidental (10.708524, 122.950133)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37787",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.708524,
        "longitude": 122.950133,
        "raw": "10.708524, 122.950133",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Banago, Bacolod City, Negros Occidental (10.708524, 122.950133)",
      "sourceLabel": "2027DPWH-Proposal-37568",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37787",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531621",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37569",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531621",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600512",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37569",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600512",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental (10.59859, 122.94763)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37777",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.59859,
        "longitude": 122.94763,
        "raw": "10.59859, 122.94763",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental (10.59859, 122.94763)",
      "sourceLabel": "2027DPWH-Proposal-37569",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37777",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37570",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Estefania, Bacolod City, Negros Occidental",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600489",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estefania · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Estefania, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37570",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600489",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37606",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Galicia, Ilog, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531923",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "galicia · ilog · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Galicia, Ilog, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37606",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531923",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37572",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531594",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37572",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531594",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37572",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546375",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37572",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546375",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37599",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531899",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "iii · hinigaran · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37599",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531899",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38185",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi Purpose Building, Kigay, Malangas, Zamboanga Sibugay",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601702",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
      "otherProject": "Construction of Multi Purpose Building, Kigay, Malangas, Zamboanga Sibugay",
      "sourceLabel": "2027DPWH-Proposal-38185",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601702",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37581",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Luna, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600828",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Luna, Cadiz City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37581",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600828",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37579",
      "office": "Negros Occidental 5th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Minapasuk, Calatrava, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529112",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jules Ledesma"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minapasuk · calatrava · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Minapasuk, Calatrava, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37579",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529112",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419087",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37591",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419087",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37591",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600911",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37593",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Valladolid, Negros Occidental (10.4613787°, 122.8229880°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37991",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.4613787,
        "longitude": 122.822988,
        "raw": "10.4613787°, 122.8229880",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Valladolid, Negros Occidental (10.4613787°, 122.8229880°)",
      "sourceLabel": "2027DPWH-Proposal-37593",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37991",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37595",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Robles, La Castellana, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531904",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "robles · la castellana · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Robles, La Castellana, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37595",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531904",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39526",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta.Maria, Iriga City, Camarines Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546153",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Miguel Luis Villafuerte"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sta.Maria, Iriga City, Camarines Sur",
      "sourceLabel": "2027DPWH-Proposal-39526",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546153",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483411",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Tangub, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37575",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483411",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tangub · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Tangub, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37575",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418534",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546373",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tangub · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tangub, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37575",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546373",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37576",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villamonte · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37576",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531615",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38341",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420578",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kapatagan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay",
      "sourceLabel": "2027DPWH-Proposal-38341",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420578",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38341",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay (7.563494, 122.958533)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39953",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.563494,
        "longitude": 122.958533,
        "raw": "7.563494, 122.958533",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kapatagan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay (7.563494, 122.958533)",
      "sourceLabel": "2027DPWH-Proposal-38341",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 39953",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Lapirawan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38334",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lapirawan, Alicia, Zamboanga Sibugay (7.529492, 123.00937)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39965",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.529492,
        "longitude": 123.00937,
        "raw": "7.529492, 123.00937",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapirawan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Brgy. Lapirawan, Alicia, Zamboanga Sibugay",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Lapirawan, Alicia, Zamboanga Sibugay (7.529492, 123.00937)",
      "sourceLabel": "2027DPWH-Proposal-38334",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 39965",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38340",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi Purpose Building, Nanan, Payao, Zamboanga Sibugay",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601719",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
      "otherProject": "Completion of Multi Purpose Building, Nanan, Payao, Zamboanga Sibugay",
      "sourceLabel": "2027DPWH-Proposal-38340",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601719",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Pulo Mabao, Olutanga, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38338",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay (7.283705, 122.822725)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39979",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.283705,
        "longitude": 122.822725,
        "raw": "7.283705, 122.822725",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pulo mabao · olutanga · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Brgy. Pulo Mabao, Olutanga, Zamboanga Sibugay",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay (7.283705, 122.822725)",
      "sourceLabel": "2027DPWH-Proposal-38338",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 39979",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36645",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 47520000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Padre Garcia, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Padre Garcia, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36645",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417083",
      "currentAllocationPesos": 47520000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36645",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 47520000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "otherProject": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36645",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545401",
      "currentAllocationPesos": 47520000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "source_code": "2027DPWH-Proposal-35276",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, San Pablo, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529844",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.44767,
        "longitude": 121.79493,
        "raw": "17.44767, 121.79493",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san pablo · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Poblacion, San Pablo, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35276",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529844",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "source_code": "2027DPWH-Proposal-35276",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Pablo, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.44767,
        "longitude": 121.79493,
        "raw": "17.44767, 121.79493",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san pablo · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, San Pablo, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35276",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597911",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22969)",
      "source_code": "2027DPWH-Proposal-11100",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22969)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34397",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22969,
        "raw": "14.88227, 120.22969",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22969,
        "raw": "14.88227 ,120.22969",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "asinan proper · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22969)",
      "otherProject": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22969)",
      "sourceLabel": "2027DPWH-Proposal-11100",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34397",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
      "source_code": "2027DPWH-Proposal-34770",
      "office": "Benguet 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Ampusongan, Bakun, Benguet",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415663",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Ampusongan, Bakun, Benguet",
      "sourceLabel": "2027DPWH-Proposal-34770",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415663",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35084",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35084",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35084",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
      "source_code": "2027DPWH-Proposal-36752",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Brgy. Brgy. 3, Calamba City, Laguna",
      "prior_amount": 12000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599432",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Cha Hernandez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building Brgy. Brgy. 3, Calamba City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36752",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599432",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 12000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36450",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417222",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City",
      "sourceLabel": "2027DPWH-Proposal-36450",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417222",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36451",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City",
      "sourceLabel": "2027DPWH-Proposal-36451",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417223",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36451",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599337",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "48a · cavite · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36451",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599337",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36478",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "5 · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36478",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596058",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36454",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building Barangay 8, Cavite City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545508",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "8 · cavite · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building Barangay 8, Cavite City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36454",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545508",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37348",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "8 · kabankalan · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37348",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419052",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34682",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Abatan, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abatan · bauko · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Abatan, Bauko, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34682",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597723",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36964",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Aberawan, El Nido, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aberawan · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Aberawan, El Nido, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36964",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417805",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36551",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Acacia, Silang Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Acacia, Silang Cavite",
      "sourceLabel": "2027DPWH-Proposal-36551",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599398",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
      "source_code": "2027DPWH-Proposal-37096",
      "office": "Capiz 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Aganan, Dao, Capiz",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483461",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
      "otherProject": "Construction of Multi-Purpose Building, Aganan, Dao, Capiz",
      "sourceLabel": "2027DPWH-Proposal-37096",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483461",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35166",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Aguiguican, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481372",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aguiguican · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Aguiguican, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35166",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481372",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35166",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544470",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aguiguican · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35166",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544470",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "source_code": "2027DPWH-Proposal-37387",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418521",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alijis · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "sourceLabel": "2027DPWH-Proposal-37387",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418521",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34224",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan\n\n16.1475, 120.473905",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.1475,
        "longitude": 120.473905,
        "raw": "16.1475, 120.473905",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan\n\n16.1475, 120.473905",
      "sourceLabel": "2027DPWH-Proposal-34224",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32105",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "source_code": "2027DPWH-Proposal-36687",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530858",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apasan · sampaloc · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36687",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530858",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35639",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Banawang, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595830",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banawang · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Banawang, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35639",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595830",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483026",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "otherProject": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "sourceLabel": "2027DPWH-Proposal-37002",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483026",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building at Barangay Bancao-Bancao, City of Puerto Princesa, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531196",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "otherProject": "Construction of Multi-purpose Building at Barangay Bancao-Bancao, City of Puerto Princesa, Palawan",
      "sourceLabel": "2027DPWH-Proposal-37002",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531196",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bancao-bancao, Puerto Princesa City, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545951",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bancao-bancao, Puerto Princesa City, Palawan",
      "sourceLabel": "2027DPWH-Proposal-37002",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545951",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 5500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545256",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales",
      "sourceLabel": "2027DPWH-Proposal-11099",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545256",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Baraca-Camachile, Subic, Zambales",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598962",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Baraca-Camachile, Subic, Zambales",
      "sourceLabel": "2027DPWH-Proposal-11099",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598962",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.87718582  ,120.23410665)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34395",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 2.3,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.87718582,
        "longitude": 120.23410665,
        "raw": "14.87718582  ,120.23410665",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.87718582  ,120.23410665)",
      "sourceLabel": "2027DPWH-Proposal-11099",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34395",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37000",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Barake, Aborlan, Palawan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barake · aborlan · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Barake, Aborlan, Palawan",
      "sourceLabel": "2027DPWH-Proposal-37000",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483010",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38589",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baranayan · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38589",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485794",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34149",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Baresbes, Dingras, Ilocos Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baresbes · dingras · ilocos norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Baresbes, Dingras, Ilocos Norte",
      "sourceLabel": "2027DPWH-Proposal-34149",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481038",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34149",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baresbes · dingras · ilocos norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "sourceLabel": "2027DPWH-Proposal-34149",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544116",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36966",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Barotuan, El Nido, Palawan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482972",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barotuan · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Barotuan, El Nido, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36966",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482972",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38581",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Barurao I, Lebak, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485779",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barurao i · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Barurao I, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38581",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485779",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38581",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548151",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barurao i · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38581",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 548151",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "source_code": "2027DPWH-Proposal-37710",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Basak, Compostela, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484235",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Duke Frasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basak · compostela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Basak, Compostela, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37710",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484235",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "source_code": "2027DPWH-Proposal-37710",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Duke Frasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basak · compostela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37710",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419658",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35095",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 11000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598160",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bautista · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35095",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598160",
      "currentAllocationPesos": 11000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34684",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bila, Bauko, Mountain Province",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481353",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bila · bauko · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Bila, Bauko, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34684",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481353",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35678",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Binaritan, Morong, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595834",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "binaritan · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Binaritan, Morong, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35678",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595834",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35678",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Binaritan, Morong, Bataan (14.680013, 120.271425)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33491",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.680013,
        "longitude": 120.271425,
        "raw": "14.680013, 120.271425",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "binaritan · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "otherProject": "Construction of Multi Purpose Building, Brgy. Binaritan, Morong, Bataan (14.680013, 120.271425)",
      "sourceLabel": "2027DPWH-Proposal-35678",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33491",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38571",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "biwang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38571",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
      "source_code": "2027DPWH-Proposal-36953",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Borac, Coron, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "borac · coron · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. Borac, Coron, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36953",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482945",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
      "source_code": "2027DPWH-Proposal-36739",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Bulilan Sur, Pila, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530791",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bulilan sur · pila · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Bulilan Sur, Pila, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36739",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530791",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "source_code": "2027DPWH-Proposal-36476",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7500000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417560",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bungoy · dolores · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36476",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417560",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
      "source_code": "2027DPWH-Proposal-34908",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-purpose Building, Brgy. Bustamante, Luna, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bustamante · luna · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
      "otherProject": "Construction/Completion of Multi-purpose Building, Brgy. Bustamante, Luna, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34908",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597927",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35634",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543414",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabcaben · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35634",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543414",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37164",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo, 10.798691, 122.530600",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37577",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.798691,
        "longitude": 122.5306,
        "raw": "10.798691, 122.530600",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabugao sur · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo, 10.798691, 122.530600",
      "sourceLabel": "2027DPWH-Proposal-37164",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37577",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37477",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental (10.9501149, 123.181421)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37812",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.9501149,
        "longitude": 123.181421,
        "raw": "10.9501149, 123.181421",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caduha-an · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental (10.9501149, 123.181421)",
      "sourceLabel": "2027DPWH-Proposal-37477",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37812",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
      "source_code": "2027DPWH-Proposal-37162",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Cagamutan Norte, Leganes, Iloilo",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483673",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cagamutan norte · leganes · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Cagamutan Norte, Leganes, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37162",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483673",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "source_code": "2027DPWH-Proposal-36751",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545656",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Caingin, Santa Rosa City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36751",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545656",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "source_code": "2027DPWH-Proposal-36751",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa, Laguna (14.304787°, 121.124811°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35543",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.304787,
        "longitude": 121.124811,
        "raw": "14.304787°, 121.124811",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa, Laguna (14.304787°, 121.124811°)",
      "sourceLabel": "2027DPWH-Proposal-36751",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35543",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34689",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Completion of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415741",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caluttit · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "otherProject": "Completion of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34689",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415741",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "source_code": "2027DPWH-Proposal-34186",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 8000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 567251",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaley · binmaley · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "otherProject": "Construction of Multi Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34186",
      "otherSource": "FY2024 GAA · docs/GAA-2024.xlsx · row 567251",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416075",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "otherProject": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35094",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416075",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544676",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35094",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544676",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598114",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35094",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598114",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
      "source_code": "2027DPWH-Proposal-35788",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Centro II Multi-Purpose Building, Orani, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530024",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
      "otherProject": "Construction of Centro II Multi-Purpose Building, Orani, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35788",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530024",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36856",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Concepcion, Calintaan, Occidental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482893",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "concepcion · calintaan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Concepcion, Calintaan, Occidental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36856",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482893",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35253",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Culalabat, Cauayan, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "culalabat · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Culalabat, Cauayan, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35253",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598038",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35329",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35329",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 17000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35329",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "prior_amount": 40000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.099294,
        "longitude": 121.698193,
        "raw": "17.099294, 121.698193",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "sourceLabel": "2027DPWH-Proposal-35329",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 40000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-35036",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544469",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullit · camalaniugan · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35036",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544469",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "source_code": "2027DPWH-Proposal-35324",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416080",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "digumased · dinapigue · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "otherProject": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35324",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416080",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "source_code": "2027DPWH-Proposal-35324",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544686",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "digumased · dinapigue · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35324",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544686",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35086",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela, 16.533582, 121.719681",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33095",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.533582,
        "longitude": 121.719681,
        "raw": "16.533582, 121.719681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "disimpit · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela, 16.533582, 121.719681",
      "sourceLabel": "2027DPWH-Proposal-35086",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33095",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35336",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 41500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529860",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "district 3 · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35336",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529860",
      "currentAllocationPesos": 41500000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35336",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 41500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela, 17.0282, 121.6301",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32875",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.0282,
        "longitude": 121.6301,
        "raw": "17.0282, 121.6301",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "district 3 · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela, 17.0282, 121.6301",
      "sourceLabel": "2027DPWH-Proposal-35336",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32875",
      "currentAllocationPesos": 41500000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Dulangan, Puerto Galera, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36916",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Dulangan, Puerto Galera, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545910",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Dulangan, Puerto Galera, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building at Dulangan, Puerto Galera, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36916",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545910",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419674",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37722",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419674",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Esperanza, Poro, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532110",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Esperanza, Poro, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37722",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532110",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37722",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601083",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of (Completion) Multi-Purpose Building, Barangay Esperanza, Poro, Cebu (10.702302, 124.414909)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38722",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.702302,
        "longitude": 124.414909,
        "raw": "10.702302, 124.414909",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "otherProject": "Construction of (Completion) Multi-Purpose Building, Barangay Esperanza, Poro, Cebu (10.702302, 124.414909)",
      "sourceLabel": "2027DPWH-Proposal-37722",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 38722",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34896",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415936",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estrada · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34896",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415936",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34896",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529874",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estrada · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34896",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529874",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "source_code": "2027DPWH-Proposal-06346",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Gabawan, Odiongan, Romblon",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413849",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gabawan · odiongan · romblon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Gabawan, Odiongan, Romblon",
      "sourceLabel": "2027DPWH-Proposal-06346",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413849",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "source_code": "2027DPWH-Proposal-06346",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596115",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gabawan · odiongan · romblon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "sourceLabel": "2027DPWH-Proposal-06346",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596115",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36135",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Gomez, Llanera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481824",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Gomez, Llanera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36135",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481824",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35200",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Guiddam, Abulug, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415829",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guiddam · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Guiddam, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35200",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415829",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35200",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597824",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guiddam · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35200",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597824",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34690",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Guina-ang, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
      "otherProject": "Construction of Multi-Purpose Building, Guina-ang, Bontoc, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34690",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544439",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37365",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Handumanan, Bacolod City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600490",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Handumanan, Bacolod City",
      "sourceLabel": "2027DPWH-Proposal-37365",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600490",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
      "source_code": "2027DPWH-Proposal-35899",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Iba, Meycauayan City, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Iba, Meycauayan City, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35899",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481774",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35677",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543408",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ibis · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35677",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543408",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39346",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Igualdad, Naga City, Camarines Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Nelson Legacion"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "igualdad · naga · camarines sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Igualdad, Naga City, Camarines Sur",
      "sourceLabel": "2027DPWH-Proposal-39346",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531398",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36397",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kanluran, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545660",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kanluran · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Kanluran, Santa Rosa City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36397",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545660",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "source_code": "2027DPWH-Proposal-36519",
      "office": "Cavite 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 80000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596068",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Aniela Tolentino"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kaybagal south · tagaytay · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36519",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596068",
      "currentAllocationPesos": 80000000,
      "otherAllocationPesos": 60000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38580",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat (6.445332,124.311223)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30884",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.445332,
        "longitude": 124.311223,
        "raw": "6.445332,124.311223",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kiadsam · sen. ninoy aquino · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat (6.445332,124.311223)",
      "sourceLabel": "2027DPWH-Proposal-38580",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30884",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "source_code": "2027DPWH-Proposal-36477",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kinabuhayan · dolores · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36477",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596052",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38582",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat (6.119145,124.344441)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.119145,
        "longitude": 124.344441,
        "raw": "6.119145,124.344441",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kraan · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat (6.119145,124.344441)",
      "sourceLabel": "2027DPWH-Proposal-38582",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 41688",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38573",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 13000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat(6.459404,124.330895)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.459404,
        "longitude": 124.330895,
        "raw": "6.459404,124.330895",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat(6.459404,124.330895)",
      "sourceLabel": "2027DPWH-Proposal-38573",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 41710",
      "currentAllocationPesos": 13000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
      "source_code": "2027DPWH-Proposal-37281",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan - 11.808637, 122.156701",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37191",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 11.808637,
        "longitude": 122.156701,
        "raw": "11.808637, 122.156701",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan - 11.808637, 122.156701",
      "sourceLabel": "2027DPWH-Proposal-37281",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37191",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38717",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602329",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lanao · kidapawan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "sourceLabel": "2027DPWH-Proposal-38717",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602329",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38717",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lanao, City of Kidapawan, North Cotabato (125.07945, 7.024908)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41226",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.024908,
        "longitude": 125.07945,
        "raw": "125.07945, 7.024908",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Lanao, City of Kidapawan, North Cotabato (125.07945, 7.024908)",
      "sourceLabel": "2027DPWH-Proposal-38717",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 41226",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laoag, Aguilar, Pangasinan",
      "source_code": "2027DPWH-Proposal-34563",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 11000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Laoag, Aguilar, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481172",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laoag · aguilar · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Laoag, Aguilar, Pangasinan",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Laoag, Aguilar, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34563",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481172",
      "currentAllocationPesos": 11000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34188",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415457",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laois · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34188",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415457",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34188",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy Laois, Labrador, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laois · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy Laois, Labrador, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34188",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595789",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35078",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598175",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laurel · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35078",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598175",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
      "source_code": "2027DPWH-Proposal-36824",
      "office": "Marinduque District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 14000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Libas, Buenavista, Marinduque",
      "prior_amount": 14000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599748",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Reynaldo Salvacion"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libas · buenavista · marinduque",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
      "otherProject": "Construction of Multi-Purpose Building Barangay Libas, Buenavista, Marinduque",
      "sourceLabel": "2027DPWH-Proposal-36824",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599748",
      "currentAllocationPesos": 14000000,
      "otherAllocationPesos": 14000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Libertad, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35105",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481401",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Libertad, Abulug, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415780",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Libertad, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35105",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415780",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597817",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Libertad, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35105",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597817",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "source_code": "2027DPWH-Proposal-34187",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597426",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mark Cojuangco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libsong west · lingayen · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34187",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597426",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36841",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545897",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ligaya · sablayan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36841",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545897",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-36144",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Loma de Gato, Marilao, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Loma de Gato, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-36144",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481775",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-36144",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Loma De Gato, Marilao, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598451",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "loma de gato · marilao · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Loma De Gato, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-36144",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598451",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34242",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597440",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "longos central · san fabian · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34242",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597440",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37458",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Lopez Jaena, Sagay City, Negros Occidental",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483739",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lopez jaena · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Lopez Jaena, Sagay City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37458",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483739",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35633",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543415",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lucanin · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35633",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543415",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-35335",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35335",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-35335",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35335",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36965",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Mabini, El Nido, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482952",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabini · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. Mabini, El Nido, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36965",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482952",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "source_code": "2027DPWH-Proposal-37714",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419684",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macaas · catmon · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37714",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419684",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "source_code": "2027DPWH-Proposal-34153",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544199",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macaleeng · anda · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34153",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544199",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
      "source_code": "2027DPWH-Proposal-35745",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Macalong, La Paz, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416796",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
      "otherProject": "Construction of Multi-Purpose Building, Macalong, La Paz, Tarlac",
      "sourceLabel": "2027DPWH-Proposal-35745",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416796",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "source_code": "2027DPWH-Proposal-28905",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Maharlika, San Pedro, Laguna",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482647",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Maharlika, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-28905",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482647",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "source_code": "2027DPWH-Proposal-28905",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building. Barangay Maharlika, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530833",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "otherProject": "Construction of Multi-Purpose Building. Barangay Maharlika, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-28905",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530833",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35047",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malalatan · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35047",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544480",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maligaya, Lubang, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36864",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Maligaya, Lubang, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maligaya · lubang · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maligaya, Lubang, Occidental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Maligaya, Lubang, Occidental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36864",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531078",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37411",
      "office": "Negros Oriental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532215",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malongcay dacu · dauin · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "sourceLabel": "2027DPWH-Proposal-37411",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532215",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "source_code": "2027DPWH-Proposal-36385",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482483",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36385",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482483",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "source_code": "2027DPWH-Proposal-36385",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "prior_amount": 16600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414509",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36385",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414509",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 16600000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26599",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur (124.260010°, 7.974511°)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30764",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.974511,
        "longitude": 124.26001,
        "raw": "124.260010°, 7.974511",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur (124.260010°, 7.974511°)",
      "sourceLabel": "2027DPWH-Proposal-26599",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30764",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37460",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546725",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maquiling · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37460",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546725",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37460",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600823",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maquiling · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37460",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600823",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35234",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mararigue · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35234",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415942",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35234",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544590",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mararigue · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35234",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544590",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36396",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Market Area, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545661",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "market area · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Market Area, Santa Rosa City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36396",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545661",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36396",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna (14.318805°, 121.112146°)",
      "prior_amount": 35761000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35569",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.318805,
        "longitude": 121.112146,
        "raw": "14.318805°, 121.112146",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "market area · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna (14.318805°, 121.112146°)",
      "sourceLabel": "2027DPWH-Proposal-36396",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35569",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 35761000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "source_code": "2027DPWH-Proposal-36609",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596046",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "masiit · calauan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36609",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596046",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36480",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "prior_amount": 2500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mayao castillo · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36480",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596053",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36480",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon (13.932840°, 121.661626°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35844",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.93284,
        "longitude": 121.661626,
        "raw": "13.932840°, 121.661626",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mayao castillo · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon (13.932840°, 121.661626°)",
      "sourceLabel": "2027DPWH-Proposal-36480",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35844",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
      "source_code": "2027DPWH-Proposal-36252",
      "office": "Quezon 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Milagrosa, Catanauan, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milagrosa · catanauan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Milagrosa, Catanauan, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36252",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545788",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38590",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Milbuk, Palimbang, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milbuk · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Milbuk, Palimbang, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38590",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485806",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38590",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548171",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milbuk · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38590",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 548171",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-35334",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Brgy. Minagbag, Quezon, Isabela",
      "prior_amount": 1800000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481493",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minagbag · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "otherProject": "Construction/Improvement of Multi-Purpose Building, Brgy. Minagbag, Quezon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35334",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481493",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 1800000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-35334",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minagbag · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35334",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544576",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35245",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Minanga, San Mariano, Isabela",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544641",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minanga · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Minanga, San Mariano, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35245",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544641",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "source_code": "2027DPWH-Proposal-37188",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418579",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Howard Guintu"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mongpong · roxas · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "sourceLabel": "2027DPWH-Proposal-37188",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418579",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "source_code": "2027DPWH-Proposal-37188",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531645",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Howard Guintu"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mongpong · roxas · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "sourceLabel": "2027DPWH-Proposal-37188",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531645",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "source_code": "2027DPWH-Proposal-37297",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600387",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Florencio Miraflores"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "motag · malay · aklan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "otherProject": "Construction/Completion of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "sourceLabel": "2027DPWH-Proposal-37297",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600387",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35627",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Mt. View, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595825",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mt. view · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Mt. View, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35627",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595825",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mulawin, Naujan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36919",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Mulawin, Naujan, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mulawin · naujan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mulawin, Naujan, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Mulawin, Naujan, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36919",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482930",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34205",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597449",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nalsian · manaoag · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34205",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597449",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34338",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan(15.91154,120.83354)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.91154,
        "longitude": 120.83354,
        "raw": "15.91154,120.83354",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan(15.91154,120.83354)",
      "sourceLabel": "2027DPWH-Proposal-34338",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32280",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "source_code": "2027DPWH-Proposal-34990",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Nangalasauan, Amulung, Cagayan",
      "prior_amount": 900000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481449",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nangalasauan · amulung · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Nangalasauan, Amulung, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34990",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481449",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 900000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "source_code": "2027DPWH-Proposal-34990",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Nangalasauan, Amulung, Cagayan",
      "prior_amount": 600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415889",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Nangalasauan, Amulung, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34990",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415889",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 600000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35096",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela, 16.525883, 121.734987",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33111",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.525883,
        "longitude": 121.734987,
        "raw": "16.525883, 121.734987",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nemmatan · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela, 16.525883, 121.734987",
      "sourceLabel": "2027DPWH-Proposal-35096",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33111",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "source_code": "2027DPWH-Proposal-37719",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "northern poblacion · san francisco · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37719",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419690",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "source_code": "2027DPWH-Proposal-37719",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "northern poblacion · san francisco · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37719",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601078",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37508",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419883",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "obogon · tanjay · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "sourceLabel": "2027DPWH-Proposal-37508",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419883",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34219",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan\n\n16.060098, 120.422508",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32165",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.060098,
        "longitude": 120.422508,
        "raw": "16.060098, 120.422508",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan\n\n16.060098, 120.422508",
      "sourceLabel": "2027DPWH-Proposal-34219",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32165",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35676",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530034",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pag-asa · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35676",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530034",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34206",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Pao, Manaoag, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529604",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pao · manaoag · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Pao, Manaoag, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34206",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529604",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34206",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan\n\n16.050053, 120.50562",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32167",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.050053,
        "longitude": 120.50562,
        "raw": "16.050053, 120.50562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan\n\n16.050053, 120.50562",
      "sourceLabel": "2027DPWH-Proposal-34206",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32167",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34506",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan(15.922268,120.745122)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32282",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.922268,
        "longitude": 120.745122,
        "raw": "15.922268,120.745122",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan(15.922268,120.745122)",
      "sourceLabel": "2027DPWH-Proposal-34506",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32282",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building Barangay Pasong Camachile II, General Trias City, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417283",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pasong camachile ii · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building Barangay Pasong Camachile II, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36379",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417283",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530666",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pasong camachile ii · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36379",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530666",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-32304",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 55000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545896",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Odie Tarriela"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "payompon · mamburao · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-32304",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545896",
      "currentAllocationPesos": 55000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34507",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan(15.92422,120.82562)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32284",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.92422,
        "longitude": 120.82562,
        "raw": "15.92422,120.82562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan(15.92422,120.82562)",
      "sourceLabel": "2027DPWH-Proposal-34507",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32284",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481386",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinili · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35106",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481386",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "prior_amount": 12450000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414333",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinili · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35106",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414333",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 12450000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building at Brgy. Pinili, Abulug, Cagayan(18.373843°,121.397486°)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32766",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.373843,
        "longitude": 121.397486,
        "raw": "18.373843°,121.397486",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "otherProject": "Construction of Multi Purpose Building at Brgy. Pinili, Abulug, Cagayan(18.373843°,121.397486°)",
      "sourceLabel": "2027DPWH-Proposal-35106",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32766",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Pita, Dinalupihan, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416258",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Pita, Dinalupihan, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35648",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416258",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543412",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pita · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35648",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543412",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan (14.892437, 120.440146)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33513",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.892437,
        "longitude": 120.440146,
        "raw": "14.892437, 120.440146",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pita · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan (14.892437, 120.440146)",
      "sourceLabel": "2027DPWH-Proposal-35648",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33513",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35829",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35829",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416480",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35829",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530160",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35829",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530160",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37465",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion II, Sagay City, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483744",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ii · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Poblacion II, Sagay City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37465",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483744",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
      "source_code": "2027DPWH-Proposal-34871",
      "office": "Nueva Vizcaya District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya (16.51830, 121.17951)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33229",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.5183,
        "longitude": 121.17951,
        "raw": "16.51830, 121.17951",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion south · solano · nueva vizcaya",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya (16.51830, 121.17951)",
      "sourceLabel": "2027DPWH-Proposal-34871",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33229",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36036",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija, 15.543029, 120.761179",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33811",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.543029,
        "longitude": 120.761179,
        "raw": "15.543029, 120.761179",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion sur · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija, 15.543029, 120.761179",
      "sourceLabel": "2027DPWH-Proposal-36036",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33811",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36133",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay West Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 2500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545002",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay West Poblacion, Pantabangan, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36133",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545002",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "source_code": "2027DPWH-Proposal-37184",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531850",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · alimodian · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37184",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531850",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
      "source_code": "2027DPWH-Proposal-37321",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 25500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37321",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "currentAllocationPesos": 25500000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "source_code": "2027DPWH-Proposal-06373",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bansud, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545996",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.863888,
        "longitude": 121.4575,
        "raw": "121.457500°,12.863888",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bansud, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-06373",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545996",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "source_code": "2027DPWH-Proposal-37731",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Poblacion, Boljoon, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419633",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Poblacion, Boljoon, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37731",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419633",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "source_code": "2027DPWH-Proposal-37731",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · boljoon · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37731",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547000",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34691",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597721",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Poblacion, Bontoc, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34691",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597721",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38745",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 7500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30862",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.170586,
        "longitude": 124.689345,
        "raw": "124.689345,7.170586",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "sourceLabel": "2027DPWH-Proposal-38745",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30862",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38742",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao Del Sur 124.342114,6.992682",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31030",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.992682,
        "longitude": 124.342114,
        "raw": "124.342114,6.992682",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao Del Sur 124.342114,6.992682",
      "sourceLabel": "2027DPWH-Proposal-38742",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 31030",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38748",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 7500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596678",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · datu paglas · maguindanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-38748",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596678",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34191",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Labrador, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481187",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Poblacion, Labrador, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34191",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481187",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34191",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544233",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34191",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544233",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "source_code": "2027DPWH-Proposal-37181",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Leon, Iloilo",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483679",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Poblacion, Leon, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37181",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483679",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "source_code": "2027DPWH-Proposal-37181",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · leon · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37181",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600754",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35644",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Morong, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Poblacion, Morong, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35644",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416259",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35644",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543420",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35644",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543420",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37183",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Santa Barbara, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531855",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Santa Barbara, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37183",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531855",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37183",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600753",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37183",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600753",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
      "source_code": "2027DPWH-Proposal-38737",
      "office": "South Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato (6.612297, 124.747975)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.612297,
        "longitude": 124.747975,
        "raw": "6.612297, 124.747975",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · tantangan · south cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
      "otherProject": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato (6.612297, 124.747975)",
      "sourceLabel": "2027DPWH-Proposal-38737",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 41534",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "source_code": "2027DPWH-Proposal-37185",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · zarraga · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37185",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
      "source_code": "2027DPWH-Proposal-03053",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823217,
        "longitude": 122.609097,
        "raw": "10.823217, 122.609097",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · zarraga · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-03053",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38738",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building , Barangay Popol, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30856",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.170586,
        "longitude": 124.689345,
        "raw": "124.689345,7.170586",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building , Barangay Popol, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "sourceLabel": "2027DPWH-Proposal-38738",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30856",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37723",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419694",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "puertobello · tudela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37723",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 419694",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37723",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction / Completion of Multi Purpose Building, Brgy. Puertobello, Tudela, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 570728",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "puertobello · tudela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "otherProject": "Construction / Completion of Multi Purpose Building, Brgy. Puertobello, Tudela, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37723",
      "otherSource": "FY2024 GAA · docs/GAA-2024.xlsx · row 570728",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33864",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building at Brgy. Pusil, Lipa City, Batangas",
      "prior_amount": 4500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482459",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pusil · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
      "otherProject": "Rehabilitation/Improvement of Multi-Purpose Building at Brgy. Pusil, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33864",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482459",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36678",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Quilib, Rosario, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417117",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quilib · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Quilib, Rosario, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36678",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417117",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36678",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quilib · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36678",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35150",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36677",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quilo-Quilo North, Padre Garcia, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530522",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Quilo-Quilo North, Padre Garcia, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36677",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530522",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34164",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529584",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinaoayanan · bani · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34164",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529584",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "source_code": "2027DPWH-Proposal-34935",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "radiwan · ivana · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "sourceLabel": "2027DPWH-Proposal-34935",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529775",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "source_code": "2027DPWH-Proposal-34935",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597752",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "radiwan · ivana · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "sourceLabel": "2027DPWH-Proposal-34935",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597752",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34508",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan(15.894052,120.726567)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32258",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.894052,
        "longitude": 120.726567,
        "raw": "15.894052,120.726567",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan(15.894052,120.726567)",
      "sourceLabel": "2027DPWH-Proposal-34508",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32258",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35258",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35258",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544695",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35409",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "prior_amount": 25000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466424",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35409",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466424",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 25000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35409",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "prior_amount": 20750000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413159",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35409",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413159",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 20750000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34694",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597730",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saclit · sadanga · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34694",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597730",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "source_code": "2027DPWH-Proposal-35779",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sacrifice Valley, Hermosa Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sacrifice Valley, Hermosa Bataan",
      "sourceLabel": "2027DPWH-Proposal-35779",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481692",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "source_code": "2027DPWH-Proposal-35779",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building in Brgy. Sacrifice Valley, Hermosa, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sacrifice valley · hermosa · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "otherProject": "Construction of Multi-purpose Building in Brgy. Sacrifice Valley, Hermosa, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35779",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33443",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38577",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Sagasa, Esperanza, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagasa · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Sagasa, Esperanza, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38577",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485789",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38577",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548164",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagasa · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38577",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 548164",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37005",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545955",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagpangan · aborlan · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "sourceLabel": "2027DPWH-Proposal-37005",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545955",
      "currentAllocationPesos": 7500000,
      "otherAllocationPesos": 5500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35097",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salay · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "otherProject": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35097",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416083",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "source_code": "2027DPWH-Proposal-35900",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413618",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saluysoy · meycauayan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35900",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413618",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415834",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35415",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415834",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "prior_amount": 18000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35415",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597818",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 18000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan(18.353437°,121.475170°)",
      "prior_amount": 14800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.353437,
        "longitude": 121.47517,
        "raw": "18.353437°,121.475170",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan(18.353437°,121.475170°)",
      "sourceLabel": "2027DPWH-Proposal-35415",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32788",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 14800000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "source_code": "2027DPWH-Proposal-35407",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jun Gato"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "sourceLabel": "2027DPWH-Proposal-35407",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544445",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-26354",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Antonio, San Pedro, Laguna",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482656",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Antonio, San Pedro, Laguna",
      "sourceLabel": "2027DPWH-Proposal-26354",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482656",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481567",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35346",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481567",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35346",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529940",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598059",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "otherProject": "Rehabilitation of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35346",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598059",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela, 16.715905, 121.683631",
      "prior_amount": 12500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33025",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.715905,
        "longitude": 121.683631,
        "raw": "16.715905, 121.683631",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela, 16.715905, 121.683631",
      "sourceLabel": "2027DPWH-Proposal-35346",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33025",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 12500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417234",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36393",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417234",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530749",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36393",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530749",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545518",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36393",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545518",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35092",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35092",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529930",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "source_code": "2027DPWH-Proposal-35614",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Bataan Multi-Purpose Building, San Jose, Balanga, Bataan",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481709",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.671365,
        "longitude": 120.535013,
        "raw": "14.671365, 120.535013",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "otherProject": "Rehabilitation of Bataan Multi-Purpose Building, San Jose, Balanga, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35614",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481709",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "source_code": "2027DPWH-Proposal-35614",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay San Jose, City of Balanga, Bataan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598332",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.671365,
        "longitude": 120.535013,
        "raw": "14.671365, 120.535013",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "otherProject": "Construction of Multi-Purpose Building Barangay San Jose, City of Balanga, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35614",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598332",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
      "source_code": "2027DPWH-Proposal-36954",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. San Jose, Coron, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · coron · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. San Jose, Coron, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36954",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482961",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35087",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Jose, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529950",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Brgy. San Jose, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35087",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529950",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35087",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598171",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35087",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598171",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37160",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Improvement of Multi-Purpose Building, San Jose, San Miguel, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418853",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "otherProject": "Improvement of Multi-Purpose Building, San Jose, San Miguel, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37160",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418853",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37160",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546650",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · san miguel · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37160",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546650",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "source_code": "2027DPWH-Proposal-36960",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531138",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · dumaran · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36960",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531138",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "source_code": "2027DPWH-Proposal-36110",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of San Narciso, Zambales",
      "prior_amount": 4000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530384",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 15.003452,
        "longitude": 120.095337,
        "raw": "15.003452, 120.095337",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of San Narciso, Zambales",
      "sourceLabel": "2027DPWH-Proposal-36110",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530384",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35263",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 535000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building of Barangay San Luis, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san luis · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building of Barangay San Luis, Cauayan City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35263",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416053",
      "currentAllocationPesos": 535000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35263",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 535000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Luis, City of Cauayan, Isabela, 16.95551,121.82675",
      "prior_amount": 215000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30285",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.95551,
        "longitude": 121.82675,
        "raw": "16.95551,121.82675",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san luis · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Luis, City of Cauayan, Isabela, 16.95551,121.82675",
      "sourceLabel": "2027DPWH-Proposal-35263",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30285",
      "currentAllocationPesos": 535000000,
      "otherAllocationPesos": 215000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
      "source_code": "2027DPWH-Proposal-23541",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Miguel, Alaminos, Laguna",
      "prior_amount": 5016000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599494",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.051387,
        "longitude": 121.258098,
        "raw": "14.051387, 121.258098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · alaminos · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Miguel, Alaminos, Laguna",
      "sourceLabel": "2027DPWH-Proposal-23541",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599494",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5016000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
      "source_code": "2027DPWH-Proposal-34326",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay San Miguel, Balungao, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525216",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · balungao · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay San Miguel, Balungao, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34326",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525216",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-36991",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 9000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Miguel, City of Puerto Princesa, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531197",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Miguel, City of Puerto Princesa, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36991",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531197",
      "currentAllocationPesos": 9000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-36991",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 9000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "sourceLabel": "2027DPWH-Proposal-36991",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545946",
      "currentAllocationPesos": 9000000,
      "otherAllocationPesos": 5500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38583",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 533239",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38583",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 533239",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482382",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "otherProject": "Improvement of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36644",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482382",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545402",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36644",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545402",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, at Barangay San Roque, Rosario, Batangas (13.854494, 121.196690)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35014",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.854494,
        "longitude": 121.19669,
        "raw": "13.854494, 121.196690",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, at Barangay San Roque, Rosario, Batangas (13.854494, 121.196690)",
      "sourceLabel": "2027DPWH-Proposal-36644",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35014",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "source_code": "2027DPWH-Proposal-34996",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, San Vicente, Iguig, Cagayan",
      "prior_amount": 2200000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415863",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, San Vicente, Iguig, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34996",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415863",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2200000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "source_code": "2027DPWH-Proposal-34996",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "prior_amount": 2500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597897",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san vicente · iguig · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34996",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597897",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35670",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Saysain, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595832",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saysain · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Saysain, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35670",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595832",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35670",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan (14.570308, 120.394029)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33519",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.570308,
        "longitude": 120.394029,
        "raw": "14.570308, 120.394029",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saysain · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan (14.570308, 120.394029)",
      "sourceLabel": "2027DPWH-Proposal-35670",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33519",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
      "source_code": "2027DPWH-Proposal-38244",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City (6.931821°, 122.005694°) ",
      "prior_amount": 60000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.931821,
        "longitude": 122.005694,
        "raw": "6.931821°, 122.005694",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sinunuc · zamboanga city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City (6.931821°, 122.005694°) ",
      "sourceLabel": "2027DPWH-Proposal-38244",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30695",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 60000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36907",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Calapan City, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482912",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. isabel · calapan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, City of Calapan, Oriental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Calapan City, Oriental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36907",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482912",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35618",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Sta. Isabel, Dinalupihan, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Sta. Isabel, Dinalupihan, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35618",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481690",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
      "source_code": "2027DPWH-Proposal-34711",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Sta. Isabel, Natonin, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597734",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. isabel · natonin · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Sta. Isabel, Natonin, Mountain Province",
      "sourceLabel": "2027DPWH-Proposal-34711",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597734",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
      "source_code": "2027DPWH-Proposal-33562",
      "office": "Pampanga 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Sta. Monica, Floridablanca, Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
      "otherProject": "Construction of Multi-Purpose Building, Sta. Monica, Floridablanca, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-33562",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598806",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38698",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sto Niño, Kidapawan City, North Cotabato",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santo nino · kidapawan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sto Niño, Kidapawan City, North Cotabato",
      "sourceLabel": "2027DPWH-Proposal-38698",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485595",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33924",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480908",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sucat · muntinlupa city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "sourceLabel": "2027DPWH-Proposal-33924",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 480908",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33924",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "prior_amount": 32000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596751",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sucat · muntinlupa city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "sourceLabel": "2027DPWH-Proposal-33924",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596751",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 32000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37496",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/ Rehabilitation of Multi-purpose Building in Barangay Taclobo, Dumaguete City, Negros Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taclobo · dumaguete · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "otherProject": "Construction/ Rehabilitation of Multi-purpose Building in Barangay Taclobo, Dumaguete City, Negros Oriental",
      "sourceLabel": "2027DPWH-Proposal-37496",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413987",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37496",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental (9.314167, 123.28944)",
      "prior_amount": 4000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.314167,
        "longitude": 123.28944,
        "raw": "9.314167, 123.28944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taclobo · dumaguete · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "otherProject": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental (9.314167, 123.28944)",
      "sourceLabel": "2027DPWH-Proposal-37496",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 38078",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36715",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Talaibon, Ibaan, Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530516",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talaibon · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Talaibon, Ibaan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36715",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530516",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36715",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Talaibon, Ibaan, Batangas",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599293",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talaibon · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Talaibon, Ibaan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36715",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599293",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 30000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38587",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibpuan · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38587",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 548156",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38587",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602541",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibpuan · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38587",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602541",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37403",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "prior_amount": 3700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37403",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418961",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 3700000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36845",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Tuban, Sablayan, Occidental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482906",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tuban · sablayan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Tuban, Sablayan, Occidental Mindoro",
      "sourceLabel": "2027DPWH-Proposal-36845",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482906",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35088",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Barangay Tupax, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598074",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tupax · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
      "otherProject": "Construction (Completion) of Multi-purpose Building, Barangay Tupax, Jones, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35088",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598074",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35079",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544681",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "turod sur · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35079",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544681",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37751",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ubaub · argao · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37751",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532084",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35830",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Victoria, Llanera, Nueva Ecija",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481812",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Victoria, Llanera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35830",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481812",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35830",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598561",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-35830",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598561",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35261",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building of Barangay Villa Luna, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416055",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villa luna · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
      "otherProject": "Construction of Multi-Purpose Building of Barangay Villa Luna, Cauayan City, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35261",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416055",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "source_code": "2027DPWH-Proposal-37161",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Wari-Wari, New Lucena, Iloilo",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Wari-Wari, New Lucena, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37161",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 483692",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "source_code": "2027DPWH-Proposal-37161",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Wari-Wari, New Lucena, Iloilo",
      "prior_amount": 5050000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Wari-Wari, New Lucena, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37161",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600788",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5050000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35766",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. West Calaguiman, Samal, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416250",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "west calaguiman · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. West Calaguiman, Samal, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35766",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416250",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35766",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530027",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "west calaguiman · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35766",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530027",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37484",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "zone 6 · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37484",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546738",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "source_code": "2027DPWH-Proposal-37973",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532308",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.67525,
        "longitude": 124.796548,
        "raw": "10.675250, 124.796548",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "otherProject": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "sourceLabel": "2027DPWH-Proposal-37973",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532308",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38949",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420707",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "daguan · kapatagan · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-38949",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420707",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38949",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur (124.214436°, 7.542336°)",
      "prior_amount": 7500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.542336,
        "longitude": 124.214436,
        "raw": "124.214436°, 7.542336",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur (124.214436°, 7.542336°)",
      "sourceLabel": "2027DPWH-Proposal-38949",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30754",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Tongantongan, Municipality of Madalum, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38953",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tongantongan, Madalum, Lanao del Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tongantongan · madalum · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy Tongantongan, Municipality of Madalum, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tongantongan, Madalum, Lanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-38953",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420738",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Likud Tabawan, South Ubian, Tawi-Tawi",
      "source_code": "2027DPWH-Proposal-38248",
      "office": "Regional Office IX BARMM",
      "region": "Region IX",
      "amount_2027": 16000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Likud Tabawan, South Ubian, Tawi-Tawi",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484698",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Likud Tabawan, South Ubian, Tawi-Tawi",
      "otherProject": "Construction of Multi-Purpose Building, Likud Tabawan, South Ubian, Tawi-Tawi",
      "sourceLabel": "2027DPWH-Proposal-38248",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484698",
      "currentAllocationPesos": 16000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38213",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 7000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Little Margos, Tungawan, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484919",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "otherProject": "Construction of Multi-Purpose Building, Little Margos, Tungawan, Zamboanga Sibugay",
      "sourceLabel": "2027DPWH-Proposal-38213",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484919",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38213",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532477",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "little margos · tungawan · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
      "sourceLabel": "2027DPWH-Proposal-38213",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532477",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39027",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · lugait · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39027",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602008",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39027",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental (124.259861°, 8.342981°)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.342981,
        "longitude": 124.259861,
        "raw": "124.259861°, 8.342981",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental (124.259861°, 8.342981°)",
      "sourceLabel": "2027DPWH-Proposal-39027",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40692",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Sibutad, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38254",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Sibutad, Zamboanga del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420462",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · sibutad · zamboanga del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Brgy. Poblacion, Sibutad, Zamboanga del Norte",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Sibutad, Zamboanga del Norte",
      "sourceLabel": "2027DPWH-Proposal-38254",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420462",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35514",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35514",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481945",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 700000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35514",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525450",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "otherProject": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35514",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525450",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26642",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-26642",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543659",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34987",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "prior_amount": 13203000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34987",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 605793",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 13203000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39301",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Cabusao, Camarines Sur",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546080",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
      "otherProject": "Construction of Multi-Purpose Building at Cabusao, Camarines Sur",
      "sourceLabel": "2027DPWH-Proposal-39301",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546080",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "source_code": "2027DPWH-Proposal-34776",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-purpose Building, Camdas, Baguio City",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481327",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "otherProject": "Rehabilitation of Multi-purpose Building, Camdas, Baguio City",
      "sourceLabel": "2027DPWH-Proposal-34776",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481327",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "source_code": "2027DPWH-Proposal-27338",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 531847",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cadlan · pili · camarines sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "otherProject": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "sourceLabel": "2027DPWH-Proposal-27338",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 531847",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 150000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
      "source_code": "2027DPWH-Proposal-37306",
      "office": "Guimaras District Engineering Office",
      "region": "Region VI",
      "amount_2027": 25000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-purpose Building, Capitol Grounds, Barangay San Miguel, Jordan, Guimaras",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546425",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "JC Rahman Nava"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
      "otherProject": "Construction of Multi-purpose Building, Capitol Grounds, Barangay San Miguel, Jordan, Guimaras",
      "sourceLabel": "2027DPWH-Proposal-37306",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546425",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35486",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Completion (Rehabilitation) of Dela Paz Multi-purpose Building, Brgy. Dela Paz, San Simon, Pampanga",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
      "otherProject": "Completion (Rehabilitation) of Dela Paz Multi-purpose Building, Brgy. Dela Paz, San Simon, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35486",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530259",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "source_code": "2027DPWH-Proposal-09637",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Department of Agriculture), Barangay Marawoy, Lipa City, Batangas",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605753",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 13.962243,
        "longitude": 121.173008,
        "raw": "13.962243, 121.173008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "marawoy · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "otherProject": "Construction of Multi-Purpose Building (Department of Agriculture), Barangay Marawoy, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09637",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 605753",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 150000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "source_code": "2027DPWH-Proposal-03492",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Frances, Calumpit, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.919208,
        "longitude": 120.762592,
        "raw": "120.762592, 14.919208",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Frances, Calumpit, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-03492",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544859",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "source_code": "2027DPWH-Proposal-03492",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Frances, Calumpit, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.919208,
        "longitude": 120.762592,
        "raw": "120.762592, 14.919208",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "otherProject": "Construction of Multi-Purpose Building at Brgy. Frances, Calumpit, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-03492",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598341",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35515",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation (Completion) of Lanang Multi-Purpose Building, Barangay Lanang, Candaba, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
      "otherProject": "Rehabilitation (Completion) of Lanang Multi-Purpose Building, Barangay Lanang, Candaba, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35515",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525445",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Basista, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481186",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Poblacion, Basista, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34441",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481186",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Basista, Pangasinan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529614",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, Basista, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34441",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529614",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy Poblacion, Basista, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595786",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy Poblacion, Basista, Pangasinan",
      "sourceLabel": "2027DPWH-Proposal-34441",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595786",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Basista, Pangasinan\n\n15.84947, 120.40228",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32193",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.84947,
        "longitude": 120.40228,
        "raw": "15.84947, 120.40228",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion Basista, Pangasinan\n\n15.84947, 120.40228",
      "sourceLabel": "2027DPWH-Proposal-34441",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32193",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38433",
      "office": "Davao de Oro 1st District Engineering Office",
      "region": "Region XI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602091",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jhong Ceniza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "napnapan · pantukan · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "otherProject": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "sourceLabel": "2027DPWH-Proposal-38433",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602091",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37273",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Enrique Multi-purpose Building, San Enrique, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525687",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "otherProject": "Construction of San Enrique Multi-purpose Building, San Enrique, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37273",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525687",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37273",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546533",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "otherProject": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-37273",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546533",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
      "source_code": "2027DPWH-Proposal-35508",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Matias, Sto. Tomas,Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Matias, Sto. Tomas,Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35508",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525439",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "source_code": "2027DPWH-Proposal-35525",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay San Rafael, Macabebe, Pampanga",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481956",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Rafael, Macabebe, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35525",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481956",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 700000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "source_code": "2027DPWH-Proposal-35525",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Completion (Rehabilitation) of San Rafael Multi-Purpose Building, Brgy. San Rafael, Macabebe, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530266",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "otherProject": "Completion (Rehabilitation) of San Rafael Multi-Purpose Building, Brgy. San Rafael, Macabebe, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35525",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530266",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 5500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416596",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Vicente, Apalit, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35492",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416596",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525441",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35492",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525441",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation (Completion) of San Vicente Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545108",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "otherProject": "Rehabilitation (Completion) of San Vicente Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "sourceLabel": "2027DPWH-Proposal-35492",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545108",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "source_code": "2027DPWH-Proposal-22726",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "hulo · mandaluyong city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "otherProject": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "sourceLabel": "2027DPWH-Proposal-22726",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595669",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 70000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Subic Fishing Port, Subic Zambales (14.8762, 120.2324)",
      "source_code": "2027DPWH-Proposal-11091",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Subic Fishing Port, Zambales (14.8762 ,120.2324)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30310",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.8762,
        "longitude": 120.2324,
        "raw": "14.8762, 120.2324",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.8762,
        "longitude": 120.2324,
        "raw": "14.8762 ,120.2324",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Subic Fishing Port, Subic Zambales (14.8762, 120.2324)",
      "otherProject": "Construction of Multi-Purpose Building, Subic Fishing Port, Zambales (14.8762 ,120.2324)",
      "sourceLabel": "2027DPWH-Proposal-11091",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30310",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Turo, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525406",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Turo, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33595",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525406",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544848",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33595",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544848",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "source_code": "2027DPWH-Proposal-33980",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596977",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "173 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "otherProject": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "sourceLabel": "2027DPWH-Proposal-33980",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596977",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "source_code": "2027DPWH-Proposal-03052",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5500000,
      "comparison_year": 2023,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823044,
        "longitude": 122.609778,
        "raw": "10.823044, 122.609778",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "otherProject": "Construction/Improvement of Multi-Purpose Building, Zarraga, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-03052",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546659",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "source_code": "2027DPWH-Proposal-03052",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Zarraga, Iloilo",
      "prior_amount": 5050000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600786",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823044,
        "longitude": 122.609778,
        "raw": "10.823044, 122.609778",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "otherProject": "Construction of Multi-Purpose Building, Zarraga, Iloilo",
      "sourceLabel": "2027DPWH-Proposal-03052",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 600786",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 5050000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38298",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 12000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "prior_amount": 9000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484837",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "otherProject": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "sourceLabel": "2027DPWH-Proposal-38298",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484837",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 9000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38298",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601644",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "otherProject": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "sourceLabel": "2027DPWH-Proposal-38298",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 601644",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 35000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "otherProject": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "sourceLabel": "2027DPWH-Proposal-05312",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413389",
      "currentAllocationPesos": 200000000,
      "otherAllocationPesos": 35000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 90000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524868",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "otherProject": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "sourceLabel": "2027DPWH-Proposal-05312",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 524868",
      "currentAllocationPesos": 200000000,
      "otherAllocationPesos": 90000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 61500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "otherProject": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "sourceLabel": "2027DPWH-Proposal-05312",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 605745",
      "currentAllocationPesos": 200000000,
      "otherAllocationPesos": 61500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "source_code": "2027DPWH-Proposal-34812",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Western Uma Multi-purpose Building, Western Uma, Lubuagan, Kalinga",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481348",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "otherProject": "Construction (Completion) of Western Uma Multi-purpose Building, Western Uma, Lubuagan, Kalinga",
      "sourceLabel": "2027DPWH-Proposal-34812",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481348",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-35231",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building, Barangay San Placido, Roxas, Isabela, 17.14644,121.582101",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32903",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.14644,
        "longitude": 121.582101,
        "raw": "17.14644,121.582101",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san placido · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Barangay San Placido, Roxas, Isabela, 17.14644,121.582101",
      "sourceLabel": "2027DPWH-Proposal-35231",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32903",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35141",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Gangalan, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544640",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "otherProject": "Construction of Multi-Purpose Building at Barangay San Gangalan, San Mariano, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35141",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544640",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35141",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela (16.897832, 122.062504)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.897832,
        "longitude": 122.062504,
        "raw": "16.897832, 122.062504",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gangalan · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela (16.897832, 122.062504)",
      "sourceLabel": "2027DPWH-Proposal-35141",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32946",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "source_code": "2027DPWH-Proposal-22738",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529217",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "maybunga · pasig city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "sourceLabel": "2027DPWH-Proposal-22738",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529217",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "source_code": "2027DPWH-Proposal-22738",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596850",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "maybunga · pasig city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "sourceLabel": "2027DPWH-Proposal-22738",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 596850",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37666",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion West, Moalboal, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532135",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion west · moalboal · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion West, Moalboal, Cebu",
      "sourceLabel": "2027DPWH-Proposal-37666",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532135",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37437",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Dulao, Bago City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dulao · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Dulao, Bago City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37437",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546806",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39170",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420981",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agusan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39170",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420981",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39170",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532665",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agusan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39170",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532665",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39171",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485163",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bugo · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39171",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485163",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39171",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420983",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bugo · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39171",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420983",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420963",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39172",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420963",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bulua · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39172",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 547610",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Bulua, Cagayan de Oro City, Misamis Oriental (124.61333°, 8.48111°)",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40307",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.48111,
        "longitude": 124.61333,
        "raw": "124.61333°, 8.48111",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Bulua, Cagayan de Oro City, Misamis Oriental (124.61333°, 8.48111°)",
      "sourceLabel": "2027DPWH-Proposal-39172",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40307",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39173",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420978",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaman-an · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39173",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420978",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485155",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39175",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485155",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Carmen, Cagayan De Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420973",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Brgy. Carmen, Cagayan De Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39175",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420973",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532657",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39175",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532657",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Carmen, Cagayan de Oro City, Misamis Oriental (124.6088°, 8.4594°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40309",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.4594,
        "longitude": 124.6088,
        "raw": "124.6088°, 8.4594",
        "orientation": "longitude, latitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Carmen, Cagayan de Oro City, Misamis Oriental (124.6088°, 8.4594°)",
      "sourceLabel": "2027DPWH-Proposal-39175",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40309",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39176",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485164",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "consolacion · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39176",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485164",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39176",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532666",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "consolacion · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39176",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532666",
      "currentAllocationPesos": 5500000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39177",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420984",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cugman · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39177",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420984",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39177",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental (124.70591° , 8.470591°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40372",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.470591,
        "longitude": 124.70591,
        "raw": "124.70591° , 8.470591",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental (124.70591° , 8.470591°)",
      "sourceLabel": "2027DPWH-Proposal-39177",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40372",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39178",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dansolihon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39178",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532658",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 479037",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39179",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 479037",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39179",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420988",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532664",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39179",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532664",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39180",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 8000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macabalan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39180",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420989",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39180",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532668",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macabalan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39180",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 532668",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39182",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485162",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tablon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39182",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 485162",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39182",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420992",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tablon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
      "sourceLabel": "2027DPWH-Proposal-39182",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420992",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "source_code": "2027DPWH-Proposal-31397",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "prior_amount": 18000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "otherProject": "Construction of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "sourceLabel": "2027DPWH-Proposal-31397",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 524987",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 18000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38440",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421537",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Manuel Lagdameo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "otherProject": "Construction of Multi-Purpose Building (Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "sourceLabel": "2027DPWH-Proposal-38440",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 421537",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36271",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction/Completion of Multi-Purpose Building (Covered Court) in Brgy. Sico 1, San Juan, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sico 1 · san juan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
      "otherProject": "Construction/Completion of Multi-Purpose Building (Covered Court) in Brgy. Sico 1, San Juan, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36271",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545394",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645, 120.22210897)",
      "source_code": "2027DPWH-Proposal-11101",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645 ,120.22210897)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.92417645,
        "longitude": 120.22210897,
        "raw": "14.92417645, 120.22210897",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.92417645,
        "longitude": 120.22210897,
        "raw": "14.92417645 ,120.22210897",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pamatawan · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645, 120.22210897)",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645 ,120.22210897)",
      "sourceLabel": "2027DPWH-Proposal-11101",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34403",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
      "source_code": "2027DPWH-Proposal-34936",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 9000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana, Batanes (20.368555°, 121.913798°)",
      "prior_amount": 9000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32704",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 20.368555,
        "longitude": 121.913798,
        "raw": "20.368555°, 121.913798",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana, Batanes (20.368555°, 121.913798°)",
      "sourceLabel": "2027DPWH-Proposal-34936",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32704",
      "currentAllocationPesos": 9000000,
      "otherAllocationPesos": 9000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044, 120.25723454)",
      "source_code": "2027DPWH-Proposal-11102",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044 ,120.25723454)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34405",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.86388044,
        "longitude": 120.25723454,
        "raw": "14.86388044, 120.25723454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.86388044,
        "longitude": 120.25723454,
        "raw": "14.86388044 ,120.25723454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044, 120.25723454)",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044 ,120.25723454)",
      "sourceLabel": "2027DPWH-Proposal-11102",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 34405",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38904",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602630",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligaman · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "sourceLabel": "2027DPWH-Proposal-38904",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602630",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Municipality of Mambajao, Province of Camiguin",
      "source_code": "2027DPWH-Proposal-39133",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jurdin Jesus Romualdo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.242903166,
        "longitude": 124.663196,
        "raw": "124.663196°,9.242903166",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Municipality of Mambajao, Province of Camiguin",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "sourceLabel": "2027DPWH-Proposal-39133",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "source_code": "2027DPWH-Proposal-01274",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 51.5,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 9.2429296,
        "longitude": 124.6636647,
        "raw": "124.6636647, 9.2429296",
        "orientation": "longitude, latitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 9.242903166,
        "longitude": 124.663196,
        "raw": "124.663196°,9.242903166",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "otherProject": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "sourceLabel": "2027DPWH-Proposal-01274",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38570",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421992",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bai saripinang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38570",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 421992",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 1000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Caingin, Bocaue, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Caingin, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33602",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481738",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 1500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530050",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33602",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530050",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598400",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33602",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598400",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Taal, Bocaue, Bulacan (14.812748, 120.932681)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33594",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.812748,
        "longitude": 120.932681,
        "raw": "14.812748, 120.932681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Taal, Bocaue, Bulacan (14.812748, 120.932681)",
      "sourceLabel": "2027DPWH-Proposal-33597",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33594",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 15000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33594",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Multi-Purpose Building, Barangay Wakas, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
      "otherProject": "Improvement of Multi-Purpose Building, Barangay Wakas, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33594",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544818",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "source_code": "2027DPWH-Proposal-28819",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay 7, Lipa City, Batangas",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599173",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "otherProject": "Construction of Multi-Purpose Building at Barangay 7, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-28819",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599173",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 25000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Balintawak, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 475286",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Balintawak, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33867",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 475286",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417155",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-33867",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417155",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36422",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Narra, San Pedro City, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599446",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "narra · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Narra, San Pedro City, Laguna",
      "sourceLabel": "2027DPWH-Proposal-36422",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599446",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
      "source_code": "2027DPWH-Proposal-33904",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 18000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Brgy. Siena, Quezon City",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525106",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "siena · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
      "otherProject": "Rehabilitation of Multi-Purpose Building at Brgy. Siena, Quezon City",
      "sourceLabel": "2027DPWH-Proposal-33904",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525106",
      "currentAllocationPesos": 18000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-35595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 13000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sto. Nino, Calumpit, Bulacan",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santo nino · calumpit · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Sto. Nino, Calumpit, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35595",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481747",
      "currentAllocationPesos": 13000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35675",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Atilano Ricardo, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "atilano ricardo · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Atilano Ricardo, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35675",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 466473",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35675",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Atilano Ricardo, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413603",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "atilano ricardo · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Atilano Ricardo, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35675",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413603",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36721",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balete · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "otherProject": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36721",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35667",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530033",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batangas ii · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35667",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530033",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36495",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Calantipayan, Lopez, Quezon",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530959",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calantipayan · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Calantipayan, Lopez, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36495",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530959",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35665",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Camaya, Mariveles, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416282",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Camaya, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35665",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416282",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 474140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35204",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 474140",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 40000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 34000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414188",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35204",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414188",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 34000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-35204",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529802",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan(18.067248°,121.602502°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.067248,
        "longitude": 121.602502,
        "raw": "18.067248°,121.602502",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan(18.067248°,121.602502°)",
      "sourceLabel": "2027DPWH-Proposal-35204",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32774",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36811",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon (13.883742°, 122.255920°)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.883742,
        "longitude": 122.25592,
        "raw": "13.883742°, 122.255920",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gomez · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon (13.883742°, 122.255920°)",
      "sourceLabel": "2027DPWH-Proposal-36811",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 35942",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35653",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Luacan, Dinalupihan, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416254",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Luacan, Dinalupihan, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35653",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 416254",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35653",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Luacan, Dinalupihan, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595837",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luacan · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Luacan, Dinalupihan, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35653",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 595837",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35663",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543416",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaya · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35663",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543416",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 8000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37366",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Mandalagan, Bacolod City",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531607",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "mandalagan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Mandalagan, Bacolod City",
      "sourceLabel": "2027DPWH-Proposal-37366",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531607",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35641",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "prior_amount": 4000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543419",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nagbalayong · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35641",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543419",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38572",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 533222",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "new panay · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38572",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 533222",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38572",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602510",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "new panay · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "sourceLabel": "2027DPWH-Proposal-38572",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 602510",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35671",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Paysawan, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 565669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "paysawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "otherProject": "Construction of Multi Purpose Building, Brgy. Paysawan, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35671",
      "otherSource": "FY2024 GAA · docs/GAA-2024.xlsx · row 565669",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, San Nicolas, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482357",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Poblacion, San Nicolas, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36723",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 482357",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "prior_amount": 13000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "otherProject": "Construction/Improvement of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36723",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413688",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 13000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas City",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas City",
      "sourceLabel": "2027DPWH-Proposal-36723",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530444",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, San Nicolas, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599133",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, San Nicolas, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36723",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599133",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Quinawan, Bagac, Bataan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481708",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. Quinawan, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35638",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 481708",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Quinawan, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413606",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Quinawan, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35638",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 413606",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543417",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35638",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543417",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35643",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543410",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sabang · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "sourceLabel": "2027DPWH-Proposal-35643",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543410",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33599",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bocaue, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33599",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530053",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35582",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598417",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinagbakahan · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35582",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598417",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 7000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36559",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balete · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "otherProject": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36559",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
      "source_code": "2027DPWH-Proposal-35122",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 150000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Napaccu Pequeño, Reina Mercedes, Isabela",
      "prior_amount": 70000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480625",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Napaccu Pequeño, Reina Mercedes, Isabela",
      "sourceLabel": "2027DPWH-Proposal-35122",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 480625",
      "currentAllocationPesos": 150000000,
      "otherAllocationPesos": 70000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35855",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Southwest Poblacion, Nampicuan, Nueva Ecija, 15.730992, 120.633310",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33833",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.730992,
        "longitude": 120.63331,
        "raw": "15.730992, 120.633310",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi Purpose Building, Barangay Southwest Poblacion, Nampicuan, Nueva Ecija, 15.730992, 120.633310",
      "sourceLabel": "2027DPWH-Proposal-35855",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33833",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 6000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36380",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Buenavista II, General Trias City, Cavite",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417252",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Buenavista II, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36380",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 417252",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 1500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-34992",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cattagaman Viejo, Tuguegarao City, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597890",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cattagaman Viejo, Tuguegarao City, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34992",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597890",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37480",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone II, Cadiz City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418928",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone II, Cadiz City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37480",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 418928",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "source_code": "2027DPWH-Proposal-22782",
      "office": "Metro Manila 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Welcome Village Barangay San Antonio, Para±aque City",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543906",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.46667,
        "longitude": 121.022711,
        "raw": "14.466670, 121.022711",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "otherProject": "Construction of Multi-Purpose Building at Welcome Village Barangay San Antonio, Para±aque City",
      "sourceLabel": "2027DPWH-Proposal-22782",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 543906",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37570",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Esttefania, Bacolod, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531619",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building in Brgy. Esttefania, Bacolod, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37570",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531619",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37477",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caduhaan, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531881",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Caduhaan, Cadiz City, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37477",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 531881",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pasong Camachile I, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545499",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Pasong Camachile I, General Trias City, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36379",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545499",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37465",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion I, Sagay City, Negros Occidental (10.889210, 123.416781)",
      "prior_amount": 2200000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37820",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.88921,
        "longitude": 123.416781,
        "raw": "10.889210, 123.416781",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion I, Sagay City, Negros Occidental (10.889210, 123.416781)",
      "sourceLabel": "2027DPWH-Proposal-37465",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 37820",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2200000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37403",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Tomontong, EB Magalona, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525699",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "otherProject": "Construction of Multi-purpose Building, Brgy. Tomontong, EB Magalona, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37403",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525699",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "source_code": "2027DPWH-Proposal-35613",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan, Phase 8, 14.674898, 120.529098",
      "prior_amount": 100000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24420",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 8 only",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.674898,
        "longitude": 120.529098,
        "raw": "14.674898, 120.529098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.674898,
        "longitude": 120.529098,
        "raw": "14.674898, 120.529098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "otherProject": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan, Phase 8, 14.674898, 120.529098",
      "sourceLabel": "2027DPWH-Proposal-35613",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 24420",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 100000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
      "source_code": "2027DPWH-Proposal-37023",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "sourceLabel": "2027DPWH-Proposal-37023",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36042",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy.Bakal II, Talavera, Nueva Ecija",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598547",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Brgy.Bakal II, Talavera, Nueva Ecija",
      "sourceLabel": "2027DPWH-Proposal-36042",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598547",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 4000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
      "source_code": "2027DPWH-Proposal-37621",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5300000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Canasagan, San Juan, Siquijor",
      "prior_amount": 500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420005",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Zaldy Villa"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Canasagan, San Juan, Siquijor",
      "sourceLabel": "2027DPWH-Proposal-37621",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 420005",
      "currentAllocationPesos": 5300000,
      "otherAllocationPesos": 500000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34872",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mu±oz West, Roxas, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414867",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mu±oz West, Roxas, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34872",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414867",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Peñbatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33636",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.927881,
        "longitude": 120.841578,
        "raw": "14.927881, 120.841578",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Peñbatan, Pulilan, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "sourceLabel": "2027DPWH-Proposal-33636",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "currentAllocationPesos": 35000000,
      "otherAllocationPesos": 50000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
      "source_code": "2027DPWH-Proposal-34887",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Jose Norte II, Mallig, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597919",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
      "otherProject": "Construction of Multi-purpose Building, Brgy. San Jose Norte II, Mallig, Isabela",
      "sourceLabel": "2027DPWH-Proposal-34887",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 597919",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "source_code": "2027DPWH-Proposal-34991",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Sisim, Pe±ablanca, Cagayan",
      "prior_amount": 600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415896",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Sisim, Pe±ablanca, Cagayan",
      "sourceLabel": "2027DPWH-Proposal-34991",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 415896",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 600000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38948",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484940",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-38948",
      "otherSource": "FY2020 GAA · gaa_2020_batch_0005.json · row 484940",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38948",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "prior_amount": 16600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414699",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "otherProject": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "sourceLabel": "2027DPWH-Proposal-38948",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414699",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 16600000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36423",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 296500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Museo de Bacoor, Phase 5), Barangay Poblacion (Formerly Tabing Dagat, Camposanto and Daang Bukid), Bacoor City, Cavite (14.459233°, 120.939805°)",
      "prior_amount": 92669000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30392",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 5 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.459233,
        "longitude": 120.939805,
        "raw": "14.459233°, 120.939805",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bacoor · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
      "otherProject": "Construction of Multi-Purpose Building (Museo de Bacoor, Phase 5), Barangay Poblacion (Formerly Tabing Dagat, Camposanto and Daang Bukid), Bacoor City, Cavite (14.459233°, 120.939805°)",
      "sourceLabel": "2027DPWH-Proposal-36423",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 30392",
      "currentAllocationPesos": 296500000,
      "otherAllocationPesos": 92669000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36346",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maligay, General Nakar, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525531",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maligay, General Nakar, Quezon",
      "sourceLabel": "2027DPWH-Proposal-36346",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 525531",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35588",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Pe±abatan, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544875",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building at Barangay Pe±abatan, Pulilan, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35588",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544875",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "source_code": "2027DPWH-Proposal-09638",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building Including Facilities, Land Transportation Regional Office - Region 4A, Lipa City, Batangas",
      "prior_amount": 150000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529093",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 13.959513,
        "longitude": 121.173809,
        "raw": "13.959513, 121.173809",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "otherProject": "Construction of Multi-Purpose Building Including Facilities, Land Transportation Regional Office - Region 4A, Lipa City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-09638",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 529093",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 150000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guintigiban, Corcuera, Romblon",
      "source_code": "2027DPWH-Proposal-06359",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Guintigiban, Corcuera, Romblon",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "sourceLabel": "2027DPWH-Proposal-06359",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37447",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay II-A, Manapla, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546731",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay II-A, Manapla, Negros Occidental",
      "sourceLabel": "2027DPWH-Proposal-37447",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 546731",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
      "source_code": "2027DPWH-Proposal-35072",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mala Este, Buguey, Cagayan (18.280440°, 121.857185°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32741",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.28044,
        "longitude": 121.857185,
        "raw": "18.280440°, 121.857185",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mala Este, Buguey, Cagayan (18.280440°, 121.857185°)",
      "sourceLabel": "2027DPWH-Proposal-35072",
      "otherSource": "FY2026 DPWH GAA Details Enrolled Copy, row 32741",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
      "source_code": "2027DPWH-Proposal-36172",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Muzon II, Rosario, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545494",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jolo Revilla"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
      "otherProject": "Construction of Multi-Purpose Building in Barangay Muzon II, Rosario, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36172",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 545494",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-35894",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi Purpose Building at Barangay Prenza II, Marilao, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598500",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
      "otherProject": "Construction of Multi Purpose Building at Barangay Prenza II, Marilao, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-35894",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 598500",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 20000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
      "source_code": "2027DPWH-Proposal-36449",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sapa II, Rosario, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530669",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jolo Revilla"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sapa II, Rosario, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36449",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530669",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39347",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Calabangga, Camarines Sur",
      "prior_amount": 4980000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414567",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
      "otherProject": "Construction/Rehabilitation of Multi-Purpose Building, Calabangga, Camarines Sur",
      "sourceLabel": "2027DPWH-Proposal-39347",
      "otherSource": "FY2021 GAA · docs/2021-GAA.xlsx · row 414567",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 4980000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
      "source_code": "2027DPWH-Proposal-36588",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Santo Tomas City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599118",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Santo Tomas City, Batangas",
      "sourceLabel": "2027DPWH-Proposal-36588",
      "otherSource": "FY2025 GAA · docs/GAA-2025.xlsx · row 599118",
      "currentAllocationPesos": 7000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33605",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530057",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33605",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530057",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33605",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) Of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544838",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "otherProject": "Construction (Completion) Of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "sourceLabel": "2027DPWH-Proposal-33605",
      "otherSource": "FY2023 GAA · docs/GAA-2023.xlsx · row 544838",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
      "source_code": "2027DPWH-Proposal-36456",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose I, Noveleta, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530650",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "pairType": "NEP vs historical GAA",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose I, Noveleta, Cavite",
      "sourceLabel": "2027DPWH-Proposal-36456",
      "otherSource": "FY2022 GAA · docs/GAA-2022.xlsx · row 530650",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 3000000
    }
  ],
  "current": [
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of 2 Units Multi-purpose Building, Barangay Sevilla, City of San Fernando, La Union (16.5964, 120.321499)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Sevilla, San Fernando City, La Union (16.60564, 120.322427)",
      "sourceLabel": "HB10858-3-0632-010286 · p. 632",
      "otherSource": "HB10858-3-0677-011106 · p. 677",
      "currentAllocationPesos": 85000000,
      "otherAllocationPesos": 20000000,
      "municipality": "san fernando",
      "province": "la union",
      "municipalityGroup": "san fernando · la union",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1032.2,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 16.5964,
        "longitude": 120.321499,
        "raw": "16.5964, 120.321499",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.60564,
        "longitude": 120.322427,
        "raw": "16.60564, 120.322427",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sevilla · san fernando · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Rosales Multi-Purpose Building, Barangay Tomana West, Rosales, Pangasinan, 15.72833333, 120.6166667",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tomana West, Rosales, Pangasinan (15.891401, 120.610699)",
      "sourceLabel": "HB10858-3-0632-010282 · p. 632",
      "otherSource": "HB10858-3-0686-011284 · p. 686",
      "currentAllocationPesos": 300000000,
      "otherAllocationPesos": 2500000,
      "municipality": "rosales",
      "province": "pangasinan",
      "municipalityGroup": "rosales · pangasinan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 18143.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 15.72833333,
        "longitude": 120.6166667,
        "raw": "15.72833333, 120.6166667",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 15.891401,
        "longitude": 120.610699,
        "raw": "15.891401, 120.610699",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tomana west · rosales · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Facility, Barangay San Miguel, Jordan, Guimaras, 10.59796, 122.590175",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Miguel, Jordan, Guimaras, 10.604930, 122.587092",
      "sourceLabel": "HB10858-3-0645-010496 · p. 645",
      "otherSource": "HB10858-3-0816-013916 · p. 816",
      "currentAllocationPesos": 150000000,
      "otherAllocationPesos": 20000000,
      "municipality": "jordan",
      "province": "guimaras",
      "municipalityGroup": "jordan · guimaras",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 845.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 10.59796,
        "longitude": 122.590175,
        "raw": "10.59796, 122.590175",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.60493,
        "longitude": 122.587092,
        "raw": "10.604930, 122.587092",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · jordan · guimaras",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay Centro, Mandaue City, Cebu (10.32355556,123.9427611)",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Centro, Mandaue City, Cebu (10.324020, 123.941864)",
      "sourceLabel": "HB10858-3-0646-010516 · p. 646",
      "otherSource": "HB10858-3-0852-014626 · p. 852",
      "currentAllocationPesos": 115000000,
      "otherAllocationPesos": 15000000,
      "municipality": "mandaue",
      "province": "cebu",
      "municipalityGroup": "mandaue · cebu",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 110.9,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 10.32355556,
        "longitude": 123.9427611,
        "raw": "10.32355556,123.9427611",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.32402,
        "longitude": 123.941864,
        "raw": "10.324020, 123.941864",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro · mandaue · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Nicolas, Castillejos, Zambales (14.916039 ,120.199434)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Nicolas, Castillejos, Zambales (14.914680 ,120.201633)",
      "sourceLabel": "HB10858-3-0636-010360 · p. 636",
      "otherSource": "HB10858-3-0749-012581 · p. 749",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 50000000,
      "municipality": "castillejos",
      "province": "zambales",
      "municipalityGroup": "castillejos · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 280.5,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.916039,
        "longitude": 120.199434,
        "raw": "14.916039 ,120.199434",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.91468,
        "longitude": 120.201633,
        "raw": "14.914680 ,120.201633",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san nicolas · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Juan, Castillejos, Zambales (14.933128 ,120.200506)",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Juan, Castillejos, Zambales (14.9322, 120.1999)",
      "sourceLabel": "HB10858-3-0636-010361 · p. 636",
      "otherSource": "HB10858-3-0636-010362 · p. 636",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 100000000,
      "municipality": "castillejos",
      "province": "zambales",
      "municipalityGroup": "castillejos · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 122.0,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.933128,
        "longitude": 120.200506,
        "raw": "14.933128 ,120.200506",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.9322,
        "longitude": 120.1999,
        "raw": "14.9322, 120.1999",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Agustin, Castillejos, Zambales (14.933202 ,120.196721)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Agustin, Castillejos, Zambales (14.933857 ,120.197857)",
      "sourceLabel": "HB10858-3-0636-010363 · p. 636",
      "otherSource": "HB10858-3-0749-012580 · p. 749",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 50000000,
      "municipality": "castillejos",
      "province": "zambales",
      "municipalityGroup": "castillejos · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 142.1,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.933202,
        "longitude": 120.196721,
        "raw": "14.933202 ,120.196721",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.933857,
        "longitude": 120.197857,
        "raw": "14.933857 ,120.197857",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building Including Facilities, Barangay Manglicmot, San Felipe, Zambales, 15.05583333, 120.0702778",
      "otherProject": "Rehabilitation of Multi-Purpose Facility, Barangay Manglicmot, San Felipe, Zambales, 15.039722, 120.074167",
      "sourceLabel": "HB10858-3-0636-010367 · p. 636",
      "otherSource": "HB10858-3-0747-012526 · p. 747",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 10000000,
      "municipality": "san felipe",
      "province": "zambales",
      "municipalityGroup": "san felipe · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1839.5,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 15.05583333,
        "longitude": 120.0702778,
        "raw": "15.05583333, 120.0702778",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 15.039722,
        "longitude": 120.074167,
        "raw": "15.039722, 120.074167",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "manglicmot · san felipe · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna, 14.20676528, 121.1624653",
      "otherProject": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna, 14.209031, 121.162689",
      "sourceLabel": "HB10858-3-0641-010419 · p. 641",
      "otherSource": "HB10858-3-0772-013037 · p. 772",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 12000000,
      "municipality": "calamba",
      "province": "laguna",
      "municipalityGroup": "calamba · laguna",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 253.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.20676528,
        "longitude": 121.1624653,
        "raw": "14.20676528, 121.1624653",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.209031,
        "longitude": 121.162689,
        "raw": "14.209031, 121.162689",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "3 · calamba · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "otherProject": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "sourceLabel": "HB10858-3-0642-010438 · p. 642",
      "otherSource": "HB10858-3-0641-010430 · p. 641",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 50000000,
      "municipality": "lipa",
      "province": "batangas",
      "municipalityGroup": "lipa · batangas",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 315.6,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 13.962243,
        "longitude": 121.173008,
        "raw": "13.962243, 121.173008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 13.959513,
        "longitude": 121.173809,
        "raw": "13.959513, 121.173809",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "marawoy · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Purok 4, Barangay Poblacion, Monkayo, Davao de Oro, 7.822232, 126.053510",
      "otherProject": "Construction of Multi-Purpose Building at Monkayo National High School, Barangay Poblacion, Monkayo, Davao de Oro (7.825226, 126.053775)",
      "sourceLabel": "HB10858-3-0652-010639 · p. 652",
      "otherSource": "HB10858-3-0890-015347 · p. 890",
      "currentAllocationPesos": 100000000,
      "otherAllocationPesos": 9000000,
      "municipality": "monkayo",
      "province": "davao de oro",
      "municipalityGroup": "monkayo · davao de oro",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 334.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 7.822232,
        "longitude": 126.05351,
        "raw": "7.822232, 126.053510",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 7.825226,
        "longitude": 126.053775,
        "raw": "7.825226, 126.053775",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · monkayo · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467°",
      "sourceLabel": "HB10858-3-0635-010341 · p. 635",
      "otherSource": "HB10858-3-0635-010342 · p. 635",
      "currentAllocationPesos": 90000000,
      "otherAllocationPesos": 60000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 537.7,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.4511,
        "longitude": 121.96852,
        "raw": "20.45110°, 121.96852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45432,
        "longitude": 121.96467,
        "raw": "20.45432°,121.96467",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429°",
      "sourceLabel": "HB10858-3-0635-010341 · p. 635",
      "otherSource": "HB10858-3-0699-011544 · p. 699",
      "currentAllocationPesos": 90000000,
      "otherAllocationPesos": 15000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 496.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.4511,
        "longitude": 121.96852,
        "raw": "20.45110°, 121.96852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45315,
        "longitude": 121.96429,
        "raw": "20.45315°, 121.96429",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852°",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45096°,121.96726°",
      "sourceLabel": "HB10858-3-0635-010341 · p. 635",
      "otherSource": "HB10858-3-0699-011546 · p. 699",
      "currentAllocationPesos": 90000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 132.2,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 20.4511,
        "longitude": 121.96852,
        "raw": "20.45110°, 121.96852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45096,
        "longitude": 121.96726,
        "raw": "20.45096°,121.96726",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492°",
      "sourceLabel": "HB10858-3-0635-010341 · p. 635",
      "otherSource": "HB10858-3-0699-011547 · p. 699",
      "currentAllocationPesos": 90000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 379.7,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.4511,
        "longitude": 121.96852,
        "raw": "20.45110°, 121.96852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45163,
        "longitude": 121.96492,
        "raw": "20.45163°,121.96492",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832°",
      "sourceLabel": "HB10858-3-0635-010341 · p. 635",
      "otherSource": "HB10858-3-0698-011536 · p. 698",
      "currentAllocationPesos": 90000000,
      "otherAllocationPesos": 5000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 96.8,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 20.4511,
        "longitude": 121.96852,
        "raw": "20.45110°, 121.96852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45195,
        "longitude": 121.96832,
        "raw": "20.45195°, 121.96832",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429°",
      "sourceLabel": "HB10858-3-0635-010342 · p. 635",
      "otherSource": "HB10858-3-0699-011544 · p. 699",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 15000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 136.0,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 20.45432,
        "longitude": 121.96467,
        "raw": "20.45432°,121.96467",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45315,
        "longitude": 121.96429,
        "raw": "20.45315°, 121.96429",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467°",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45096°,121.96726°",
      "sourceLabel": "HB10858-3-0635-010342 · p. 635",
      "otherSource": "HB10858-3-0699-011546 · p. 699",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 460.9,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45432,
        "longitude": 121.96467,
        "raw": "20.45432°,121.96467",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45096,
        "longitude": 121.96726,
        "raw": "20.45096°,121.96726",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492°",
      "sourceLabel": "HB10858-3-0635-010342 · p. 635",
      "otherSource": "HB10858-3-0699-011547 · p. 699",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 300.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45432,
        "longitude": 121.96467,
        "raw": "20.45432°,121.96467",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45163,
        "longitude": 121.96492,
        "raw": "20.45163°,121.96492",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832°",
      "sourceLabel": "HB10858-3-0635-010342 · p. 635",
      "otherSource": "HB10858-3-0698-011536 · p. 698",
      "currentAllocationPesos": 60000000,
      "otherAllocationPesos": 5000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 462.7,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45432,
        "longitude": 121.96467,
        "raw": "20.45432°,121.96467",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45195,
        "longitude": 121.96832,
        "raw": "20.45195°, 121.96832",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429°",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45096°,121.96726°",
      "sourceLabel": "HB10858-3-0699-011544 · p. 699",
      "otherSource": "HB10858-3-0699-011546 · p. 699",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 393.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45315,
        "longitude": 121.96429,
        "raw": "20.45315°, 121.96429",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45096,
        "longitude": 121.96726,
        "raw": "20.45096°,121.96726",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492°",
      "sourceLabel": "HB10858-3-0699-011544 · p. 699",
      "otherSource": "HB10858-3-0699-011547 · p. 699",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 181.3,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 20.45315,
        "longitude": 121.96429,
        "raw": "20.45315°, 121.96429",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45163,
        "longitude": 121.96492,
        "raw": "20.45163°,121.96492",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832°",
      "sourceLabel": "HB10858-3-0699-011544 · p. 699",
      "otherSource": "HB10858-3-0698-011536 · p. 698",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 5000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 440.6,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45315,
        "longitude": 121.96429,
        "raw": "20.45315°, 121.96429",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45195,
        "longitude": 121.96832,
        "raw": "20.45195°, 121.96832",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45096°,121.96726°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492°",
      "sourceLabel": "HB10858-3-0699-011546 · p. 699",
      "otherSource": "HB10858-3-0699-011547 · p. 699",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 10000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 254.9,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45096,
        "longitude": 121.96726,
        "raw": "20.45096°,121.96726",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45163,
        "longitude": 121.96492,
        "raw": "20.45163°,121.96492",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45096°,121.96726°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832°",
      "sourceLabel": "HB10858-3-0699-011546 · p. 699",
      "otherSource": "HB10858-3-0698-011536 · p. 698",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 155.9,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 20.45096,
        "longitude": 121.96726,
        "raw": "20.45096°,121.96726",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45195,
        "longitude": 121.96832,
        "raw": "20.45195°, 121.96832",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492°",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832°",
      "sourceLabel": "HB10858-3-0699-011547 · p. 699",
      "otherSource": "HB10858-3-0698-011536 · p. 698",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000,
      "municipality": "basco",
      "province": "batanes",
      "municipalityGroup": "basco · batanes",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 356.0,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 20.45163,
        "longitude": 121.96492,
        "raw": "20.45163°,121.96492",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 20.45195,
        "longitude": 121.96832,
        "raw": "20.45195°, 121.96832",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building Barangay Wawandue, Subic, Zambales (14.8773265, 120.2317407)",
      "otherProject": "Rehabilitation of Multi-Purpose Building Department of Agriculture Barangay Wawandue, Subic, Zambales (14.87764353561282, 120.23058423587717)",
      "sourceLabel": "HB10858-3-0638-010400 · p. 638",
      "otherSource": "HB10858-3-0750-012592 · p. 750",
      "currentAllocationPesos": 80000000,
      "otherAllocationPesos": 16764000,
      "municipality": "subic",
      "province": "zambales",
      "municipalityGroup": "subic · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 129.2,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.8773265,
        "longitude": 120.2317407,
        "raw": "14.8773265, 120.2317407",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.87764353561282,
        "longitude": 120.23058423587717,
        "raw": "14.87764353561282, 120.23058423587717",
        "orientation": "latitude, longitude",
        "decimalPlaces": 14,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "wawandue · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Dinarayat, Talavera, Nueva Ecija, 15.556002, 120.928936",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Dinarayat, Talavera, Nueva Ecija, 15.556581, 120.924814",
      "sourceLabel": "HB10858-3-0636-010373 · p. 636",
      "otherSource": "HB10858-3-0737-012321 · p. 737",
      "currentAllocationPesos": 75000000,
      "otherAllocationPesos": 3500000,
      "municipality": "talavera",
      "province": "nueva ecija",
      "municipalityGroup": "talavera · nueva ecija",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 446.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 15.556002,
        "longitude": 120.928936,
        "raw": "15.556002, 120.928936",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 15.556581,
        "longitude": 120.924814,
        "raw": "15.556581, 120.924814",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dinarayat · talavera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-purpose Building at Tierra Verde II, Barangay Pasong Tamo, Quezon City, 14.67592,121.05331",
      "otherProject": "Construction of Multi-purpose Building at Marcel, Barangay Pasong Tamo, Quezon City, 14.68136,121.0481803",
      "sourceLabel": "HB10858-3-0631-010271 · p. 631",
      "otherSource": "HB10858-3-0631-010270 · p. 631",
      "currentAllocationPesos": 74800000,
      "otherAllocationPesos": 74500000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 818.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.67592,
        "longitude": 121.05331,
        "raw": "14.67592,121.05331",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.68136,
        "longitude": 121.0481803,
        "raw": "14.68136,121.0481803",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "pasong tamo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-purpose Building at Tierra Verde II, Barangay Pasong Tamo, Quezon City, 14.67592,121.05331",
      "otherProject": "Construction of Multi-Purpose Building (Disaster Operations Center) Mapayapa, Barangay Pasong Tamo, Quezon City, 14.68777,121.06779",
      "sourceLabel": "HB10858-3-0631-010271 · p. 631",
      "otherSource": "HB10858-3-0661-010809 · p. 661",
      "currentAllocationPesos": 74800000,
      "otherAllocationPesos": 20000000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 2040.1,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.67592,
        "longitude": 121.05331,
        "raw": "14.67592,121.05331",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.68777,
        "longitude": 121.06779,
        "raw": "14.68777,121.06779",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "pasong tamo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-purpose Building at Marcel, Barangay Pasong Tamo, Quezon City, 14.68136,121.0481803",
      "otherProject": "Construction of Multi-Purpose Building (Disaster Operations Center) Mapayapa, Barangay Pasong Tamo, Quezon City, 14.68777,121.06779",
      "sourceLabel": "HB10858-3-0631-010270 · p. 631",
      "otherSource": "HB10858-3-0661-010809 · p. 661",
      "currentAllocationPesos": 74500000,
      "otherAllocationPesos": 20000000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 2226.5,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.68136,
        "longitude": 121.0481803,
        "raw": "14.68136,121.0481803",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.68777,
        "longitude": 121.06779,
        "raw": "14.68777,121.06779",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "pasong tamo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Completion of Multi-Purpose Building at Valley 5, Barangay San Antonio, Parañaque City, 14.472186, 121.027337",
      "otherProject": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "sourceLabel": "HB10858-3-0630-010250 · p. 630",
      "otherSource": "HB10858-3-0658-010749 · p. 658",
      "currentAllocationPesos": 73800000,
      "otherAllocationPesos": 7000000,
      "municipality": "paranaque city",
      "province": "",
      "municipalityGroup": "paranaque city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 790.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.472186,
        "longitude": 121.027337,
        "raw": "14.472186, 121.027337",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.46667,
        "longitude": 121.022711,
        "raw": "14.466670, 121.022711",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "san antonio · paranaque city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Disaster Operations Center) Del Nacia IV, Barangay Sauyo, Quezon City, 14.69012,121.04341",
      "otherProject": "Construction of Multi-Purpose Building (Completion) Health Facility at Barangay Sauyo, Quezon City, 14.687811, 121.037774",
      "sourceLabel": "HB10858-3-0631-010263 · p. 631",
      "otherSource": "HB10858-3-0661-010810 · p. 661",
      "currentAllocationPesos": 71000000,
      "otherAllocationPesos": 25000000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 658.3,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.69012,
        "longitude": 121.04341,
        "raw": "14.69012,121.04341",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.687811,
        "longitude": 121.037774,
        "raw": "14.687811, 121.037774",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sauyo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Disaster Operations Center) Del Nacia IV, Barangay Sauyo, Quezon City, 14.69012,121.04341",
      "otherProject": "Construction of Multi-purpose Building (SK Building) at Barangay Sauyo, Quezon City, 14.68967,121.03342",
      "sourceLabel": "HB10858-3-0631-010263 · p. 631",
      "otherSource": "HB10858-3-0661-010813 · p. 661",
      "currentAllocationPesos": 71000000,
      "otherAllocationPesos": 20700000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 1075.7,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.69012,
        "longitude": 121.04341,
        "raw": "14.69012,121.04341",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.68967,
        "longitude": 121.03342,
        "raw": "14.68967,121.03342",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sauyo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Completion) Health Facility at Barangay Sauyo, Quezon City, 14.687811, 121.037774",
      "otherProject": "Construction of Multi-purpose Building (SK Building) at Barangay Sauyo, Quezon City, 14.68967,121.03342",
      "sourceLabel": "HB10858-3-0661-010810 · p. 661",
      "otherSource": "HB10858-3-0661-010813 · p. 661",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 20700000,
      "municipality": "quezon city",
      "province": "",
      "municipalityGroup": "quezon city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 511.9,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.687811,
        "longitude": 121.037774,
        "raw": "14.687811, 121.037774",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.68967,
        "longitude": 121.03342,
        "raw": "14.68967,121.03342",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sauyo · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-purpose building, Sports Complex site, Barangay Malasin, Dupax del Norte, Nueva Vizcaya, 16.307661, 121.100507",
      "otherProject": "Construction of Multi-purpose building, MLGU site, Barangay Malasin, Dupax del Norte, Nueva Vizcaya, 16.306908, 121.102027",
      "sourceLabel": "HB10858-3-0719-011964 · p. 719",
      "otherSource": "HB10858-3-0719-011963 · p. 719",
      "currentAllocationPesos": 70000000,
      "otherAllocationPesos": 60000000,
      "municipality": "dupax del norte",
      "province": "nueva vizcaya",
      "municipalityGroup": "dupax del norte · nueva vizcaya",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 182.6,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 16.307661,
        "longitude": 121.100507,
        "raw": "16.307661, 121.100507",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.306908,
        "longitude": 121.102027,
        "raw": "16.306908, 121.102027",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malasin · dupax del norte · nueva vizcaya",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Facility, Barangay Tuyo, Balanga City, Bataan (14.687125 , 120.5304472)",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Tuyo, City of Balanga, Bataan (14.686264, 120.528526)",
      "sourceLabel": "HB10858-3-0726-012104 · p. 726",
      "otherSource": "HB10858-3-0727-012114 · p. 727",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 9000000,
      "municipality": "balanga",
      "province": "bataan",
      "municipalityGroup": "balanga · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 227.7,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.687125,
        "longitude": 120.5304472,
        "raw": "14.687125 , 120.5304472",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.686264,
        "longitude": 120.528526,
        "raw": "14.686264, 120.528526",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tuyo · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Continuation), Barangay Lupi, San Fernando, Camarines Sur , 13.527453, 123.145008",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Lupi Elementary School (School I.D: 113003), Barangay Lupi, San Fernando, Camarines Sur ( 13.536652°, 123.148719°)",
      "sourceLabel": "HB10858-3-0798-013574 · p. 798",
      "otherSource": "HB10858-3-0799-013583 · p. 799",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 10000000,
      "municipality": "san fernando",
      "province": "camarines sur",
      "municipalityGroup": "san fernando · camarines sur",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1098.7,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 13.527453,
        "longitude": 123.145008,
        "raw": "13.527453, 123.145008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 13.536652,
        "longitude": 123.148719,
        "raw": "13.536652°, 123.148719",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lupi · san fernando · camarines sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Facility, Barangay Mclain, Buenavista, Guimaras, 10.696612, 122.661143",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Mclain, Buenavista, Guimaras, 10.698607, 122.659402",
      "sourceLabel": "HB10858-3-0817-013918 · p. 817",
      "otherSource": "HB10858-3-0816-013915 · p. 816",
      "currentAllocationPesos": 50000000,
      "otherAllocationPesos": 20000000,
      "municipality": "buenavista",
      "province": "guimaras",
      "municipalityGroup": "buenavista · guimaras",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 292.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 10.696612,
        "longitude": 122.661143,
        "raw": "10.696612, 122.661143",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.698607,
        "longitude": 122.659402,
        "raw": "10.698607, 122.659402",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mclain · buenavista · guimaras",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, City of Balanga, Bataan (14.678292, 120.519241)",
      "otherProject": "Construction (Completion) of Multi-Purpose Facility, Barangay Bagong Silang, City of Balanga, Bataan, (14.678126, 120.519999)",
      "sourceLabel": "HB10858-3-0726-012112 · p. 726",
      "otherSource": "HB10858-3-0726-012106 · p. 726",
      "currentAllocationPesos": 45000000,
      "otherAllocationPesos": 20000000,
      "municipality": "balanga",
      "province": "bataan",
      "municipalityGroup": "balanga · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 83.6,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 14.678292,
        "longitude": 120.519241,
        "raw": "14.678292, 120.519241",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.678126,
        "longitude": 120.519999,
        "raw": "14.678126, 120.519999",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagong silang · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Facility, Barangay Saint Francis II, Limay, Bataan. (14.574760, 120.587956)",
      "otherProject": "Construction of Multi-Purpose Facility, Barangay Saint Francis II, Limay, Bataan (14.574849, 120.588320)",
      "sourceLabel": "HB10858-3-0726-012103 · p. 726",
      "otherSource": "HB10858-3-0727-012125 · p. 727",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 30000000,
      "municipality": "limay",
      "province": "bataan",
      "municipalityGroup": "limay · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 40.4,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.57476,
        "longitude": 120.587956,
        "raw": "14.574760, 120.587956",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.574849,
        "longitude": 120.58832,
        "raw": "14.574849, 120.588320",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saint francis ii · limay · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "sourceLabel": "HB10858-3-0727-012124 · p. 727",
      "otherSource": "HB10858-3-0727-012123 · p. 727",
      "currentAllocationPesos": 40000000,
      "otherAllocationPesos": 25000000,
      "municipality": "balanga",
      "province": "bataan",
      "municipalityGroup": "balanga · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 747.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.674898,
        "longitude": 120.529098,
        "raw": "14.674898, 120.529098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.671365,
        "longitude": 120.535013,
        "raw": "14.671365, 120.535013",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building at Pasolo 3S Center, Barangay Pasolo, Valenzuela City, 14.706160, 120.952819",
      "otherProject": "Construction of Multi-Purppose Building (Covered Court), Along Pasolo Road, Barangay Pasolo, Valenzuela City, 14.709236, 120.952865",
      "sourceLabel": "HB10858-3-0659-010773 · p. 659",
      "otherSource": "HB10858-3-0658-010752 · p. 658",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 25000000,
      "municipality": "valenzuela city",
      "province": "",
      "municipalityGroup": "valenzuela city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 342.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.70616,
        "longitude": 120.952819,
        "raw": "14.706160, 120.952819",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.709236,
        "longitude": 120.952865,
        "raw": "14.709236, 120.952865",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "pasolo · valenzuela city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Completion of Multi-Purpose Building, Barangay Tenejero, Balanga City, Bataan, (14.676933, 120.530969)",
      "otherProject": "Construction of Multi-Purpose Building (Command Center), Barangay Tenejero, Balanga City, Bataan, (14.687025, 120.530377)",
      "sourceLabel": "HB10858-3-0726-012102 · p. 726",
      "otherSource": "HB10858-3-0727-012122 · p. 727",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 15000000,
      "municipality": "balanga",
      "province": "bataan",
      "municipalityGroup": "balanga · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1124.0,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.676933,
        "longitude": 120.530969,
        "raw": "14.676933, 120.530969",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.687025,
        "longitude": 120.530377,
        "raw": "14.687025, 120.530377",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tenejero · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "otherProject": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "sourceLabel": "HB10858-3-0749-012568 · p. 749",
      "otherSource": "HB10858-3-0749-012579 · p. 749",
      "currentAllocationPesos": 30000000,
      "otherAllocationPesos": 10000000,
      "municipality": "castillejos",
      "province": "zambales",
      "municipalityGroup": "castillejos · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 23.9,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.943376,
        "longitude": 120.190068,
        "raw": "14.943376, 120.190068",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.943196,
        "longitude": 120.189947,
        "raw": "14.943196, 120.189947",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "magsaysay · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay Porac, Botolan, Zambales, 15.246089, 120.020858",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Porac, Botolan, Zambales, (15.2433, 120.0245)",
      "sourceLabel": "HB10858-3-0746-012523 · p. 746",
      "otherSource": "HB10858-3-0746-012514 · p. 746",
      "currentAllocationPesos": 26000000,
      "otherAllocationPesos": 12000000,
      "municipality": "botolan",
      "province": "zambales",
      "municipalityGroup": "botolan · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 498.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 15.246089,
        "longitude": 120.020858,
        "raw": "15.246089, 120.020858",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 15.2433,
        "longitude": 120.0245,
        "raw": "15.2433, 120.0245",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "porac · botolan · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Poblacion, Banate, Iloilo, 11.0032, 122.8178",
      "otherProject": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "sourceLabel": "HB10858-3-0819-013965 · p. 819",
      "otherSource": "HB10858-3-0820-013991 · p. 820",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 10000000,
      "municipality": "banate",
      "province": "iloilo",
      "municipalityGroup": "banate · iloilo",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 465.2,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 11.0032,
        "longitude": 122.8178,
        "raw": "11.0032, 122.8178",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 11.002222,
        "longitude": 122.821944,
        "raw": "11.002222,122.821944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · banate · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Sitio Luan, Barangay Lipay, Palauig, Zambales, 15.489447, 119.906253",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Lipay, Palauig, Zambales, (15.4554, 119.9229)",
      "sourceLabel": "HB10858-3-0746-012520 · p. 746",
      "otherSource": "HB10858-3-0746-012521 · p. 746",
      "currentAllocationPesos": 25000000,
      "otherAllocationPesos": 17000000,
      "municipality": "palauig",
      "province": "zambales",
      "municipalityGroup": "palauig · zambales",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 4185.1,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 15.489447,
        "longitude": 119.906253,
        "raw": "15.489447, 119.906253",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 15.4554,
        "longitude": 119.9229,
        "raw": "15.4554, 119.9229",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lipay · palauig · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi- Purpose Building, Barangay Lopez Jaena - Rizal, Dumangas, Iloilo, 10.821752, 122.711749",
      "otherProject": "Construction (Completion) of Multi- Purpose Building (Cultural Center), Barangay Lopez Jaena - Rizal, Dumangas, Iloilo, 10.821752, 122.711749",
      "sourceLabel": "HB10858-3-0818-013964 · p. 818",
      "otherSource": "HB10858-3-0819-013978 · p. 819",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 20000000,
      "municipality": "dumangas",
      "province": "iloilo",
      "municipalityGroup": "dumangas · iloilo",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 10.821752,
        "longitude": 122.711749,
        "raw": "10.821752, 122.711749",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.821752,
        "longitude": 122.711749,
        "raw": "10.821752, 122.711749",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lopez jaena - rizal · dumangas · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Villa Angeles, Barangay Estefania, Bacolod City, 10.663840, 122.985995",
      "otherProject": "Construction of Multi-Purpose Building, East Villa, Barangay Estefania, Bacolod City, 10.669720, 122.999145",
      "sourceLabel": "HB10858-3-0830-014183 · p. 830",
      "otherSource": "HB10858-3-0830-014184 · p. 830",
      "currentAllocationPesos": 20000000,
      "otherAllocationPesos": 8000000,
      "municipality": "bacolod city",
      "province": "",
      "municipalityGroup": "bacolod city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 1578.7,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 10.66384,
        "longitude": 122.985995,
        "raw": "10.663840, 122.985995",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.66972,
        "longitude": 122.999145,
        "raw": "10.669720, 122.999145",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "estefania · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at Bliss Site, Barangay Poblacion 1, Santa Maria, Isabela, 17.474976, 121.744265",
      "otherProject": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "sourceLabel": "HB10858-3-0705-011684 · p. 705",
      "otherSource": "HB10858-3-0705-011671 · p. 705",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 10000000,
      "municipality": "santa maria",
      "province": "isabela",
      "municipalityGroup": "santa maria · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1202.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 17.474976,
        "longitude": 121.744265,
        "raw": "17.474976, 121.744265",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 17.467914,
        "longitude": 121.752852,
        "raw": "17.467914, 121.752852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion 1 · santa maria · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tacas, Pontevedra, Capiz, 11.47354, 122.83484",
      "otherProject": "Completion/Continuation of Multi-Purpose Building, Barangay Tacas, Pontevedra, Capiz, 11.47618, 122.83844",
      "sourceLabel": "HB10858-3-0815-013875 · p. 815",
      "otherSource": "HB10858-3-0815-013874 · p. 815",
      "currentAllocationPesos": 15000000,
      "otherAllocationPesos": 3000000,
      "municipality": "pontevedra",
      "province": "capiz",
      "municipalityGroup": "pontevedra · capiz",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 490.0,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 11.47354,
        "longitude": 122.83484,
        "raw": "11.47354, 122.83484",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 11.47618,
        "longitude": 122.83844,
        "raw": "11.47618, 122.83844",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tacas · pontevedra · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Don Severo Felisimo Elementary School), Barangay Sta. Lucia, Dolores, Quezon, 14.033142, 121.426042",
      "otherProject": "Construction of Multi-Purpose Building (Sta. Lucia National High School), Barangay Sta. Lucia, Dolores, Quezon, 14.032425, 121.425425",
      "sourceLabel": "HB10858-3-0781-013229 · p. 781",
      "otherSource": "HB10858-3-0781-013228 · p. 781",
      "currentAllocationPesos": 12000000,
      "otherAllocationPesos": 10000000,
      "municipality": "dolores",
      "province": "quezon",
      "municipalityGroup": "dolores · quezon",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 103.9,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.033142,
        "longitude": 121.426042,
        "raw": "14.033142, 121.426042",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.032425,
        "longitude": 121.425425,
        "raw": "14.032425, 121.425425",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. lucia · dolores · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi Purpose Building, Barangay Payao, Catbalogan City, Samar, 11.80411944, 124.8656972",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Payao, Catbalogan City, Samar, (11.80411944, 124.8656972)",
      "sourceLabel": "HB10858-3-0863-014853 · p. 863",
      "otherSource": "HB10858-3-0863-014850 · p. 863",
      "currentAllocationPesos": 11000000,
      "otherAllocationPesos": 5500000,
      "municipality": "catbalogan",
      "province": "samar",
      "municipalityGroup": "catbalogan · samar",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 11.80411944,
        "longitude": 124.8656972,
        "raw": "11.80411944, 124.8656972",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 11.80411944,
        "longitude": 124.8656972,
        "raw": "11.80411944, 124.8656972",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "payao · catbalogan · samar",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Hall at Josefaville, Barangay Panilao, Pilar, Bataan (14.674239, 120.550954)",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Panilao, Pilar, Bataan (14.668490, 120.553416)",
      "sourceLabel": "HB10858-3-0726-012108 · p. 726",
      "otherSource": "HB10858-3-0727-012117 · p. 727",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 8000000,
      "municipality": "pilar",
      "province": "bataan",
      "municipalityGroup": "pilar · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 691.9,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.674239,
        "longitude": 120.550954,
        "raw": "14.674239, 120.550954",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.66849,
        "longitude": 120.553416,
        "raw": "14.668490, 120.553416",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "panilao · pilar · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered court), Barangay Dona Francisca, Balanga City, Bataan (14.683855, 120.543237)",
      "otherProject": "Rehabilitation of the City Prosecutor's Office, Barangay Doña Francisca, Balanga City, Bataan, (14.6833, 120.5408)",
      "sourceLabel": "HB10858-3-0727-012129 · p. 727",
      "otherSource": "HB10858-3-0728-012133 · p. 728",
      "currentAllocationPesos": 10000000,
      "otherAllocationPesos": 5000000,
      "municipality": "balanga",
      "province": "bataan",
      "municipalityGroup": "balanga · bataan",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 269.3,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.683855,
        "longitude": 120.543237,
        "raw": "14.683855, 120.543237",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.6833,
        "longitude": 120.5408,
        "raw": "14.6833, 120.5408",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dona francisca · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Improvement of Multi-Purpose Building, Barangay Maranao Timber, Ditsaan-Ramain, Lanao del Sur, 8.001138333, 124.3338944",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Maranao Timber, Ditsaan-Ramain, Lanao del Sur, 8.000976111, 124.3341792",
      "sourceLabel": "HB10858-3-0648-010566 · p. 648",
      "otherSource": "HB10858-3-0648-010567 · p. 648",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 8000000,
      "municipality": "ditsaan-ramain",
      "province": "lanao del sur",
      "municipalityGroup": "ditsaan-ramain · lanao del sur",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 36.2,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 8.001138333,
        "longitude": 124.3338944,
        "raw": "8.001138333, 124.3338944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 8.000976111,
        "longitude": 124.3341792,
        "raw": "8.000976111, 124.3341792",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maranao timber · ditsaan-ramain · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Horacio Dela Costa Homes II, Barangay 179, Caloocan City, 14.748791, 121.070695",
      "otherProject": "Rehabilitation of Multi-Purpose Building with Ground Improvement, Horacio Dela Costa Homes II, Barangay 179, Caloocan City, 14.747192, 121.073797",
      "sourceLabel": "HB10858-3-0660-010783 · p. 660",
      "otherSource": "HB10858-3-0658-010755 · p. 658",
      "currentAllocationPesos": 8000000,
      "otherAllocationPesos": 7100000,
      "municipality": "caloocan city",
      "province": "",
      "municipalityGroup": "caloocan city · identity unverified",
      "municipalityEvidence": "Municipality wording only · administrative identity unverified",
      "distanceMeters": 378.0,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.748791,
        "longitude": 121.070695,
        "raw": "14.748791, 121.070695",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.747192,
        "longitude": 121.073797,
        "raw": "14.747192, 121.073797",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "179 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Country Mile Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.425004, 120.920472",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Dream Ville 5, Barangay Carsadang Bago 2, Imus, Cavite, 14.429167, 120.920556",
      "sourceLabel": "HB10858-3-0762-012847 · p. 762",
      "otherSource": "HB10858-3-0762-012848 · p. 762",
      "currentAllocationPesos": 4000000,
      "otherAllocationPesos": 3500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 463.0,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.425004,
        "longitude": 120.920472,
        "raw": "14.425004, 120.920472",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.429167,
        "longitude": 120.920556,
        "raw": "14.429167, 120.920556",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Country Mile Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.425004, 120.920472",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Grand Residences, Barangay Carsadang Bago 2, Imus, Cavite, 14.423056, 120.925833",
      "sourceLabel": "HB10858-3-0762-012847 · p. 762",
      "otherSource": "HB10858-3-0762-012845 · p. 762",
      "currentAllocationPesos": 4000000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 616.6,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.425004,
        "longitude": 120.920472,
        "raw": "14.425004, 120.920472",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.423056,
        "longitude": 120.925833,
        "raw": "14.423056, 120.925833",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Country Mile Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.425004, 120.920472",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Good Wood Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.419722, 120.923056",
      "sourceLabel": "HB10858-3-0762-012847 · p. 762",
      "otherSource": "HB10858-3-0762-012846 · p. 762",
      "currentAllocationPesos": 4000000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 649.9,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.425004,
        "longitude": 120.920472,
        "raw": "14.425004, 120.920472",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.419722,
        "longitude": 120.923056,
        "raw": "14.419722, 120.923056",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Dream Ville 5, Barangay Carsadang Bago 2, Imus, Cavite, 14.429167, 120.920556",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Grand Residences, Barangay Carsadang Bago 2, Imus, Cavite, 14.423056, 120.925833",
      "sourceLabel": "HB10858-3-0762-012848 · p. 762",
      "otherSource": "HB10858-3-0762-012845 · p. 762",
      "currentAllocationPesos": 3500000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 885.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.429167,
        "longitude": 120.920556,
        "raw": "14.429167, 120.920556",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.423056,
        "longitude": 120.925833,
        "raw": "14.423056, 120.925833",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Dream Ville 5, Barangay Carsadang Bago 2, Imus, Cavite, 14.429167, 120.920556",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Good Wood Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.419722, 120.923056",
      "sourceLabel": "HB10858-3-0762-012848 · p. 762",
      "otherSource": "HB10858-3-0762-012846 · p. 762",
      "currentAllocationPesos": 3500000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1084.2,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.429167,
        "longitude": 120.920556,
        "raw": "14.429167, 120.920556",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.419722,
        "longitude": 120.923056,
        "raw": "14.419722, 120.923056",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Grand Residences, Barangay Carsadang Bago 2, Imus, Cavite, 14.423056, 120.925833",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Good Wood Homes, Barangay Carsadang Bago 2, Imus, Cavite, 14.419722, 120.923056",
      "sourceLabel": "HB10858-3-0762-012845 · p. 762",
      "otherSource": "HB10858-3-0762-012846 · p. 762",
      "currentAllocationPesos": 2500000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 476.3,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.423056,
        "longitude": 120.925833,
        "raw": "14.423056, 120.925833",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.419722,
        "longitude": 120.923056,
        "raw": "14.419722, 120.923056",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carsadang bago 2 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Nagsaulay, San Juan, Batangas (13.711382, 121.438387)",
      "otherProject": "Rehabilitation of Multi-Purpose Building, Barangay Nagsaulay, San Juan, Batangas, 13.711764, 121.440296",
      "sourceLabel": "HB10858-3-0759-012782 · p. 759",
      "otherSource": "HB10858-3-0758-012765 · p. 758",
      "currentAllocationPesos": 6000000,
      "otherAllocationPesos": 5000000,
      "municipality": "san juan",
      "province": "batangas",
      "municipalityGroup": "san juan · batangas",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 210.6,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 13.711382,
        "longitude": 121.438387,
        "raw": "13.711382, 121.438387",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 13.711764,
        "longitude": 121.440296,
        "raw": "13.711764, 121.440296",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nagsaulay · san juan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Building 1), Barangay Buenavista, Santiago City, Isabela, 16.699728, 121.55166",
      "otherProject": "Construction (Completion) Multi-Purpose Building (Building 2), Barangay Buenavista, Santiago City, Isabela, 16.702319, 121.55137",
      "sourceLabel": "HB10858-3-0715-011889 · p. 715",
      "otherSource": "HB10858-3-0716-011899 · p. 716",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 2500000,
      "municipality": "santiago",
      "province": "isabela",
      "municipalityGroup": "santiago · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 289.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 16.699728,
        "longitude": 121.55166,
        "raw": "16.699728, 121.55166",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.702319,
        "longitude": 121.55137,
        "raw": "16.702319, 121.55137",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buenavista · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Building 2), Barangay Dumawing, Jones, Isabela, 16.914686, 121.852893",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Dumawing, Jones, Isabela, 16.563709, 121.6971671",
      "sourceLabel": "HB10858-3-0716-011893 · p. 716",
      "otherSource": "HB10858-3-0714-011868 · p. 714",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000,
      "municipality": "jones",
      "province": "isabela",
      "municipalityGroup": "jones · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 42403.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 16.914686,
        "longitude": 121.852893,
        "raw": "16.914686, 121.852893",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.563709,
        "longitude": 121.6971671,
        "raw": "16.563709, 121.6971671",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dumawing · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building (Building 2), Barangay Malannit, Jones, Isabela, 16.569398, 121.655237",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Malannit, Jones, Isabela, 16.568619, 121.655227",
      "sourceLabel": "HB10858-3-0716-011894 · p. 716",
      "otherSource": "HB10858-3-0713-011844 · p. 713",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 4000000,
      "municipality": "jones",
      "province": "isabela",
      "municipalityGroup": "jones · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 86.6,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 16.569398,
        "longitude": 121.655237,
        "raw": "16.569398, 121.655237",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.568619,
        "longitude": 121.655227,
        "raw": "16.568619, 121.655227",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malannit · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Salay, San Agustin, Isabela, 16.43506, 121.7795",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Salay, San Agustin, Isabela, 16.76614, 121.76379",
      "sourceLabel": "HB10858-3-0715-011885 · p. 715",
      "otherSource": "HB10858-3-0715-011886 · p. 715",
      "currentAllocationPesos": 3500000,
      "otherAllocationPesos": 3500000,
      "municipality": "san agustin",
      "province": "isabela",
      "municipalityGroup": "san agustin · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 36852.5,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 16.43506,
        "longitude": 121.7795,
        "raw": "16.43506, 121.7795",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.76614,
        "longitude": 121.76379,
        "raw": "16.76614, 121.76379",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salay · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Villa Hermosa, Barangay Buhay na Tubig, Imus, Cavite, 14.401948, 120.957102",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Pristina, Barangay Buhay na Tubig, Imus, Cavite, 14.412349, 120.949718",
      "sourceLabel": "HB10858-3-0763-012859 · p. 763",
      "otherSource": "HB10858-3-0763-012860 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1403.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.401948,
        "longitude": 120.957102,
        "raw": "14.401948, 120.957102",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.412349,
        "longitude": 120.949718,
        "raw": "14.412349, 120.949718",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Villa Hermosa, Barangay Buhay na Tubig, Imus, Cavite, 14.401948, 120.957102",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona Phase 4, Barangay Buhay na Tubig, Imus, Cavite, 14.410284, 120.949562",
      "sourceLabel": "HB10858-3-0763-012859 · p. 763",
      "otherSource": "HB10858-3-0763-012861 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1232.3,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.401948,
        "longitude": 120.957102,
        "raw": "14.401948, 120.957102",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.410284,
        "longitude": 120.949562,
        "raw": "14.410284, 120.949562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Villa Hermosa, Barangay Buhay na Tubig, Imus, Cavite, 14.401948, 120.957102",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona 2, Barangay Buhay na Tubig, Imus, Cavite, 14.411860, 120.948627",
      "sourceLabel": "HB10858-3-0763-012859 · p. 763",
      "otherSource": "HB10858-3-0763-012862 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1431.0,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.401948,
        "longitude": 120.957102,
        "raw": "14.401948, 120.957102",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.41186,
        "longitude": 120.948627,
        "raw": "14.411860, 120.948627",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Villa Hermosa, Barangay Buhay na Tubig, Imus, Cavite, 14.401948, 120.957102",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Covina Phase 2, Barangay Buhay na Tubig, Imus, Cavite, 14.402911, 120.962528",
      "sourceLabel": "HB10858-3-0763-012859 · p. 763",
      "otherSource": "HB10858-3-0763-012863 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 594.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.401948,
        "longitude": 120.957102,
        "raw": "14.401948, 120.957102",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.402911,
        "longitude": 120.962528,
        "raw": "14.402911, 120.962528",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Villa Hermosa, Barangay Buhay na Tubig, Imus, Cavite, 14.401948, 120.957102",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Barcelona 3, Barangay Buhay na Tubig, Imus, Cavite, 14.408865, 120.953022",
      "sourceLabel": "HB10858-3-0763-012859 · p. 763",
      "otherSource": "HB10858-3-0763-012864 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 885.8,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.401948,
        "longitude": 120.957102,
        "raw": "14.401948, 120.957102",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.408865,
        "longitude": 120.953022,
        "raw": "14.408865, 120.953022",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Pristina, Barangay Buhay na Tubig, Imus, Cavite, 14.412349, 120.949718",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona Phase 4, Barangay Buhay na Tubig, Imus, Cavite, 14.410284, 120.949562",
      "sourceLabel": "HB10858-3-0763-012860 · p. 763",
      "otherSource": "HB10858-3-0763-012861 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 230.2,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.412349,
        "longitude": 120.949718,
        "raw": "14.412349, 120.949718",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.410284,
        "longitude": 120.949562,
        "raw": "14.410284, 120.949562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Pristina, Barangay Buhay na Tubig, Imus, Cavite, 14.412349, 120.949718",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona 2, Barangay Buhay na Tubig, Imus, Cavite, 14.411860, 120.948627",
      "sourceLabel": "HB10858-3-0763-012860 · p. 763",
      "otherSource": "HB10858-3-0763-012862 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 129.5,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.412349,
        "longitude": 120.949718,
        "raw": "14.412349, 120.949718",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.41186,
        "longitude": 120.948627,
        "raw": "14.411860, 120.948627",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Pristina, Barangay Buhay na Tubig, Imus, Cavite, 14.412349, 120.949718",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Covina Phase 2, Barangay Buhay na Tubig, Imus, Cavite, 14.402911, 120.962528",
      "sourceLabel": "HB10858-3-0763-012860 · p. 763",
      "otherSource": "HB10858-3-0763-012863 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1733.4,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.412349,
        "longitude": 120.949718,
        "raw": "14.412349, 120.949718",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.402911,
        "longitude": 120.962528,
        "raw": "14.402911, 120.962528",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Pristina, Barangay Buhay na Tubig, Imus, Cavite, 14.412349, 120.949718",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Barcelona 3, Barangay Buhay na Tubig, Imus, Cavite, 14.408865, 120.953022",
      "sourceLabel": "HB10858-3-0763-012860 · p. 763",
      "otherSource": "HB10858-3-0763-012864 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 526.0,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.412349,
        "longitude": 120.949718,
        "raw": "14.412349, 120.949718",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.408865,
        "longitude": 120.953022,
        "raw": "14.408865, 120.953022",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona Phase 4, Barangay Buhay na Tubig, Imus, Cavite, 14.410284, 120.949562",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona 2, Barangay Buhay na Tubig, Imus, Cavite, 14.411860, 120.948627",
      "sourceLabel": "HB10858-3-0763-012861 · p. 763",
      "otherSource": "HB10858-3-0763-012862 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 202.1,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.410284,
        "longitude": 120.949562,
        "raw": "14.410284, 120.949562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.41186,
        "longitude": 120.948627,
        "raw": "14.411860, 120.948627",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona Phase 4, Barangay Buhay na Tubig, Imus, Cavite, 14.410284, 120.949562",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Covina Phase 2, Barangay Buhay na Tubig, Imus, Cavite, 14.402911, 120.962528",
      "sourceLabel": "HB10858-3-0763-012861 · p. 763",
      "otherSource": "HB10858-3-0763-012863 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1619.3,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.410284,
        "longitude": 120.949562,
        "raw": "14.410284, 120.949562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.402911,
        "longitude": 120.962528,
        "raw": "14.402911, 120.962528",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona Phase 4, Barangay Buhay na Tubig, Imus, Cavite, 14.410284, 120.949562",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Barcelona 3, Barangay Buhay na Tubig, Imus, Cavite, 14.408865, 120.953022",
      "sourceLabel": "HB10858-3-0763-012861 · p. 763",
      "otherSource": "HB10858-3-0763-012864 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 404.7,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.410284,
        "longitude": 120.949562,
        "raw": "14.410284, 120.949562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.408865,
        "longitude": 120.953022,
        "raw": "14.408865, 120.953022",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona 2, Barangay Buhay na Tubig, Imus, Cavite, 14.411860, 120.948627",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Covina Phase 2, Barangay Buhay na Tubig, Imus, Cavite, 14.402911, 120.962528",
      "sourceLabel": "HB10858-3-0763-012862 · p. 763",
      "otherSource": "HB10858-3-0763-012863 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1797.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.41186,
        "longitude": 120.948627,
        "raw": "14.411860, 120.948627",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.402911,
        "longitude": 120.962528,
        "raw": "14.402911, 120.962528",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Camella Barcelona 2, Barangay Buhay na Tubig, Imus, Cavite, 14.411860, 120.948627",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Barcelona 3, Barangay Buhay na Tubig, Imus, Cavite, 14.408865, 120.953022",
      "sourceLabel": "HB10858-3-0763-012862 · p. 763",
      "otherSource": "HB10858-3-0763-012864 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 578.7,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.41186,
        "longitude": 120.948627,
        "raw": "14.411860, 120.948627",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.408865,
        "longitude": 120.953022,
        "raw": "14.408865, 120.953022",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Covina Phase 2, Barangay Buhay na Tubig, Imus, Cavite, 14.402911, 120.962528",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Barcelona 3, Barangay Buhay na Tubig, Imus, Cavite, 14.408865, 120.953022",
      "sourceLabel": "HB10858-3-0763-012863 · p. 763",
      "otherSource": "HB10858-3-0763-012864 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 3000000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 1219.2,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.402911,
        "longitude": 120.962528,
        "raw": "14.402911, 120.962528",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.408865,
        "longitude": 120.953022,
        "raw": "14.408865, 120.953022",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction of Multi-Purpose Building, Barangay Capual, Omar, Sulu (6.017660, 121.389930)",
      "otherProject": "Construction of Multi-Purpose Building, Barangay Capual, Omar, Sulu, (6.035090, 121.382629)",
      "sourceLabel": "HB10858-3-0864-014860 · p. 864",
      "otherSource": "HB10858-3-0864-014861 · p. 864",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000,
      "municipality": "omar",
      "province": "sulu",
      "municipalityGroup": "omar · sulu",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 2099.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 6.01766,
        "longitude": 121.38993,
        "raw": "6.017660, 121.389930",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 6.03509,
        "longitude": 121.382629,
        "raw": "6.035090, 121.382629",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "capual · omar · sulu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Completion of Multi-Purpose Building, Purok Madasigon, Barangay Cuambog, Mabini, Davao de Oro (7.308493, 125.847461)",
      "otherProject": "Completion of Multi-Purpose Building, Purok Masrowran, Barangay Cuambog, Mabini, Davao de Oro (7.310262, 125.849721)",
      "sourceLabel": "HB10858-3-0886-015286 · p. 886",
      "otherSource": "HB10858-3-0886-015287 · p. 886",
      "currentAllocationPesos": 5000000,
      "otherAllocationPesos": 5000000,
      "municipality": "mabini",
      "province": "davao de oro",
      "municipalityGroup": "mabini · davao de oro",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 317.5,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 7.308493,
        "longitude": 125.847461,
        "raw": "7.308493, 125.847461",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 7.310262,
        "longitude": 125.849721,
        "raw": "7.310262, 125.849721",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cuambog · mabini · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Laoag, San Agustin, Isabela, 16.4418, 121.7367",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Laoag, San Agustin, Isabela, 16.4417, 121.7359",
      "sourceLabel": "HB10858-3-0715-011879 · p. 715",
      "otherSource": "HB10858-3-0715-011878 · p. 715",
      "currentAllocationPesos": 4000000,
      "otherAllocationPesos": 3500000,
      "municipality": "san agustin",
      "province": "isabela",
      "municipalityGroup": "san agustin · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 86.0,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 16.4418,
        "longitude": 121.7367,
        "raw": "16.4418, 121.7367",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.4417,
        "longitude": 121.7359,
        "raw": "16.4417, 121.7359",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laoag · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Gayong, Cordon, Isabela, 16.649532, 121.48152",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Gayong, Cordon, Isabela, 16.653409, 121.48671",
      "sourceLabel": "HB10858-3-0713-011852 · p. 713",
      "otherSource": "HB10858-3-0713-011851 · p. 713",
      "currentAllocationPesos": 3500000,
      "otherAllocationPesos": 2500000,
      "municipality": "cordon",
      "province": "isabela",
      "municipalityGroup": "cordon · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 701.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 16.649532,
        "longitude": 121.48152,
        "raw": "16.649532, 121.48152",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.653409,
        "longitude": 121.48671,
        "raw": "16.653409, 121.48671",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gayong · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Taliktik, Cordon, Isabela, 16.76735, 121.38879",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Taliktik, Cordon, Isabela, 16.766545, 121.38715",
      "sourceLabel": "HB10858-3-0714-011854 · p. 714",
      "otherSource": "HB10858-3-0714-011853 · p. 714",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "cordon",
      "province": "isabela",
      "municipalityGroup": "cordon · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 196.2,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 16.76735,
        "longitude": 121.38879,
        "raw": "16.76735, 121.38879",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.766545,
        "longitude": 121.38715,
        "raw": "16.766545, 121.38715",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taliktik · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Turod Norte, Cordon, Isabela, 16.679269, 121.46919",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Turod Norte, Cordon, Isabela, 16.679521, 121.46957",
      "sourceLabel": "HB10858-3-0714-011856 · p. 714",
      "otherSource": "HB10858-3-0714-011855 · p. 714",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "cordon",
      "province": "isabela",
      "municipalityGroup": "cordon · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 49.2,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 16.679269,
        "longitude": 121.46919,
        "raw": "16.679269, 121.46919",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.679521,
        "longitude": 121.46957,
        "raw": "16.679521, 121.46957",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "turod norte · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Ambalatungan, Santiago City, Isabela, 16.706146, 121.535177",
      "otherProject": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Ambalatungan, Santiago City, Isabela, 16.709812, 121.53185",
      "sourceLabel": "HB10858-3-0716-011908 · p. 716",
      "otherSource": "HB10858-3-0716-011898 · p. 716",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "santiago",
      "province": "isabela",
      "municipalityGroup": "santiago · isabela",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 540.1,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 16.706146,
        "longitude": 121.535177,
        "raw": "16.706146, 121.535177",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 16.709812,
        "longitude": 121.53185,
        "raw": "16.709812, 121.53185",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ambalatungan · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Westwood, Barangay Alapan 1B, Imus, Cavite, 14.415833, 120.918056",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Bloomfields, Barangay Alapan 1B, Imus, Cavite, 14.417222, 120.9175",
      "sourceLabel": "HB10858-3-0762-012842 · p. 762",
      "otherSource": "HB10858-3-0762-012843 · p. 762",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 165.7,
      "distanceBand": "100–<250 meters",
      "leftCoordinates": {
        "latitude": 14.415833,
        "longitude": 120.918056,
        "raw": "14.415833, 120.918056",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.417222,
        "longitude": 120.9175,
        "raw": "14.417222, 120.9175",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alapan 1b · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Westwood, Barangay Alapan 1B, Imus, Cavite, 14.415833, 120.918056",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Alfonso Village, Barangay Alapan 1B, Imus, Cavite, 14.069167, 120.921667",
      "sourceLabel": "HB10858-3-0762-012842 · p. 762",
      "otherSource": "HB10858-3-0762-012844 · p. 762",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 38549.5,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.415833,
        "longitude": 120.918056,
        "raw": "14.415833, 120.918056",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.069167,
        "longitude": 120.921667,
        "raw": "14.069167, 120.921667",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alapan 1b · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Bloomfields, Barangay Alapan 1B, Imus, Cavite, 14.417222, 120.9175",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Alfonso Village, Barangay Alapan 1B, Imus, Cavite, 14.069167, 120.921667",
      "sourceLabel": "HB10858-3-0762-012843 · p. 762",
      "otherSource": "HB10858-3-0762-012844 · p. 762",
      "currentAllocationPesos": 2500000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 38704.6,
      "distanceBand": "1,000 meters or farther",
      "leftCoordinates": {
        "latitude": 14.417222,
        "longitude": 120.9175,
        "raw": "14.417222, 120.9175",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.069167,
        "longitude": 120.921667,
        "raw": "14.069167, 120.921667",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alapan 1b · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    },
    {
      "pairType": "HGAB 3rd · same barangay labels",
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Prime Homes, Barangay Bayan Luma 5, Imus, Cavite, 14.408056, 120.935833",
      "otherProject": "Rehabilitation/Completion of Multi Purpose Building at Prima Homes, Barangay Bayan Luma 5, Imus, Cavite, 14.413611, 120.936111",
      "sourceLabel": "HB10858-3-0763-012868 · p. 763",
      "otherSource": "HB10858-3-0763-012851 · p. 763",
      "currentAllocationPesos": 3000000,
      "otherAllocationPesos": 2500000,
      "municipality": "imus",
      "province": "cavite",
      "municipalityGroup": "imus · cavite",
      "municipalityEvidence": "Qualified municipality and province",
      "distanceMeters": 618.4,
      "distanceBand": "250–<1,000 meters",
      "leftCoordinates": {
        "latitude": 14.408056,
        "longitude": 120.935833,
        "raw": "14.408056, 120.935833",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.413611,
        "longitude": 120.936111,
        "raw": "14.413611, 120.936111",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bayan luma 5 · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Separated printed locations · verify sites and service areas",
      "proximityReview": "Compare sites and service areas; need remains unverified · completion/repair/improvement wording present"
    }
  ],
  "coordinateAudit": [
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Baclao, Cauayan, Negros Occidental, 16.938276, 121.764754",
      "projectId": "HB10858-3-0834-014279",
      "sourcePage": "834",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "negros occidental",
      "municipality": "cauayan",
      "barangay": "baclao",
      "namedPlace": "baclao · cauayan · negros occidental",
      "coordinateRaw": "16.938276, 121.764754",
      "latitude": 16.938276,
      "longitude": 121.764754,
      "outsideBoundaryKm": 777.9,
      "boundaryMunicipality": "Cauayan",
      "boundaryProvince": "NEGROS OCCIDENTAL",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Villamiemban, Cordon, Isabela, 17.71869, 121.40556",
      "projectId": "HB10858-3-0714-011857",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "villamiemban",
      "namedPlace": "villamiemban · cordon · isabela",
      "coordinateRaw": "17.71869, 121.40556",
      "latitude": 17.71869,
      "longitude": 121.40556,
      "outsideBoundaryKm": 106.5,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay Limon Norte, Looc, Romblon, 13.3092, 122.01873",
      "projectId": "HB10858-3-0793-013461",
      "sourcePage": "793",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "romblon",
      "municipality": "looc",
      "barangay": "limon norte",
      "namedPlace": "limon norte · looc · romblon",
      "coordinateRaw": "13.3092, 122.01873",
      "latitude": 13.3092,
      "longitude": 122.01873,
      "outsideBoundaryKm": 104.7,
      "boundaryMunicipality": "Looc",
      "boundaryProvince": "ROMBLON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Completion of Multi-Purpose Building, Barangay Eastern Wao, Wao, Lanao del Sur, 7.776133, 124.223706",
      "projectId": "HB10858-3-0648-010563",
      "sourcePage": "648",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "lanao del sur",
      "municipality": "wao",
      "barangay": "eastern wao",
      "namedPlace": "eastern wao · wao · lanao del sur",
      "coordinateRaw": "7.776133, 124.223706",
      "latitude": 7.776133,
      "longitude": 124.223706,
      "outsideBoundaryKm": 47.5,
      "boundaryMunicipality": "Wao",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Completion of Multi-Purpose Building, Barangay Poblacion, Saguiaran, Lanao del Sur, 7.645708333, 124.0001861",
      "projectId": "HB10858-3-0648-010559",
      "sourcePage": "648",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 15000000,
      "province": "lanao del sur",
      "municipality": "saguiaran",
      "barangay": "poblacion",
      "namedPlace": "poblacion · saguiaran · lanao del sur",
      "coordinateRaw": "7.645708333, 124.0001861",
      "latitude": 7.645708333,
      "longitude": 124.0001861,
      "outsideBoundaryKm": 46.3,
      "boundaryMunicipality": "Saguiaran",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Esteban, San Antonio, Zambales, 15.320217, 120.061625",
      "projectId": "HB10858-3-0747-012529",
      "sourcePage": "747",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 12000000,
      "province": "zambales",
      "municipality": "san antonio",
      "barangay": "san esteban",
      "namedPlace": "san esteban · san antonio · zambales",
      "coordinateRaw": "15.320217, 120.061625",
      "latitude": 15.320217,
      "longitude": 120.061625,
      "outsideBoundaryKm": 38.3,
      "boundaryMunicipality": "San Antonio",
      "boundaryProvince": "ZAMBALES",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Building 2), Barangay Dumawing, Jones, Isabela, 16.914686, 121.852893",
      "projectId": "HB10858-3-0716-011893",
      "sourcePage": "716",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "dumawing",
      "namedPlace": "dumawing · jones · isabela",
      "coordinateRaw": "16.914686, 121.852893",
      "latitude": 16.914686,
      "longitude": 121.852893,
      "outsideBoundaryKm": 33.5,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation/Completion of Multi Purpose Building at Alfonso Village, Barangay Alapan 1B, Imus, Cavite, 14.069167, 120.921667",
      "projectId": "HB10858-3-0762-012844",
      "sourcePage": "762",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "cavite",
      "municipality": "imus",
      "barangay": "alapan 1b",
      "namedPlace": "alapan 1b · imus · cavite",
      "coordinateRaw": "14.069167, 120.921667",
      "latitude": 14.069167,
      "longitude": 120.921667,
      "outsideBoundaryKm": 32.1,
      "boundaryMunicipality": "Imus City",
      "boundaryProvince": "CAVITE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay La Paz, San Narciso, Zambales, 15.320217, 120.061625",
      "projectId": "HB10858-3-0747-012531",
      "sourcePage": "747",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 6500000,
      "province": "zambales",
      "municipality": "san narciso",
      "barangay": "la paz",
      "namedPlace": "la paz · san narciso · zambales",
      "coordinateRaw": "15.320217, 120.061625",
      "latitude": 15.320217,
      "longitude": 120.061625,
      "outsideBoundaryKm": 31.2,
      "boundaryMunicipality": "San Narciso",
      "boundaryProvince": "ZAMBALES",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Evacuation Center, Enriquita, Lavezares, Northern Samar ( 12.21694444 , 124.40055556 )",
      "projectId": "HB10858-3-0860-014794",
      "sourcePage": "860",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 13256000,
      "province": "northern samar",
      "municipality": "lavezares",
      "barangay": null,
      "namedPlace": "lavezares · northern samar",
      "coordinateRaw": "12.21694444 , 124.40055556",
      "latitude": 12.21694444,
      "longitude": 124.40055556,
      "outsideBoundaryKm": 28.3,
      "boundaryMunicipality": "Lavezares",
      "boundaryProvince": "NORTHERN SAMAR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Salay, San Agustin, Isabela, 16.76614, 121.76379",
      "projectId": "HB10858-3-0715-011886",
      "sourcePage": "715",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "isabela",
      "municipality": "san agustin",
      "barangay": "salay",
      "namedPlace": "salay · san agustin · isabela",
      "coordinateRaw": "16.76614, 121.76379",
      "latitude": 16.76614,
      "longitude": 121.76379,
      "outsideBoundaryKm": 25.1,
      "boundaryMunicipality": "San Agustin",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Diarao, Jones, Isabela, 16.678478, 121.41045",
      "projectId": "HB10858-3-0714-011861",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "diarao",
      "namedPlace": "diarao · jones · isabela",
      "coordinateRaw": "16.678478, 121.41045",
      "latitude": 16.678478,
      "longitude": 121.41045,
      "outsideBoundaryKm": 24.4,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Tampilong, Marawi City, Lanao del Sur, 7.776133, 124.223706",
      "projectId": "HB10858-3-0649-010586",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "tampilong",
      "namedPlace": "tampilong · marawi · lanao del sur",
      "coordinateRaw": "7.776133, 124.223706",
      "latitude": 7.776133,
      "longitude": 124.223706,
      "outsideBoundaryKm": 22.0,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Buadi Parba, Marawi City, Lanao del Sur, 7.776133, 124.223706",
      "projectId": "HB10858-3-0649-010587",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": null,
      "namedPlace": "marawi · lanao del sur",
      "coordinateRaw": "7.776133, 124.223706",
      "latitude": 7.776133,
      "longitude": 124.223706,
      "outsideBoundaryKm": 22.0,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bulagsong, Municipality of Catanauan, Quezon, 13.783444, 122.089353",
      "projectId": "HB10858-3-0782-013251",
      "sourcePage": "782",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "quezon",
      "municipality": "catanauan",
      "barangay": "bulagsong",
      "namedPlace": "bulagsong · catanauan · quezon",
      "coordinateRaw": "13.783444, 122.089353",
      "latitude": 13.783444,
      "longitude": 122.089353,
      "outsideBoundaryKm": 20.8,
      "boundaryMunicipality": "Catanauan",
      "boundaryProvince": "QUEZON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Dilausan, Maguing, Lanao del Sur, 7.776133, 124.223706",
      "projectId": "HB10858-3-0649-010585",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "lanao del sur",
      "municipality": "maguing",
      "barangay": "dilausan",
      "namedPlace": "dilausan · maguing · lanao del sur",
      "coordinateRaw": "7.776133, 124.223706",
      "latitude": 7.776133,
      "longitude": 124.223706,
      "outsideBoundaryKm": 19.5,
      "boundaryMunicipality": "Maguing",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, San Jose Municipal Plaza, San Jose, Tarlac, 15.326548, 120.655563",
      "projectId": "HB10858-3-0743-012457",
      "sourcePage": "743",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 50000000,
      "province": "tarlac",
      "municipality": "san jose",
      "barangay": null,
      "namedPlace": "san jose · tarlac",
      "coordinateRaw": "15.326548, 120.655563",
      "latitude": 15.326548,
      "longitude": 120.655563,
      "outsideBoundaryKm": 16.9,
      "boundaryMunicipality": "San Jose",
      "boundaryProvince": "TARLAC",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at City Town Center, Barangay Calulut, City of San Fernando, Pampanga, 15.154250, 120.771463",
      "projectId": "HB10858-3-0740-012399",
      "sourcePage": "740",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "pampanga",
      "municipality": "san fernando",
      "barangay": "calulut",
      "namedPlace": "calulut · san fernando · pampanga",
      "coordinateRaw": "15.154250, 120.771463",
      "latitude": 15.15425,
      "longitude": 120.771463,
      "outsideBoundaryKm": 13.4,
      "boundaryMunicipality": "City Of San Fernando (Capital)",
      "boundaryProvince": "PAMPANGA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Esmeralda, Balungao, Pangasinan (16.028743, 120.658689)",
      "projectId": "HB10858-3-0685-011277",
      "sourcePage": "685",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "pangasinan",
      "municipality": "balungao",
      "barangay": "esmeralda",
      "namedPlace": "esmeralda · balungao · pangasinan",
      "coordinateRaw": "16.028743, 120.658689",
      "latitude": 16.028743,
      "longitude": 120.658689,
      "outsideBoundaryKm": 10.6,
      "boundaryMunicipality": "Balungao",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Mutli-Purpose Building, Barangay Rajah Cabungsuan, Municipality of Lingig, Surigao del Sur (7.97854, 126.25475)",
      "projectId": "HB10858-3-0924-016004",
      "sourcePage": "924",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "surigao del sur",
      "municipality": "lingig",
      "barangay": "rajah cabungsuan",
      "namedPlace": "rajah cabungsuan · lingig · surigao del sur",
      "coordinateRaw": "7.97854, 126.25475",
      "latitude": 7.97854,
      "longitude": 126.25475,
      "outsideBoundaryKm": 10.6,
      "boundaryMunicipality": "Lingig",
      "boundaryProvince": "SURIGAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Rosa, Santiago City, Isabela, 16.507357, 121.671421",
      "projectId": "HB10858-3-0716-011907",
      "sourcePage": "716",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "santiago",
      "barangay": "sta. rosa",
      "namedPlace": "sta. rosa · santiago · isabela",
      "coordinateRaw": "16.507357, 121.671421",
      "latitude": 16.507357,
      "longitude": 121.671421,
      "outsideBoundaryKm": 10.1,
      "boundaryMunicipality": "City Of Santiago",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangays Cagaluan, Lower Bangad, Pasil, Tinglayan, Kalinga, 17.391897, 121.199819",
      "projectId": "HB10858-3-0698-011527",
      "sourcePage": "698",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5500000,
      "province": "kalinga",
      "municipality": "tinglayan",
      "barangay": null,
      "namedPlace": "tinglayan · kalinga",
      "coordinateRaw": "17.391897, 121.199819",
      "latitude": 17.391897,
      "longitude": 121.199819,
      "outsideBoundaryKm": 10.0,
      "boundaryMunicipality": "Tinglayan",
      "boundaryProvince": "KALINGA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Rosales Multi-Purpose Building, Barangay Tomana West, Rosales, Pangasinan, 15.72833333, 120.6166667",
      "projectId": "HB10858-3-0632-010282",
      "sourcePage": "632",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 300000000,
      "province": "pangasinan",
      "municipality": "rosales",
      "barangay": "tomana west",
      "namedPlace": "tomana west · rosales · pangasinan",
      "coordinateRaw": "15.72833333, 120.6166667",
      "latitude": 15.72833333,
      "longitude": 120.6166667,
      "outsideBoundaryKm": 9.8,
      "boundaryMunicipality": "Rosales",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Virbira, Carasi, Ilocos Norte, 18.153493, 120.792433",
      "projectId": "HB10858-3-0665-010879",
      "sourcePage": "665",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2000000,
      "province": "ilocos norte",
      "municipality": "carasi",
      "barangay": "virbira",
      "namedPlace": "virbira · carasi · ilocos norte",
      "coordinateRaw": "18.153493, 120.792433",
      "latitude": 18.153493,
      "longitude": 120.792433,
      "outsideBoundaryKm": 7.0,
      "boundaryMunicipality": "Carasi",
      "boundaryProvince": "ILOCOS NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, BarangayVilla Capuchino, Naguilian, Isabela, 16.90611111111, 121.88872222222",
      "projectId": "HB10858-3-0709-011759",
      "sourcePage": "709",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "isabela",
      "municipality": "naguilian",
      "barangay": null,
      "namedPlace": "naguilian · isabela",
      "coordinateRaw": "16.90611111111, 121.88872222222",
      "latitude": 16.90611111111,
      "longitude": 121.88872222222,
      "outsideBoundaryKm": 6.7,
      "boundaryMunicipality": "Naguilian",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 1), Barangay Taliktik, Cordon, Isabela, 16.766545, 121.38715",
      "projectId": "HB10858-3-0714-011853",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "taliktik",
      "namedPlace": "taliktik · cordon · isabela",
      "coordinateRaw": "16.766545, 121.38715",
      "latitude": 16.766545,
      "longitude": 121.38715,
      "outsideBoundaryKm": 6.7,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building (Building 2), Barangay Taliktik, Cordon, Isabela, 16.76735, 121.38879",
      "projectId": "HB10858-3-0714-011854",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "taliktik",
      "namedPlace": "taliktik · cordon · isabela",
      "coordinateRaw": "16.76735, 121.38879",
      "latitude": 16.76735,
      "longitude": 121.38879,
      "outsideBoundaryKm": 6.6,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Macasing, Siayan, Zamboanga del Norte, 8.357072, 123.039900",
      "projectId": "HB10858-3-0865-014894",
      "sourcePage": "865",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "zamboanga del norte",
      "municipality": "siayan",
      "barangay": "macasing",
      "namedPlace": "macasing · siayan · zamboanga del norte",
      "coordinateRaw": "8.357072, 123.039900",
      "latitude": 8.357072,
      "longitude": 123.0399,
      "outsideBoundaryKm": 6.4,
      "boundaryMunicipality": "Siayan",
      "boundaryProvince": "ZAMBOANGA DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Don Pablo S. Villafuerte National High School. Matoogtoog, Mercedes, Camarines Norte, 14.01188167, 123.0387483",
      "projectId": "HB10858-3-0644-010479",
      "sourcePage": "644",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 20000000,
      "province": "camarines norte",
      "municipality": "mercedes",
      "barangay": null,
      "namedPlace": "mercedes · camarines norte",
      "coordinateRaw": "14.01188167, 123.0387483",
      "latitude": 14.01188167,
      "longitude": 123.0387483,
      "outsideBoundaryKm": 6.2,
      "boundaryMunicipality": "Mercedes",
      "boundaryProvince": "CAMARINES NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi Purpose Buidling, Barangay Huknan, Giporlos, Eastern Samar, 11.221528, 125.418753",
      "projectId": "HB10858-3-0855-014689",
      "sourcePage": "855",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5500000,
      "province": "eastern samar",
      "municipality": "giporlos",
      "barangay": "huknan",
      "namedPlace": "huknan · giporlos · eastern samar",
      "coordinateRaw": "11.221528, 125.418753",
      "latitude": 11.221528,
      "longitude": 125.418753,
      "outsideBoundaryKm": 6.0,
      "boundaryMunicipality": "Giporlos",
      "boundaryProvince": "EASTERN SAMAR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, 8.955947°, 125.605601°, Barangay Ampayon, Butuan City, Agusan del Norte",
      "projectId": "HB10858-3-0915-015833",
      "sourcePage": "915",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 16000000,
      "province": "agusan del norte",
      "municipality": "butuan",
      "barangay": "ampayon",
      "namedPlace": "ampayon · butuan · agusan del norte",
      "coordinateRaw": "8.955947°, 125.605601",
      "latitude": 8.955947,
      "longitude": 125.605601,
      "outsideBoundaryKm": 5.9,
      "boundaryMunicipality": "Butuan City (Capital)",
      "boundaryProvince": "AGUSAN DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mabato, Ayungon, Negros Oriental, 9.805947, 122.993758",
      "projectId": "HB10858-3-0838-014347",
      "sourcePage": "838",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "negros oriental",
      "municipality": "ayungon",
      "barangay": "mabato",
      "namedPlace": "mabato · ayungon · negros oriental",
      "coordinateRaw": "9.805947, 122.993758",
      "latitude": 9.805947,
      "longitude": 122.993758,
      "outsideBoundaryKm": 5.7,
      "boundaryMunicipality": "Ayungon",
      "boundaryProvince": "NEGROS ORIENTAL",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Dalamas, Tagoloan, Lanao del Norte (8.200592, 124.325894)",
      "projectId": "HB10858-3-0877-015113",
      "sourcePage": "877",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 6000000,
      "province": "lanao del norte",
      "municipality": "tagoloan",
      "barangay": "dalamas",
      "namedPlace": "dalamas · tagoloan · lanao del norte",
      "coordinateRaw": "8.200592, 124.325894",
      "latitude": 8.200592,
      "longitude": 124.325894,
      "outsideBoundaryKm": 5.0,
      "boundaryMunicipality": "Tagoloan",
      "boundaryProvince": "LANAO DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at La Union Police Provincial Office, Barangay Carlatan, City of San Fernando, La Union (16.694328, 120.312733)",
      "projectId": "HB10858-3-0677-011112",
      "sourcePage": "677",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 20000000,
      "province": "la union",
      "municipality": "san fernando",
      "barangay": "carlatan",
      "namedPlace": "carlatan · san fernando · la union",
      "coordinateRaw": "16.694328, 120.312733",
      "latitude": 16.694328,
      "longitude": 120.312733,
      "outsideBoundaryKm": 4.3,
      "boundaryMunicipality": "City Of San Fernando (Capital)",
      "boundaryProvince": "LA UNION",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Tallag, Cabagan, Isabela, 17.4262044, 121.7225187",
      "projectId": "HB10858-3-0705-011676",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5250000,
      "province": "isabela",
      "municipality": "cabagan",
      "barangay": "tallag",
      "namedPlace": "tallag · cabagan · isabela",
      "coordinateRaw": "17.4262044, 121.7225187",
      "latitude": 17.4262044,
      "longitude": 121.7225187,
      "outsideBoundaryKm": 4.2,
      "boundaryMunicipality": "Cabagan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Saui, Cabagan, Isabela, 17.419269, 121.724831",
      "projectId": "HB10858-3-0705-011675",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "cabagan",
      "barangay": "saui",
      "namedPlace": "saui · cabagan · isabela",
      "coordinateRaw": "17.419269, 121.724831",
      "latitude": 17.419269,
      "longitude": 121.724831,
      "outsideBoundaryKm": 4.1,
      "boundaryMunicipality": "Cabagan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Ilayang Yuni Elementary School, Barangay Ilayang Yuni, Municipality of Mulanay, Quezon, 13.452468, 122.524648",
      "projectId": "HB10858-3-0782-013246",
      "sourcePage": "782",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "quezon",
      "municipality": "mulanay",
      "barangay": "ilayang yuni",
      "namedPlace": "ilayang yuni · mulanay · quezon",
      "coordinateRaw": "13.452468, 122.524648",
      "latitude": 13.452468,
      "longitude": 122.524648,
      "outsideBoundaryKm": 4.0,
      "boundaryMunicipality": "Mulanay",
      "boundaryProvince": "QUEZON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bannawag, Jones, Isabela, 16.482739, 121.83957",
      "projectId": "HB10858-3-0714-011865",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "bannawag",
      "namedPlace": "bannawag · jones · isabela",
      "coordinateRaw": "16.482739, 121.83957",
      "latitude": 16.482739,
      "longitude": 121.83957,
      "outsideBoundaryKm": 3.6,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Isabela State University-San Mariano Campus, Barangay Sta. Filomena, San Mariano, Isabela, 16.98388888889, 121.97905555556",
      "projectId": "HB10858-3-0709-011755",
      "sourcePage": "709",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 8000000,
      "province": "isabela",
      "municipality": "san mariano",
      "barangay": "sta. filomena",
      "namedPlace": "sta. filomena · san mariano · isabela",
      "coordinateRaw": "16.98388888889, 121.97905555556",
      "latitude": 16.98388888889,
      "longitude": 121.97905555556,
      "outsideBoundaryKm": 3.1,
      "boundaryMunicipality": "San Mariano",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (San Antonio Central School), Barangay Poblacion, San Antonio, Quezon, 13.891078, 121.287160",
      "projectId": "HB10858-3-0781-013230",
      "sourcePage": "781",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "quezon",
      "municipality": "san antonio",
      "barangay": "poblacion",
      "namedPlace": "poblacion · san antonio · quezon",
      "coordinateRaw": "13.891078, 121.287160",
      "latitude": 13.891078,
      "longitude": 121.28716,
      "outsideBoundaryKm": 3.1,
      "boundaryMunicipality": "San Antonio",
      "boundaryProvince": "QUEZON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, BarangayNapo, Ambaguio, Nueva Vizcaya, 16.558611150830984, 120.96489029936492",
      "projectId": "HB10858-3-0720-011989",
      "sourcePage": "720",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "nueva vizcaya",
      "municipality": "ambaguio",
      "barangay": null,
      "namedPlace": "ambaguio · nueva vizcaya",
      "coordinateRaw": "16.558611150830984, 120.96489029936492",
      "latitude": 16.558611150830984,
      "longitude": 120.96489029936492,
      "outsideBoundaryKm": 3.0,
      "boundaryMunicipality": "Ambaguio",
      "boundaryProvince": "NUEVA VIZCAYA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay Santa Filomena, San Mariano, Isabela, 16.981914, 121.980831",
      "projectId": "HB10858-3-0710-011786",
      "sourcePage": "710",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "san mariano",
      "barangay": "santa filomena",
      "namedPlace": "santa filomena · san mariano · isabela",
      "coordinateRaw": "16.981914, 121.980831",
      "latitude": 16.981914,
      "longitude": 121.980831,
      "outsideBoundaryKm": 2.9,
      "boundaryMunicipality": "San Mariano",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Upper Nipaan, Sindangan, Zamboanga del Norte, 8.357072, 123.039900",
      "projectId": "HB10858-3-0866-014901",
      "sourcePage": "866",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "zamboanga del norte",
      "municipality": "sindangan",
      "barangay": "upper nipaan",
      "namedPlace": "upper nipaan · sindangan · zamboanga del norte",
      "coordinateRaw": "8.357072, 123.039900",
      "latitude": 8.357072,
      "longitude": 123.0399,
      "outsideBoundaryKm": 2.8,
      "boundaryMunicipality": "Sindangan",
      "boundaryProvince": "ZAMBOANGA DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Multi-Purpose Center) at Barangay Dipudo, Divilacan, Isabela, 17.326671, 122.360938",
      "projectId": "HB10858-3-0705-011686",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 15000000,
      "province": "isabela",
      "municipality": "divilacan",
      "barangay": "dipudo",
      "namedPlace": "dipudo · divilacan · isabela",
      "coordinateRaw": "17.326671, 122.360938",
      "latitude": 17.326671,
      "longitude": 122.360938,
      "outsideBoundaryKm": 2.7,
      "boundaryMunicipality": "Divilacan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Lapu-Lapu, Ibaan, Batangas, 13.874585, 121.121746",
      "projectId": "HB10858-3-0758-012767",
      "sourcePage": "758",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "batangas",
      "municipality": "ibaan",
      "barangay": "lapu-lapu",
      "namedPlace": "lapu-lapu · ibaan · batangas",
      "coordinateRaw": "13.874585, 121.121746",
      "latitude": 13.874585,
      "longitude": 121.121746,
      "outsideBoundaryKm": 2.7,
      "boundaryMunicipality": "Ibaan",
      "boundaryProvince": "BATANGAS",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Dallao, Cordon, Isabela, 16.773743, 121.4394",
      "projectId": "HB10858-3-0713-011850",
      "sourcePage": "713",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "dallao",
      "namedPlace": "dallao · cordon · isabela",
      "coordinateRaw": "16.773743, 121.4394",
      "latitude": 16.773743,
      "longitude": 121.4394,
      "outsideBoundaryKm": 2.5,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Calaylayan, Abucay, Bataan (14.769242, 120.537335)",
      "projectId": "HB10858-3-0725-012082",
      "sourcePage": "725",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "bataan",
      "municipality": "abucay",
      "barangay": "calaylayan",
      "namedPlace": "calaylayan · abucay · bataan",
      "coordinateRaw": "14.769242, 120.537335",
      "latitude": 14.769242,
      "longitude": 120.537335,
      "outsideBoundaryKm": 2.3,
      "boundaryMunicipality": "Abucay",
      "boundaryProvince": "BATAAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Poblacion Multi Purpose Building, Barangay Poblacion, Lezo, Aklan, 11.7083627, 122.3265016",
      "projectId": "HB10858-3-0810-013794",
      "sourcePage": "810",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 20000000,
      "province": "aklan",
      "municipality": "lezo",
      "barangay": "poblacion",
      "namedPlace": "poblacion · lezo · aklan",
      "coordinateRaw": "11.7083627, 122.3265016",
      "latitude": 11.7083627,
      "longitude": 122.3265016,
      "outsideBoundaryKm": 2.1,
      "boundaryMunicipality": "Lezo",
      "boundaryProvince": "AKLAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Caingin Tabing Ilog, Guimba, Nueva Ecija, 15.568427, 120.747150",
      "projectId": "HB10858-3-0736-012314",
      "sourcePage": "736",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "nueva ecija",
      "municipality": "guimba",
      "barangay": "caingin tabing ilog",
      "namedPlace": "caingin tabing ilog · guimba · nueva ecija",
      "coordinateRaw": "15.568427, 120.747150",
      "latitude": 15.568427,
      "longitude": 120.74715,
      "outsideBoundaryKm": 1.9,
      "boundaryMunicipality": "Guimba",
      "boundaryProvince": "NUEVA ECIJA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Sta. Lucia National High School), Barangay Sta. Lucia, Dolores, Quezon, 14.032425, 121.425425",
      "projectId": "HB10858-3-0781-013228",
      "sourcePage": "781",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "quezon",
      "municipality": "dolores",
      "barangay": "sta. lucia",
      "namedPlace": "sta. lucia · dolores · quezon",
      "coordinateRaw": "14.032425, 121.425425",
      "latitude": 14.032425,
      "longitude": 121.425425,
      "outsideBoundaryKm": 1.9,
      "boundaryMunicipality": "Dolores",
      "boundaryProvince": "QUEZON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Don Severo Felisimo Elementary School), Barangay Sta. Lucia, Dolores, Quezon, 14.033142, 121.426042",
      "projectId": "HB10858-3-0781-013229",
      "sourcePage": "781",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 12000000,
      "province": "quezon",
      "municipality": "dolores",
      "barangay": "sta. lucia",
      "namedPlace": "sta. lucia · dolores · quezon",
      "coordinateRaw": "14.033142, 121.426042",
      "latitude": 14.033142,
      "longitude": 121.426042,
      "outsideBoundaryKm": 1.9,
      "boundaryMunicipality": "Dolores",
      "boundaryProvince": "QUEZON",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Multi-Purpose Hall), Barangay San Juan, Mahaplag, Leyte (10.546652,124.918278)",
      "projectId": "HB10858-3-0860-014781",
      "sourcePage": "860",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "leyte",
      "municipality": "mahaplag",
      "barangay": "san juan",
      "namedPlace": "san juan · mahaplag · leyte",
      "coordinateRaw": "10.546652,124.918278",
      "latitude": 10.546652,
      "longitude": 124.918278,
      "outsideBoundaryKm": 1.9,
      "boundaryMunicipality": "Mahaplag",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, BarangayFlores, Naguilian, Isabela, 16.95683333333, 121.85863888889",
      "projectId": "HB10858-3-0709-011760",
      "sourcePage": "709",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "isabela",
      "municipality": "naguilian",
      "barangay": null,
      "namedPlace": "naguilian · isabela",
      "coordinateRaw": "16.95683333333, 121.85863888889",
      "latitude": 16.95683333333,
      "longitude": 121.85863888889,
      "outsideBoundaryKm": 1.7,
      "boundaryMunicipality": "Naguilian",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Gonzaga, Santiago City, Isabela, 16.655272, 121.514993",
      "projectId": "HB10858-3-0715-011880",
      "sourcePage": "715",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "isabela",
      "municipality": "santiago",
      "barangay": "villa gonzaga",
      "namedPlace": "villa gonzaga · santiago · isabela",
      "coordinateRaw": "16.655272, 121.514993",
      "latitude": 16.655272,
      "longitude": 121.514993,
      "outsideBoundaryKm": 1.7,
      "boundaryMunicipality": "City Of Santiago",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Maragni, San Fernando, Camarines Sur (13.508557, 123.088533)",
      "projectId": "HB10858-3-0800-013591",
      "sourcePage": "800",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "camarines sur",
      "municipality": "san fernando",
      "barangay": "maragni",
      "namedPlace": "maragni · san fernando · camarines sur",
      "coordinateRaw": "13.508557, 123.088533",
      "latitude": 13.508557,
      "longitude": 123.088533,
      "outsideBoundaryKm": 1.7,
      "boundaryMunicipality": "San Fernando",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Kagawasan, Dimataling, Zamboanga del Sur (7.501780, 123.347275)",
      "projectId": "HB10858-3-0869-014960",
      "sourcePage": "869",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "zamboanga del sur",
      "municipality": "dimataling",
      "barangay": "kagawasan",
      "namedPlace": "kagawasan · dimataling · zamboanga del sur",
      "coordinateRaw": "7.501780, 123.347275",
      "latitude": 7.50178,
      "longitude": 123.347275,
      "outsideBoundaryKm": 1.7,
      "boundaryMunicipality": "Dimataling",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Pupose Building (BIR- Revenue District Office) at Barangay Tagaran, Cauayan City, Isabela, 16.966417, 121.772056",
      "projectId": "HB10858-3-0635-010349",
      "sourcePage": "635",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 80000000,
      "province": "isabela",
      "municipality": "cauayan",
      "barangay": "tagaran",
      "namedPlace": "tagaran · cauayan · isabela",
      "coordinateRaw": "16.966417, 121.772056",
      "latitude": 16.966417,
      "longitude": 121.772056,
      "outsideBoundaryKm": 1.6,
      "boundaryMunicipality": "City Of Cauayan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Labuan, Umingan, Pangasinan (15.94235685, 120.74710218)",
      "projectId": "HB10858-3-0687-011304",
      "sourcePage": "687",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "pangasinan",
      "municipality": "umingan",
      "barangay": "labuan",
      "namedPlace": "labuan · umingan · pangasinan",
      "coordinateRaw": "15.94235685, 120.74710218",
      "latitude": 15.94235685,
      "longitude": 120.74710218,
      "outsideBoundaryKm": 1.6,
      "boundaryMunicipality": "Umingan",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Calaocan, San Agustin, Isabela, 16.448297, 121.715004",
      "projectId": "HB10858-3-0716-011909",
      "sourcePage": "716",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "san agustin",
      "barangay": "calaocan",
      "namedPlace": "calaocan · san agustin · isabela",
      "coordinateRaw": "16.448297, 121.715004",
      "latitude": 16.448297,
      "longitude": 121.715004,
      "outsideBoundaryKm": 1.5,
      "boundaryMunicipality": "San Agustin",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi- Purpose Building, Barangay Pasibi East, Urbiztondo, Pangasinan (15.857587, 120.380407)",
      "projectId": "HB10858-3-0681-011201",
      "sourcePage": "681",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 6000000,
      "province": "pangasinan",
      "municipality": "urbiztondo",
      "barangay": "pasibi east",
      "namedPlace": "pasibi east · urbiztondo · pangasinan",
      "coordinateRaw": "15.857587, 120.380407",
      "latitude": 15.857587,
      "longitude": 120.380407,
      "outsideBoundaryKm": 1.4,
      "boundaryMunicipality": "Urbiztondo",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Two (2) units of Multi-Purpose Building, Barangay Dalaon, Molave, Zamboanga del Sur, 8.102520, 123.517948",
      "projectId": "HB10858-3-0868-014948",
      "sourcePage": "868",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 25000000,
      "province": "zamboanga del sur",
      "municipality": "molave",
      "barangay": "dalaon",
      "namedPlace": "dalaon · molave · zamboanga del sur",
      "coordinateRaw": "8.102520, 123.517948",
      "latitude": 8.10252,
      "longitude": 123.517948,
      "outsideBoundaryKm": 1.4,
      "boundaryMunicipality": "Molave",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Furao, Gamu, Isabela, 17.0325, 121.79777777778",
      "projectId": "HB10858-3-0709-011762",
      "sourcePage": "709",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "isabela",
      "municipality": "gamu",
      "barangay": "furao",
      "namedPlace": "furao · gamu · isabela",
      "coordinateRaw": "17.0325, 121.79777777778",
      "latitude": 17.0325,
      "longitude": 121.79777777778,
      "outsideBoundaryKm": 1.3,
      "boundaryMunicipality": "Gamu",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Linamanan, Jones, Isabela, 16.530163, 121.642217",
      "projectId": "HB10858-3-0714-011863",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "linamanan",
      "namedPlace": "linamanan · jones · isabela",
      "coordinateRaw": "16.530163, 121.642217",
      "latitude": 16.530163,
      "longitude": 121.642217,
      "outsideBoundaryKm": 1.3,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Don Mariano C. Veneracion National High school (School I.D: 301968), Barangay Veneracion, Pamplona, Camarines Sur ( 13.552734°, 123.055641°)",
      "projectId": "HB10858-3-0799-013588",
      "sourcePage": "799",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "camarines sur",
      "municipality": "pamplona",
      "barangay": "veneracion",
      "namedPlace": "veneracion · pamplona · camarines sur",
      "coordinateRaw": "13.552734°, 123.055641",
      "latitude": 13.552734,
      "longitude": 123.055641,
      "outsideBoundaryKm": 1.3,
      "boundaryMunicipality": "Pamplona",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at Barangay Casibarag Sur, Cabagan, Isabela, 17.432630, 121.751657",
      "projectId": "HB10858-3-0705-011682",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "isabela",
      "municipality": "cabagan",
      "barangay": "casibarag sur",
      "namedPlace": "casibarag sur · cabagan · isabela",
      "coordinateRaw": "17.432630, 121.751657",
      "latitude": 17.43263,
      "longitude": 121.751657,
      "outsideBoundaryKm": 1.2,
      "boundaryMunicipality": "Cabagan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Cadiz Viejo, Cadiz City, Negros Occidental, 11.001388, 123.200277",
      "projectId": "HB10858-3-0832-014233",
      "sourcePage": "832",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "negros occidental",
      "municipality": "cadiz",
      "barangay": "cadiz viejo",
      "namedPlace": "cadiz viejo · cadiz · negros occidental",
      "coordinateRaw": "11.001388, 123.200277",
      "latitude": 11.001388,
      "longitude": 123.200277,
      "outsideBoundaryKm": 1.2,
      "boundaryMunicipality": "Cadiz City",
      "boundaryProvince": "NEGROS OCCIDENTAL",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Kadingilan, Wao, Lanao del Sur, 7.60262225, 124.69435119",
      "projectId": "HB10858-3-0649-010582",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "lanao del sur",
      "municipality": "wao",
      "barangay": "kadingilan",
      "namedPlace": "kadingilan · wao · lanao del sur",
      "coordinateRaw": "7.60262225, 124.69435119",
      "latitude": 7.60262225,
      "longitude": 124.69435119,
      "outsideBoundaryKm": 1.1,
      "boundaryMunicipality": "Wao",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Tubod, Lanao del Norte, 8.0370005, 123.791915",
      "projectId": "HB10858-3-0647-010549",
      "sourcePage": "647",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 100000000,
      "province": "lanao del norte",
      "municipality": "tubod",
      "barangay": "poblacion",
      "namedPlace": "poblacion · tubod · lanao del norte",
      "coordinateRaw": "8.0370005, 123.791915",
      "latitude": 8.0370005,
      "longitude": 123.791915,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "Tubod (Capital)",
      "boundaryProvince": "LANAO DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Biaba Damag, Marawi City, Lanao del Sur, 8.007728611, 124.2641181",
      "projectId": "HB10858-3-0648-010562",
      "sourcePage": "648",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "biaba damag",
      "namedPlace": "biaba damag · marawi · lanao del sur",
      "coordinateRaw": "8.007728611, 124.2641181",
      "latitude": 8.007728611,
      "longitude": 124.2641181,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Evacuation Center at Barangay Pilig Abajo, Cabagan, Isabela, 17.369376, 121.790029",
      "projectId": "HB10858-3-0705-011672",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 15000000,
      "province": "isabela",
      "municipality": "cabagan",
      "barangay": "pilig abajo",
      "namedPlace": "pilig abajo · cabagan · isabela",
      "coordinateRaw": "17.369376, 121.790029",
      "latitude": 17.369376,
      "longitude": 121.790029,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "Cabagan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "projectId": "HB10858-3-0705-011688",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 30000000,
      "province": "isabela",
      "municipality": "san pablo",
      "barangay": "poblacion",
      "namedPlace": "poblacion · san pablo · isabela",
      "coordinateRaw": "17.44767, 121.79493",
      "latitude": 17.44767,
      "longitude": 121.79493,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "San Pablo",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Balagon, Can-avid, Eastern Samar, 11.912274, 125.253025",
      "projectId": "HB10858-3-0855-014702",
      "sourcePage": "855",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "eastern samar",
      "municipality": "can-avid",
      "barangay": "balagon",
      "namedPlace": "balagon · can-avid · eastern samar",
      "coordinateRaw": "11.912274, 125.253025",
      "latitude": 11.912274,
      "longitude": 125.253025,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "Can-Avid",
      "boundaryProvince": "EASTERN SAMAR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Awao NHS, Barangay Awao, Monkayo, Davao de Oro (7.947611, 126.004833)",
      "projectId": "HB10858-3-0890-015348",
      "sourcePage": "890",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 9000000,
      "province": "davao de oro",
      "municipality": "monkayo",
      "barangay": "awao",
      "namedPlace": "awao · monkayo · davao de oro",
      "coordinateRaw": "7.947611, 126.004833",
      "latitude": 7.947611,
      "longitude": 126.004833,
      "outsideBoundaryKm": 1.0,
      "boundaryMunicipality": "Monkayo",
      "boundaryProvince": "DAVAO DE ORO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Dimalna, Marawi City, Lanao del Sur, 7.99818305, 124.25543853",
      "projectId": "HB10858-3-0648-010561",
      "sourcePage": "648",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 15000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "dimalna",
      "namedPlace": "dimalna · marawi · lanao del sur",
      "coordinateRaw": "7.99818305, 124.25543853",
      "latitude": 7.99818305,
      "longitude": 124.25543853,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Balangobong, Lingayen, Pangasinan (16.017883, 120.201778)",
      "projectId": "HB10858-3-0681-011196",
      "sourcePage": "681",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "pangasinan",
      "municipality": "lingayen",
      "barangay": "balangobong",
      "namedPlace": "balangobong · lingayen · pangasinan",
      "coordinateRaw": "16.017883, 120.201778",
      "latitude": 16.017883,
      "longitude": 120.201778,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Lingayen (Capital)",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Bagong Sikat, Alicia, Isabela, 16.798678, 121.61758",
      "projectId": "HB10858-3-0710-011777",
      "sourcePage": "710",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "isabela",
      "municipality": "alicia",
      "barangay": "bagong sikat",
      "namedPlace": "bagong sikat · alicia · isabela",
      "coordinateRaw": "16.798678, 121.61758",
      "latitude": 16.798678,
      "longitude": 121.61758,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Alicia",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Purok ni Bulan, Ramon, Isabela, 16.758972, 121.55808",
      "projectId": "HB10858-3-0710-011785",
      "sourcePage": "710",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "isabela",
      "municipality": "ramon",
      "barangay": "purok ni bulan",
      "namedPlace": "purok ni bulan · ramon · isabela",
      "coordinateRaw": "16.758972, 121.55808",
      "latitude": 16.758972,
      "longitude": 121.55808,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Ramon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Palacian, San Agustin, Isabela, 16.413851, 121.74588",
      "projectId": "HB10858-3-0716-011902",
      "sourcePage": "716",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "isabela",
      "municipality": "san agustin",
      "barangay": "palacian",
      "namedPlace": "palacian · san agustin · isabela",
      "coordinateRaw": "16.413851, 121.74588",
      "latitude": 16.413851,
      "longitude": 121.74588,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "San Agustin",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building in Barangay Jelicuon Montinola, Cabatuan, Iloilo, 10.903017, 122.536867",
      "projectId": "HB10858-3-0827-014127",
      "sourcePage": "827",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "iloilo",
      "municipality": "cabatuan",
      "barangay": "jelicuon montinola",
      "namedPlace": "jelicuon montinola · cabatuan · iloilo",
      "coordinateRaw": "10.903017, 122.536867",
      "latitude": 10.903017,
      "longitude": 122.536867,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Cabatuan",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Barangay Covered Court), Barangay Magsuganao, Mahaplag, Leyte (10.662135,124.919529)",
      "projectId": "HB10858-3-0859-014764",
      "sourcePage": "859",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "leyte",
      "municipality": "mahaplag",
      "barangay": null,
      "namedPlace": "mahaplag · leyte",
      "coordinateRaw": "10.662135,124.919529",
      "latitude": 10.662135,
      "longitude": 124.919529,
      "outsideBoundaryKm": 0.9,
      "boundaryMunicipality": "Mahaplag",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Completion of Multi-Purpose Building (Covered Court), Barangay San Pedro, Jaro, Leyte, 11.089878, 124.798658",
      "projectId": "HB10858-3-0856-014723",
      "sourcePage": "856",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "leyte",
      "municipality": "jaro",
      "barangay": "san pedro",
      "namedPlace": "san pedro · jaro · leyte",
      "coordinateRaw": "11.089878, 124.798658",
      "latitude": 11.089878,
      "longitude": 124.798658,
      "outsideBoundaryKm": 0.8,
      "boundaryMunicipality": "Jaro",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Guimba, Marawi City, Lanao del Sur, 8.03201240, 124.29814468",
      "projectId": "HB10858-3-0649-010574",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 30000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "guimba",
      "namedPlace": "guimba · marawi · lanao del sur",
      "coordinateRaw": "8.03201240, 124.29814468",
      "latitude": 8.0320124,
      "longitude": 124.29814468,
      "outsideBoundaryKm": 0.7,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "projectId": "HB10858-3-0705-011687",
      "sourcePage": "705",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 20000000,
      "province": "isabela",
      "municipality": "tumauini",
      "barangay": "san pedro",
      "namedPlace": "san pedro · tumauini · isabela",
      "coordinateRaw": "17.288839, 121.807212",
      "latitude": 17.288839,
      "longitude": 121.807212,
      "outsideBoundaryKm": 0.7,
      "boundaryMunicipality": "Tumauini",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-purpose Building, Barangay San Juan, Quirino, Isabela (17.129222, 121.702639)",
      "projectId": "HB10858-3-0706-011701",
      "sourcePage": "706",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 6000000,
      "province": "isabela",
      "municipality": "quirino",
      "barangay": "san juan",
      "namedPlace": "san juan · quirino · isabela",
      "coordinateRaw": "17.129222, 121.702639",
      "latitude": 17.129222,
      "longitude": 121.702639,
      "outsideBoundaryKm": 0.7,
      "boundaryMunicipality": "Quirino",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sinippit, Benito Soliven, Isabela, 16.87675, 121.94786111111",
      "projectId": "HB10858-3-0709-011757",
      "sourcePage": "709",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "isabela",
      "municipality": "benito soliven",
      "barangay": "sinippit",
      "namedPlace": "sinippit · benito soliven · isabela",
      "coordinateRaw": "16.87675, 121.94786111111",
      "latitude": 16.87675,
      "longitude": 121.94786111111,
      "outsideBoundaryKm": 0.7,
      "boundaryMunicipality": "Benito Soliven",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, S. Mapot, Barangay Malaiba, Canlaon City, Negros Oriental, 10.425262, 123.182441",
      "projectId": "HB10858-3-0837-014320",
      "sourcePage": "837",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "negros oriental",
      "municipality": "canlaon",
      "barangay": "malaiba",
      "namedPlace": "malaiba · canlaon · negros oriental",
      "coordinateRaw": "10.425262, 123.182441",
      "latitude": 10.425262,
      "longitude": 123.182441,
      "outsideBoundaryKm": 0.7,
      "boundaryMunicipality": "Canlaon City",
      "boundaryProvince": "NEGROS ORIENTAL",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Balagunun, Maguing, Lanao del Sur, 7.88218843, 124.35979738",
      "projectId": "HB10858-3-0649-010572",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "lanao del sur",
      "municipality": "maguing",
      "barangay": "balagunun",
      "namedPlace": "balagunun · maguing · lanao del sur",
      "coordinateRaw": "7.88218843, 124.35979738",
      "latitude": 7.88218843,
      "longitude": 124.35979738,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Maguing",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay Panaga, Laoac, Pangasinan (16.082429, 120.557804)",
      "projectId": "HB10858-3-0687-011315",
      "sourcePage": "687",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 7000000,
      "province": "pangasinan",
      "municipality": "laoac",
      "barangay": "panaga",
      "namedPlace": "panaga · laoac · pangasinan",
      "coordinateRaw": "16.082429, 120.557804",
      "latitude": 16.082429,
      "longitude": 120.557804,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Laoac",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Tiblac, Ambaguio, Nueva Vizcaya, 16.520157996565104, 121.07569503597915",
      "projectId": "HB10858-3-0720-011991",
      "sourcePage": "720",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "nueva vizcaya",
      "municipality": "ambaguio",
      "barangay": "tiblac",
      "namedPlace": "tiblac · ambaguio · nueva vizcaya",
      "coordinateRaw": "16.520157996565104, 121.07569503597915",
      "latitude": 16.520157996565104,
      "longitude": 121.07569503597915,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Ambaguio",
      "boundaryProvince": "NUEVA VIZCAYA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sta. Ana, Batad, Iloilo, 11.436319, 123.10253",
      "projectId": "HB10858-3-0822-014022",
      "sourcePage": "822",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "iloilo",
      "municipality": "batad",
      "barangay": "sta. ana",
      "namedPlace": "sta. ana · batad · iloilo",
      "coordinateRaw": "11.436319, 123.10253",
      "latitude": 11.436319,
      "longitude": 123.10253,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Batad",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completio) of Multi-Purpose Building in Barangay Tumay, Mina, Iloilo, 10.94164215, 122.59468381111",
      "projectId": "HB10858-3-0828-014143",
      "sourcePage": "828",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "iloilo",
      "municipality": "mina",
      "barangay": "tumay",
      "namedPlace": "tumay · mina · iloilo",
      "coordinateRaw": "10.94164215, 122.59468381111",
      "latitude": 10.94164215,
      "longitude": 122.59468381111,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Mina",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Casay, Dalaguete, Cebu, 9.817517, 123.555924",
      "projectId": "HB10858-3-0850-014593",
      "sourcePage": "850",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "cebu",
      "municipality": "dalaguete",
      "barangay": "casay",
      "namedPlace": "casay · dalaguete · cebu",
      "coordinateRaw": "9.817517, 123.555924",
      "latitude": 9.817517,
      "longitude": 123.555924,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Dalaguete",
      "boundaryProvince": "CEBU",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Two-Storey Multi-Purpose Building, Barangay Bag-ong Dawis, Baroy, Lanao Del Norte (8.012515, 123.776902)",
      "projectId": "HB10858-3-0877-015115",
      "sourcePage": "877",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "lanao del norte",
      "municipality": "baroy",
      "barangay": "bag-ong dawis",
      "namedPlace": "bag-ong dawis · baroy · lanao del norte",
      "coordinateRaw": "8.012515, 123.776902",
      "latitude": 8.012515,
      "longitude": 123.776902,
      "outsideBoundaryKm": 0.6,
      "boundaryMunicipality": "Baroy",
      "boundaryProvince": "LANAO DEL NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Rapasun, Marawi City, Lanao del Sur, 7.99043842, 124.25259653",
      "projectId": "HB10858-3-0649-010575",
      "sourcePage": "649",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 15000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "rapasun",
      "namedPlace": "rapasun · marawi · lanao del sur",
      "coordinateRaw": "7.99043842, 124.25259653",
      "latitude": 7.99043842,
      "longitude": 124.25259653,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Baligayan, San Quintin, Pangasinan (15.955371, 120.736202)",
      "projectId": "HB10858-3-0686-011294",
      "sourcePage": "686",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "pangasinan",
      "municipality": "san quintin",
      "barangay": "baligayan",
      "namedPlace": "baligayan · san quintin · pangasinan",
      "coordinateRaw": "15.955371, 120.736202",
      "latitude": 15.955371,
      "longitude": 120.736202,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "San Quintin",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Sinakan, Sabtang, Batanes, 20.34389°, 121.87409°",
      "projectId": "HB10858-3-0698-011537",
      "sourcePage": "698",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 40000000,
      "province": "batanes",
      "municipality": "sabtang",
      "barangay": "sinakan",
      "namedPlace": "sinakan · sabtang · batanes",
      "coordinateRaw": "20.34389°, 121.87409",
      "latitude": 20.34389,
      "longitude": 121.87409,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "Sabtang",
      "boundaryProvince": "BATANES",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-purpose Building, Barangay Caliguian, Burgos, Isabela (17.068194, 121.692083)",
      "projectId": "HB10858-3-0707-011710",
      "sourcePage": "707",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 6000000,
      "province": "isabela",
      "municipality": "burgos",
      "barangay": "caliguian",
      "namedPlace": "caliguian · burgos · isabela",
      "coordinateRaw": "17.068194, 121.692083",
      "latitude": 17.068194,
      "longitude": 121.692083,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "Burgos",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay La Paz, Jaro, Leyte (11.145194, 124.842364)",
      "projectId": "HB10858-3-0857-014736",
      "sourcePage": "857",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "leyte",
      "municipality": "jaro",
      "barangay": "la paz",
      "namedPlace": "la paz · jaro · leyte",
      "coordinateRaw": "11.145194, 124.842364",
      "latitude": 11.145194,
      "longitude": 124.842364,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "Jaro",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Guipos, Zamboanga del Sur (7.760260, 123.338970)",
      "projectId": "HB10858-3-0869-014956",
      "sourcePage": "869",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "zamboanga del sur",
      "municipality": "guipos",
      "barangay": "poblacion",
      "namedPlace": "poblacion · guipos · zamboanga del sur",
      "coordinateRaw": "7.760260, 123.338970",
      "latitude": 7.76026,
      "longitude": 123.33897,
      "outsideBoundaryKm": 0.5,
      "boundaryMunicipality": "Guipos",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Joaquin, Balungao, Pangasinan (15.93440944, 120.69512851)",
      "projectId": "HB10858-3-0685-011279",
      "sourcePage": "685",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "pangasinan",
      "municipality": "balungao",
      "barangay": "san joaquin",
      "namedPlace": "san joaquin · balungao · pangasinan",
      "coordinateRaw": "15.93440944, 120.69512851",
      "latitude": 15.93440944,
      "longitude": 120.69512851,
      "outsideBoundaryKm": 0.4,
      "boundaryMunicipality": "Balungao",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-purpose Building, Barangay Mobo, Kalibo, Aklan, 11.699892, 122.3582283",
      "projectId": "HB10858-3-0810-013782",
      "sourcePage": "810",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "aklan",
      "municipality": "kalibo",
      "barangay": "mobo",
      "namedPlace": "mobo · kalibo · aklan",
      "coordinateRaw": "11.699892, 122.3582283",
      "latitude": 11.699892,
      "longitude": 122.3582283,
      "outsideBoundaryKm": 0.4,
      "boundaryMunicipality": "Kalibo (Capital)",
      "boundaryProvince": "AKLAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building in Sitio Kinambod, Barangay Matag- ub, Janiuay, Iloilo, 10.977263, 122.493512",
      "projectId": "HB10858-3-0827-014133",
      "sourcePage": "827",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "iloilo",
      "municipality": "janiuay",
      "barangay": "matag- ub",
      "namedPlace": "matag- ub · janiuay · iloilo",
      "coordinateRaw": "10.977263, 122.493512",
      "latitude": 10.977263,
      "longitude": 122.493512,
      "outsideBoundaryKm": 0.4,
      "boundaryMunicipality": "Janiuay",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Three (3) units of Multi-Purpose Building, Barangay Lower Pulacan, Labangan, Zamboanga del Sur, 7.901500, 123.496828",
      "projectId": "HB10858-3-0868-014949",
      "sourcePage": "868",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 45000000,
      "province": "zamboanga del sur",
      "municipality": "labangan",
      "barangay": "lower pulacan",
      "namedPlace": "lower pulacan · labangan · zamboanga del sur",
      "coordinateRaw": "7.901500, 123.496828",
      "latitude": 7.9015,
      "longitude": 123.496828,
      "outsideBoundaryKm": 0.4,
      "boundaryMunicipality": "Labangan",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Mati, San Miguel, Zamboanga del Sur (7.711491, 123.293564)",
      "projectId": "HB10858-3-0869-014951",
      "sourcePage": "869",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 44000000,
      "province": "zamboanga del sur",
      "municipality": "san miguel",
      "barangay": "mati",
      "namedPlace": "mati · san miguel · zamboanga del sur",
      "coordinateRaw": "7.711491, 123.293564",
      "latitude": 7.711491,
      "longitude": 123.293564,
      "outsideBoundaryKm": 0.4,
      "boundaryMunicipality": "San Miguel",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Buadi Sacayo, Capitol Compound, Marawi City, Lanao del Sur, 7.974511, 124.260010",
      "projectId": "HB10858-3-0650-010588",
      "sourcePage": "650",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 50000000,
      "province": "lanao del sur",
      "municipality": "marawi",
      "barangay": "buadi sacayo",
      "namedPlace": "buadi sacayo · marawi · lanao del sur",
      "coordinateRaw": "7.974511, 124.260010",
      "latitude": 7.974511,
      "longitude": 124.26001,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Marawi City (Capital)",
      "boundaryProvince": "LANAO DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay 27-A Pungto, Bacarra, Ilocos Norte, 18.290685, 120.611219",
      "projectId": "HB10858-3-0664-010856",
      "sourcePage": "664",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "ilocos norte",
      "municipality": "bacarra",
      "barangay": "27-a pungto",
      "namedPlace": "27-a pungto · bacarra · ilocos norte",
      "coordinateRaw": "18.290685, 120.611219",
      "latitude": 18.290685,
      "longitude": 120.611219,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Bacarra",
      "boundaryProvince": "ILOCOS NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Campanario, Angadanan, Isabela, 16.719182, 121.748292",
      "projectId": "HB10858-3-0710-011780",
      "sourcePage": "710",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "angadanan",
      "barangay": "campanario",
      "namedPlace": "campanario · angadanan · isabela",
      "coordinateRaw": "16.719182, 121.748292",
      "latitude": 16.719182,
      "longitude": 121.748292,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Angadanan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Dalibubon, Jones, Isabela, 16.5995515, 121.678659",
      "projectId": "HB10858-3-0714-011866",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "dalibubon",
      "namedPlace": "dalibubon · jones · isabela",
      "coordinateRaw": "16.5995515, 121.678659",
      "latitude": 16.5995515,
      "longitude": 121.678659,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Usol, Jones, Isabela, 16.532201, 121.754922",
      "projectId": "HB10858-3-0714-011870",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "usol",
      "namedPlace": "usol · jones · isabela",
      "coordinateRaw": "16.532201, 121.754922",
      "latitude": 16.532201,
      "longitude": 121.754922,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Sitio Suha, Barangay Mabuco, Hermosa, Bataan, 14.821293, 120.514296",
      "projectId": "HB10858-3-0725-012079",
      "sourcePage": "725",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "bataan",
      "municipality": "hermosa",
      "barangay": "mabuco",
      "namedPlace": "mabuco · hermosa · bataan",
      "coordinateRaw": "14.821293, 120.514296",
      "latitude": 14.821293,
      "longitude": 120.514296,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Hermosa",
      "boundaryProvince": "BATAAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Linao, Licab, Nueva Ecija, 15.566295, 120.781137",
      "projectId": "HB10858-3-0736-012319",
      "sourcePage": "736",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3500000,
      "province": "nueva ecija",
      "municipality": "licab",
      "barangay": "linao",
      "namedPlace": "linao · licab · nueva ecija",
      "coordinateRaw": "15.566295, 120.781137",
      "latitude": 15.566295,
      "longitude": 120.781137,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Licab",
      "boundaryProvince": "NUEVA ECIJA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building at San Francisco, Victoria, Tarlac (15.556631, 120.623518)",
      "projectId": "HB10858-3-0743-012464",
      "sourcePage": "743",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "tarlac",
      "municipality": "victoria",
      "barangay": null,
      "namedPlace": "victoria · tarlac",
      "coordinateRaw": "15.556631, 120.623518",
      "latitude": 15.556631,
      "longitude": 120.623518,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Victoria",
      "boundaryProvince": "TARLAC",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), San Antonio National High School, (School I.D: 112787), Barangay San Antonio, Milaor, Camarines Sur (13.593696°, 123.232104°)",
      "projectId": "HB10858-3-0799-013578",
      "sourcePage": "799",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 7000000,
      "province": "camarines sur",
      "municipality": "milaor",
      "barangay": "san antonio",
      "namedPlace": "san antonio · milaor · camarines sur",
      "coordinateRaw": "13.593696°, 123.232104",
      "latitude": 13.593696,
      "longitude": 123.232104,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Milaor",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Vicente, Quinapondan, Eastern Samar, 11.150884, 125.513326",
      "projectId": "HB10858-3-0855-014699",
      "sourcePage": "855",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "eastern samar",
      "municipality": "quinapondan",
      "barangay": "san vicente",
      "namedPlace": "san vicente · quinapondan · eastern samar",
      "coordinateRaw": "11.150884, 125.513326",
      "latitude": 11.150884,
      "longitude": 125.513326,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Quinapondan",
      "boundaryProvince": "EASTERN SAMAR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Palanog, Jaro, Leyte (11.134433, 124.83265)",
      "projectId": "HB10858-3-0857-014737",
      "sourcePage": "857",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "leyte",
      "municipality": "jaro",
      "barangay": "palanog",
      "namedPlace": "palanog · jaro · leyte",
      "coordinateRaw": "11.134433, 124.83265",
      "latitude": 11.134433,
      "longitude": 124.83265,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Jaro",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Igang, Calubian, Leyte (11.399909, 124.420347)",
      "projectId": "HB10858-3-0858-014750",
      "sourcePage": "858",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "leyte",
      "municipality": "calubian",
      "barangay": null,
      "namedPlace": "calubian · leyte",
      "coordinateRaw": "11.399909, 124.420347",
      "latitude": 11.399909,
      "longitude": 124.420347,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Calubian",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Two (2) Units of Multi-Purpose Building, Barangay Poblacion, Dinas, Zamboanga del Sur (7.650920, 123.335560)",
      "projectId": "HB10858-3-0869-014953",
      "sourcePage": "869",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 25000000,
      "province": "zamboanga del sur",
      "municipality": "dinas",
      "barangay": "poblacion",
      "namedPlace": "poblacion · dinas · zamboanga del sur",
      "coordinateRaw": "7.650920, 123.335560",
      "latitude": 7.65092,
      "longitude": 123.33556,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Dinas",
      "boundaryProvince": "ZAMBOANGA DEL SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Corazon Aquino NHS, Barangay Osmeña, Compostela, Davao de Oro (7.631566, 126.105688)",
      "projectId": "HB10858-3-0889-015339",
      "sourcePage": "889",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 9000000,
      "province": "davao de oro",
      "municipality": "compostela",
      "barangay": "osmena",
      "namedPlace": "osmena · compostela · davao de oro",
      "coordinateRaw": "7.631566, 126.105688",
      "latitude": 7.631566,
      "longitude": 126.105688,
      "outsideBoundaryKm": 0.3,
      "boundaryMunicipality": "Compostela",
      "boundaryProvince": "DAVAO DE ORO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi- Purpose Building, Barangay Bayoyong, Basista, Pangasinan (15.884058, 120.379037)",
      "projectId": "HB10858-3-0682-011205",
      "sourcePage": "682",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "pangasinan",
      "municipality": "basista",
      "barangay": "bayoyong",
      "namedPlace": "bayoyong · basista · pangasinan",
      "coordinateRaw": "15.884058, 120.379037",
      "latitude": 15.884058,
      "longitude": 120.379037,
      "outsideBoundaryKm": 0.2,
      "boundaryMunicipality": "Basista",
      "boundaryProvince": "PANGASINAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Jibao-an, Santa Barbara, Iloilo, 10.776037, 122.503230",
      "projectId": "HB10858-3-0824-014079",
      "sourcePage": "824",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 7000000,
      "province": "iloilo",
      "municipality": "santa barbara",
      "barangay": "jibao-an",
      "namedPlace": "jibao-an · santa barbara · iloilo",
      "coordinateRaw": "10.776037, 122.503230",
      "latitude": 10.776037,
      "longitude": 122.50323,
      "outsideBoundaryKm": 0.2,
      "boundaryMunicipality": "Santa Barbara",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building in Barangay Pangilihan, Janiuay, Iloilo, 11.025919, 122.442466",
      "projectId": "HB10858-3-0827-014132",
      "sourcePage": "827",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "iloilo",
      "municipality": "janiuay",
      "barangay": "pangilihan",
      "namedPlace": "pangilihan · janiuay · iloilo",
      "coordinateRaw": "11.025919, 122.442466",
      "latitude": 11.025919,
      "longitude": 122.442466,
      "outsideBoundaryKm": 0.2,
      "boundaryMunicipality": "Janiuay",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building in Barangay Panalian, Maasin, Iloilo, 10.958852, 122.402640",
      "projectId": "HB10858-3-0827-014142",
      "sourcePage": "827",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 4000000,
      "province": "iloilo",
      "municipality": "maasin",
      "barangay": "panalian",
      "namedPlace": "panalian · maasin · iloilo",
      "coordinateRaw": "10.958852, 122.402640",
      "latitude": 10.958852,
      "longitude": 122.40264,
      "outsideBoundaryKm": 0.2,
      "boundaryMunicipality": "Maasin",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi Purpose Building (Covered Court), Barangay Bunacan, Calubian, Leyte (11.486508, 124.343225)",
      "projectId": "HB10858-3-0858-014747",
      "sourcePage": "858",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "leyte",
      "municipality": "calubian",
      "barangay": "bunacan",
      "namedPlace": "bunacan · calubian · leyte",
      "coordinateRaw": "11.486508, 124.343225",
      "latitude": 11.486508,
      "longitude": 124.343225,
      "outsideBoundaryKm": 0.2,
      "boundaryMunicipality": "Calubian",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building Barangay Singi, Vinzons, Camarines Norte, 14.198962, 122.867472",
      "projectId": "HB10858-3-0643-010457",
      "sourcePage": "643",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "camarines norte",
      "municipality": "vinzons",
      "barangay": "singi",
      "namedPlace": "singi · vinzons · camarines norte",
      "coordinateRaw": "14.198962, 122.867472",
      "latitude": 14.198962,
      "longitude": 122.867472,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Vinzons",
      "boundaryProvince": "CAMARINES NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Baruyen, Bangui, Ilocos Norte, 18.516322, 120.707442",
      "projectId": "HB10858-3-0664-010867",
      "sourcePage": "664",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "ilocos norte",
      "municipality": "bangui",
      "barangay": "baruyen",
      "namedPlace": "baruyen · bangui · ilocos norte",
      "coordinateRaw": "18.516322, 120.707442",
      "latitude": 18.516322,
      "longitude": 120.707442,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Bangui",
      "boundaryProvince": "ILOCOS NORTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Loria, Angadanan, Isabela, 16.7333872, 121.7398681",
      "projectId": "HB10858-3-0710-011778",
      "sourcePage": "710",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "isabela",
      "municipality": "angadanan",
      "barangay": "loria",
      "namedPlace": "loria · angadanan · isabela",
      "coordinateRaw": "16.7333872, 121.7398681",
      "latitude": 16.7333872,
      "longitude": 121.7398681,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Angadanan",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Aguinaldo, Cordon, Isabela, 16.678478, 121.41045",
      "projectId": "HB10858-3-0713-011845",
      "sourcePage": "713",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "aguinaldo",
      "namedPlace": "aguinaldo · cordon · isabela",
      "coordinateRaw": "16.678478, 121.41045",
      "latitude": 16.678478,
      "longitude": 121.41045,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Anonang, Cordon, Isabela, 16.678478, 121.41045",
      "projectId": "HB10858-3-0713-011847",
      "sourcePage": "713",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "cordon",
      "barangay": "anonang",
      "namedPlace": "anonang · cordon · isabela",
      "coordinateRaw": "16.678478, 121.41045",
      "latitude": 16.678478,
      "longitude": 121.41045,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Cordon",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Divinan, Jones, Isabela, 16.5284, 121.657997",
      "projectId": "HB10858-3-0714-011862",
      "sourcePage": "714",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "isabela",
      "municipality": "jones",
      "barangay": "divinan",
      "namedPlace": "divinan · jones · isabela",
      "coordinateRaw": "16.5284, 121.657997",
      "latitude": 16.5284,
      "longitude": 121.657997,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Jones",
      "boundaryProvince": "ISABELA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-purpose Building, Barangay Domang, Dupax del Sur, Nueva Vizcaya, 16.285710, 121.088081",
      "projectId": "HB10858-3-0719-011965",
      "sourcePage": "719",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 20000000,
      "province": "nueva vizcaya",
      "municipality": "dupax del sur",
      "barangay": "domang",
      "namedPlace": "domang · dupax del sur · nueva vizcaya",
      "coordinateRaw": "16.285710, 121.088081",
      "latitude": 16.28571,
      "longitude": 121.088081,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Dupax Del Sur",
      "boundaryProvince": "NUEVA VIZCAYA",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered court), Barangay Puting Buhangin, Orion, Bataan (14.583590, 120.590529)",
      "projectId": "HB10858-3-0727-012130",
      "sourcePage": "727",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "bataan",
      "municipality": "orion",
      "barangay": "puting buhangin",
      "namedPlace": "puting buhangin · orion · bataan",
      "coordinateRaw": "14.583590, 120.590529",
      "latitude": 14.58359,
      "longitude": 120.590529,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Orion",
      "boundaryProvince": "BATAAN",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay Masalasa, Victoria, Tarlac (15.617521, 120.736878)",
      "projectId": "HB10858-3-0743-012460",
      "sourcePage": "743",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 5000000,
      "province": "tarlac",
      "municipality": "victoria",
      "barangay": "masalasa",
      "namedPlace": "masalasa · victoria · tarlac",
      "coordinateRaw": "15.617521, 120.736878",
      "latitude": 15.617521,
      "longitude": 120.736878,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Victoria",
      "boundaryProvince": "TARLAC",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building at Barangay Asturias, Tarlac City, Tarlac (15.447768, 120.665843)",
      "projectId": "HB10858-3-0745-012494",
      "sourcePage": "745",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "tarlac",
      "municipality": "tarlac",
      "barangay": "asturias",
      "namedPlace": "asturias · tarlac · tarlac",
      "coordinateRaw": "15.447768, 120.665843",
      "latitude": 15.447768,
      "longitude": 120.665843,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "City Of Tarlac (Capital)",
      "boundaryProvince": "TARLAC",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Yakal, Silang, Cavite, 14.269335, 120.999538",
      "projectId": "HB10858-3-0769-012975",
      "sourcePage": "769",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 7000000,
      "province": "cavite",
      "municipality": "silang",
      "barangay": "yakal",
      "namedPlace": "yakal · silang · cavite",
      "coordinateRaw": "14.269335, 120.999538",
      "latitude": 14.269335,
      "longitude": 120.999538,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Silang",
      "boundaryProvince": "CAVITE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Continuation), Barangay Lupi, San Fernando, Camarines Sur , 13.527453, 123.145008",
      "projectId": "HB10858-3-0798-013574",
      "sourcePage": "798",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 50000000,
      "province": "camarines sur",
      "municipality": "san fernando",
      "barangay": "lupi",
      "namedPlace": "lupi · san fernando · camarines sur",
      "coordinateRaw": "13.527453, 123.145008",
      "latitude": 13.527453,
      "longitude": 123.145008,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "San Fernando",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Lupi Elementary School (School I.D: 113003), Barangay Lupi, San Fernando, Camarines Sur ( 13.536652°, 123.148719°)",
      "projectId": "HB10858-3-0799-013583",
      "sourcePage": "799",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "camarines sur",
      "municipality": "san fernando",
      "barangay": "lupi",
      "namedPlace": "lupi · san fernando · camarines sur",
      "coordinateRaw": "13.536652°, 123.148719",
      "latitude": 13.536652,
      "longitude": 123.148719,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "San Fernando",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tubogan, Ajuy, Iloilo, 11.221077, 122.999052",
      "projectId": "HB10858-3-0821-014003",
      "sourcePage": "821",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 2500000,
      "province": "iloilo",
      "municipality": "ajuy",
      "barangay": "tubogan",
      "namedPlace": "tubogan · ajuy · iloilo",
      "coordinateRaw": "11.221077, 122.999052",
      "latitude": 11.221077,
      "longitude": 122.999052,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "Ajuy",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Mercedes, Catbalogan City, Samar (11.7800422163, 124.87792606)",
      "projectId": "HB10858-3-0863-014848",
      "sourcePage": "863",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "samar",
      "municipality": "catbalogan",
      "barangay": "mercedes",
      "namedPlace": "mercedes · catbalogan · samar",
      "coordinateRaw": "11.7800422163, 124.87792606",
      "latitude": 11.7800422163,
      "longitude": 124.87792606,
      "outsideBoundaryKm": 0.1,
      "boundaryMunicipality": "City Of Catbalogan (Capital)",
      "boundaryProvince": "SAMAR (WESTERN SAMAR)",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Cabugao Elementary School (School I.D: 112774), Barangay Cabugao, Milaor, Camarines Sur ( 13.578918°, 123.208349°)",
      "projectId": "HB10858-3-0799-013586",
      "sourcePage": "799",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "camarines sur",
      "municipality": "milaor",
      "barangay": "cabugao",
      "namedPlace": "cabugao · milaor · camarines sur",
      "coordinateRaw": "13.578918°, 123.208349",
      "latitude": 13.578918,
      "longitude": 123.208349,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Milaor",
      "boundaryProvince": "CAMARINES SUR",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Barangay Bahit, Panay, Capiz, 11.48633, 122.78498",
      "projectId": "HB10858-3-0814-013873",
      "sourcePage": "814",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 7000000,
      "province": "capiz",
      "municipality": "panay",
      "barangay": "bahit",
      "namedPlace": "bahit · panay · capiz",
      "coordinateRaw": "11.48633, 122.78498",
      "latitude": 11.48633,
      "longitude": 122.78498,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Panay",
      "boundaryProvince": "CAPIZ",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sta. Ana, Estancia, Iloilo, 11.440593, 123.105916",
      "projectId": "HB10858-3-0822-014039",
      "sourcePage": "822",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 3000000,
      "province": "iloilo",
      "municipality": "estancia",
      "barangay": "sta. ana",
      "namedPlace": "sta. ana · estancia · iloilo",
      "coordinateRaw": "11.440593, 123.105916",
      "latitude": 11.440593,
      "longitude": 123.105916,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Estancia",
      "boundaryProvince": "ILOILO",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion Del Norte, Villaba, Leyte (11.21337, 124.39106)",
      "projectId": "HB10858-3-0858-014753",
      "sourcePage": "858",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "leyte",
      "municipality": "villaba",
      "barangay": "poblacion del norte",
      "namedPlace": "poblacion del norte · villaba · leyte",
      "coordinateRaw": "11.21337, 124.39106",
      "latitude": 11.21337,
      "longitude": 124.39106,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Villaba",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction (Completion) of Multi-Purpose Building (Agrifishery Building), Barangay Macabug, Ormoc City, Leyte (10.95255, 124.65320)",
      "projectId": "HB10858-3-0859-014761",
      "sourcePage": "859",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "leyte",
      "municipality": "ormoc",
      "barangay": "macabug",
      "namedPlace": "macabug · ormoc · leyte",
      "coordinateRaw": "10.95255, 124.65320",
      "latitude": 10.95255,
      "longitude": 124.6532,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Ormoc City",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "projectId": "HB10858-3-0860-014785",
      "sourcePage": "860",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 25000000,
      "province": "leyte",
      "municipality": "baybay",
      "barangay": null,
      "namedPlace": "baybay · leyte",
      "coordinateRaw": "10.675250, 124.796548",
      "latitude": 10.67525,
      "longitude": 124.796548,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "City Of Baybay",
      "boundaryProvince": "LEYTE",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    },
    {
      "projectName": "Construction of Multi Purpose Buildings, Barangay Macabibo, Sapang Dalaga, Misamis Occidental (8.599072, 123.592453)",
      "projectId": "HB10858-3-0881-015175",
      "sourcePage": "881",
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "amountPesos": 10000000,
      "province": "misamis occidental",
      "municipality": "sapang dalaga",
      "barangay": "macabibo",
      "namedPlace": "macabibo · sapang dalaga · misamis occidental",
      "coordinateRaw": "8.599072, 123.592453",
      "latitude": 8.599072,
      "longitude": 123.592453,
      "outsideBoundaryKm": 0.0,
      "boundaryMunicipality": "Sapang Dalaga",
      "boundaryProvince": "MISAMIS OCCIDENTAL",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries · NAMRIA-derived · March 2022 metadata"
    }
  ],
  "coordinateAuditUnresolved": {
    "Barangay identity unresolved": 385,
    "City explicitly named; city boundary used": 9,
    "Same explicit barangay/city wording only · administrative identity unverified": 63,
    "No matching municipal boundary": 39
  },
  "coordinateAuditUnresolvedProjects": [
    {
      "projectId": "HB10858-3-0655-010692",
      "projectName": "Construction of Multi-Purpose Building, Butuan City 8.942260, 125.508396",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010251",
      "projectName": "Construction of 3 Storey Multi-Purpose Building at Barangay Sto. Niño, Marikina City, 14.64050804, 121.09644525",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0645-010504",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Miagao, Iloilo – (10.646755, 122.245435)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010246",
      "projectName": "Construction (completion) of Senate President Neptali A. Gonzales General Hospital at Barangay Mauway, Mandaluyong, 14.58137917, 121.0440767",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010247",
      "projectName": "Construction (completion) of Multi-Purpose Building (Multi-Level Parking) at Senate President Neptali A. Gonzales General Hospital at Barangay Mauway, Mandaluyong, 14.5806795, 121.04413",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010248",
      "projectName": "Construction (completion) at Nueve de Febrero Elementary School, Barangay Addition Hills, Mandaluyong, 14.58731333, 121.038835",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010255",
      "projectName": "Construction (Continuation) of Multi-Purpose Building (Cancer Treatment Building) at Ospital ng Maynila, Manila, 14.563996, 120.985565",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0632-010283",
      "projectName": "Construction (Continuation) of Multi-Purpose Building (Cultural Center), Barangay Ano, San Carlos City Pangasinan, 15.948401, 120.387460",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0637-010386",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Calumpang, Calumpit, Bulacan (120.773575, 14.888856)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0638-010398",
      "projectName": "Construction of Multi Purpose Building, Mexico, Pampanga 120.719374, 15.074052",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010262",
      "projectName": "Construction of Multi-Purpose Building (Completion) at Sitio Pajo, Barangay Baesa, Quezon City, 14.66249, 121.01425",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0645-010505",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Tigbauan, Iloilo - (10.682885, 122.383108)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010253",
      "projectName": "Construction of Multi-Purpose Building (Senior Citizen's Hall) at Barangay Gulod, Quezon City, 14.716457, 121.043577",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0631-010261",
      "projectName": "Construction (Completion) of Multi-Purpose Buidling, Sentro Komunidad de Santa Cruz, Manila (14.61236745, 120.98225658)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010274",
      "projectName": "Construction of Multi-Purpose Building, Barangay Saint Joseph, San Juan City (121.031677, 14.603405)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0636-010366",
      "projectName": "Construction of Multi-Purpose Building (Main Building), Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0637-010377",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Paudpod, Botolan, Zambales 15.281956, 120.039617",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0641-010420",
      "projectName": "Construction of Multi-Purpose Building (Science and Technology High School Building) Phase II. Carmona City, Cavite, 14.309256, 121.040946",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0641-010421",
      "projectName": "Construction (Completion) of Mataas na Kahoy Ambulatory Hospital, Mataasnakahoy, Batangas, 13.960571, 121.116526",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0642-010447",
      "projectName": "Construction of Multi-Purpose Building at Barangay Magsaysay, Municipality of Aborlan, Province of Palawan, 9.41501, 118.53494",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0646-010517",
      "projectName": "Construction of Multi-Purpose Builing and other Facilities, Barangay Pusok, Lapu-Lapu City, Cebu, 10.304741, 123.957920",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0648-010555",
      "projectName": "Construction of Multi-Purpose Building (Atrium-Performance Theatre/Auditorium), Cagayan de Oro City (124.648481°, 8.483090°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0655-010693",
      "projectName": "Construction (Completion) of North Eastern Mindanao State University, Medical School Building (126.21547, 9.03855)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0881-015191",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Municipal Hall), Barangay Centro Napu, Tudela, Misamis Occidental (123.8474, 8.2413)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0648-010554",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Balingoan, Misamis Oriental (124.847967°, 9.002995°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010260",
      "projectName": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac- Almacen, Navotas City (14.657236, 120.948131)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0631-010257",
      "projectName": "Construction of Multi-Purpose Building including Site Development at FILVETS Compound, Taguig City 14.528966, 121.060473",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010275",
      "projectName": "Construction of Multi-Purpose Building, PNP Compound, Barangay Sipac-Almacen, Navotas City (14.657068, 120.948088)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0646-010528",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Adela Heights, Gandara, Samar (124.806530,12.013673)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010245",
      "projectName": "Construction of Multi-Purpose Facilities including Facilities, Talon 2, Las Piñas City, 14.44659386, 120.98486141",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010272",
      "projectName": "Construction of Multi-Purpose Building at Villa Orion, Barangay Fairview, Quezon City 14.696227, 121.063921",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0648-010552",
      "projectName": "Construction/Improvement of Multi-purpose Building, Barangay Poblacion, Kinoguitan, Misamis Oriental (124.791397°, 8.984128°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010271",
      "projectName": "Construction of Multi-purpose Building at Tierra Verde II, Barangay Pasong Tamo, Quezon City, 14.67592,121.05331",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0631-010270",
      "projectName": "Construction of Multi-purpose Building at Marcel, Barangay Pasong Tamo, Quezon City, 14.68136,121.0481803",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0630-010250",
      "projectName": "Completion of Multi-Purpose Building at Valley 5, Barangay San Antonio, Parañaque City, 14.472186, 121.027337",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0631-010263",
      "projectName": "Construction of Multi-Purpose Building (Disaster Operations Center) Del Nacia IV, Barangay Sauyo, Quezon City, 14.69012,121.04341",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0630-010249",
      "projectName": "Construction of Multi-Purpose Building at Senior Citizen Center at Barangay Addition Hills, Mandaluyong, 121.0348, 14.585161",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010252",
      "projectName": "Rehabilitation of Multi-Purpose Building, Marikina City 14.638469216868547, 121.11241042667177",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0631-010259",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0631-010266",
      "projectName": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0632-010277",
      "projectName": "Construction of Pariancillo Villa Multi-Purpose Hall (Barangay Center), Barangay Pariancillo Villa, Valenzuela City, 14.707205, 120.944432",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0636-010374",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sagaba, Sto. Domingo, Nueva Ecija, 15.596550, 120.875837",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0638-010394",
      "projectName": "Construction of Multi-Purpose Building, Naval Station Leovigildo Gantioqui (NSLG) (Multi- Purpose Hall), San Miguel, San Antonio, Zambales 14.959169, 120.069629",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010244",
      "projectName": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0630-010254",
      "projectName": "Construction of Multi-Purpose Building, Doña-Aurora St., Libis, Camarin, Barangay 175, Caloocan City, 14.765192, 121.045202",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0648-010551",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Sports Complex), Barangay Poblacion, Talisayan, Misamis Oriental (124.8849472°, 8.9974167°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0650-010594",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Pandan, Municiipality of Mambajao, Province of Camiguin, 9.243098166, 124.7238881666",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0630-010243",
      "projectName": "Completion of Multi-Purpose Building at Sta Teresita Village, Barangay Malanday, Marikina City, 14.64711272, 121.0990806",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0650-010593",
      "projectName": "Rehabilitation of Multi-purpose Building, Barangay Balbagon, Municipality of Mambajao, Province of Camiguin, 9.244108000,124.728429333",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0648-010553",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Binuangan, Misamis Oriental (124.7844333°,8.9232806°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0649-010577",
      "projectName": "Construction of Multi-Purpose Building, Amai Manabilang, Lanao del Sur, 7.974511, 124.260010",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0657-010731",
      "projectName": "Completion of Marikina Polytechnic College Multimedia Building, Marikina city, 14.630071, 121.09954",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0660-010794",
      "projectName": "Construction of Multi-Purpose Building at Barangay 628, Manila City (14.59981143, 121.00912677)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010798",
      "projectName": "Construction of 2-Storey Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70714, 121.05333",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0690-011371",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Zone 5, Bangued, Abra 17.596246, 120.618253",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0703-011635",
      "projectName": "Construction of Multi-Purpose Building at Barangay Pinili, Abulog, Cagayan (18.373602, 121.397697)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0717-011918",
      "projectName": "Construction of Multi-Purpose Building, Isabela State University (ISU), Barangay Rizal, Santiago City, Isabela), 16.98388889, 121.97905556",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0729-012169",
      "projectName": "Completion of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.878387, 14.82565)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0747-012537",
      "projectName": "Construction of Multi-Purpose Building, Barangay North Poblacion, Masinloc, Zambales 15.539049, 119.948393",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0749-012569",
      "projectName": "Construction of Multi Purpose Building, Barangay Kalaklan, Olongapo City (14.838435, 120.278898)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0749-012577",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0756-012706",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay IV, Mataasnakahoy, Batangas, 13.96044738144593, 121.1147990106656",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0853-014662",
      "projectName": "Construction of Multi-Purpose Building - Provincial Capitol, Barangay Calumpang, Naval, Biliran (124.409201°, 11.566649°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0890-015352",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Roque, New Bataan Davao de Oro (7.577725, 126.142423)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010799",
      "projectName": "Construction of Junji Multi-Purpose Building with Elevated Basketball Court at Barangay Kaligayahan, Quezon City 14.731650, 121.049834",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010800",
      "projectName": "Construction of Multi-Purpose Building (Disaster Operations Center) Del Nacia Village 1, Barangay Tandang Sora, Quezon City, 14.67966, 121.03367",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0662-010816",
      "projectName": "Construction of Multi-Purpose Building at La Mesa Heights, Quezon City 14.727520, 121.070721",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010706",
      "projectName": "Completion of Multi-Purpose Building at Midtown Subdivision, Barangay San Roque, Marikina City, 14.6218670450185, 121.101166443051",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0661-010804",
      "projectName": "Cosntruction of Multi-Purpose Building at Barangay Kaligayahan, Quezon City 14.733133, 121.042377",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010817",
      "projectName": "Construction of Multi-Purpose Building at Palmera Homes, Barangay Sta. Monica, Quezon City, 14.710784, 121.047262",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0709-011768",
      "projectName": "Construction of Multi-Purpose Building, Naguilian, Isabela 17.01665, 121.85328",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0644-010472",
      "projectName": "Construction of Multi-Purpose Building Barangay II Daet, Camarines Norte, 14.108697, 122.95821",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010730",
      "projectName": "Completion of Marikina Polytechnic College Food Service Management Building, 14.631294932063263, 121.09832624342637",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0729-012167",
      "projectName": "Construction of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.880145, 14.825185)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0747-012528",
      "projectName": "Construction of Multi-Purpose Building, Barangay Catol, Candelaria, Zambales 15.622577, 119.932785",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0799-013587",
      "projectName": "Construction of Multi-Purpose Building, Municipal Grounds, San Juan-San Lorenzo, Minalabac Camarines Sur ( 13.568901°, 123.181788°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015092",
      "projectName": "Construction of DICT Camiguin Provincial Office, Mambajao, Camiguin (124.725395, 9.244785)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0878-015118",
      "projectName": "Construction of DICT Satellite Office, Barangay Poblacion, Linamon, Lanao del Norte (124.162952°, 8.180386°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010801",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Mariblo, Quezon City, 14.635274, 121.017545",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0656-010709",
      "projectName": "Rehabilitation of Multi-Purpose Building including Site Development in Kapitan Moy Area, Barangay Sta. Elena, Marikina City, 14.630653, 121.09565",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0657-010720",
      "projectName": "Construction of Multi-Purpose Building at Batibot Block 39 Barangay Addition Hills, Mandaluyong, 14.579401, 121.036513",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010721",
      "projectName": "Construction of Multi Level Covered Court Building at Molave Barangay Addition Hills, Mandaluyong, 14.5855, 121.03675",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010726",
      "projectName": "Construction of Multi-Purpose Building Covered Court at Jose Fabella Center DSWD NCR Barangay Addition Hills, Mandaluyong, 14.585594, 121.040829",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010728",
      "projectName": "Rehabilitation of Multi-Purpose Building at Manotoc Subdivision, Barangay Sto. Niño, Marikina City, 14.64011083, 121.0964631",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0657-010729",
      "projectName": "Construction of Multi-Purpose Building at Pamantasan ng Lungsod ng Marikina, Marikina City, 14.6314, 121.0986",
      "reason": "City explicitly named; city boundary used"
    },
    {
      "projectId": "HB10858-3-0657-010737",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0659-010773",
      "projectName": "Construction of Multi-Purpose Building at Pasolo 3S Center, Barangay Pasolo, Valenzuela City, 14.706160, 120.952819",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010802",
      "projectName": "Completion of Multi-Purpose Building (Barangay Hall Compound), Barangay Balingasa, Quezon City, 14.65068, 121.0019",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0703-011634",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bagu, Abulug, Cagayan 18.44141, 121.47575",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0729-012166",
      "projectName": "Rehabilitiation of Multi-Purpose Building, Longos, Balagtas, Bulacan (120.910976, 14.819881)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0743-012466",
      "projectName": "Construction of Multi-Purpose Building, Zone 5, Barangay San Miguel, Municipality of San Manuel, Province of Tarlac, 15.080607, 120.61170",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012550",
      "projectName": "Construction (Completion) of Multi-Purpose Building and Other Facilities, Barangay Amungan, Iba, Zambales 15.390458, 120.019056",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012555",
      "projectName": "Construction (Completion) of Multi-Purpose Buildings, Barangay San Miguel, San Antonio, Zambales 14.954172, 120.072195",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0749-012563",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0749-012575",
      "projectName": "Construction of Multi-Purpose Building Barangay Hall , Barangay Old Cabalan, Olongapo City, Zambales (14.848714 ,120.315130",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0750-012584",
      "projectName": "Construction of Multi-Purpose Building DRRMO Barangay Baraca - Camachile, Subic Zambales (14.87694, 120.23416)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0816-013912",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Guimbal Iloilo (10.673400, 122.314056)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0878-015119",
      "projectName": "Construction of Multi-Purpose Building (ABC Hall), Barangay Poblacion, Tubod, Lanao del Norte (123.794056°, 8.042379°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015918",
      "projectName": "Construction of Multi-Purpose Building, Municipality of Loreto, Dinagat Islands (125.575340, 10.352961)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015924",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Cruz, Municipality of San Jose, Dinagat Islands (125.575753, 10.020742)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0830-014188",
      "projectName": "Construction of Multi-Purpose Buildings, Purok Sunflower, Barangay Taculing, Bacolod City, 10.655219, 122.956330",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0730-012186",
      "projectName": "Construction of Multi-Purpose Building (Home for the Aged), Matangtubig, Baliwag, Bulacan (120.857047, 14.957706)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0660-010778",
      "projectName": "Construction of Multi-Purpose Building, Lerma Court, Barangay 30, Caloocan City, 14.639931, 120.973771",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0655-010697",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Sucat, Muntinlupa City, 14.4574023, 121.0528488",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0656-010711",
      "projectName": "Construction (completion) at Mandaluyong College of Science and Technology, Barangay Addition Hills, Mandaluyong, 14.5846, 121.0349",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010713",
      "projectName": "Construction (completion) of Multi-Pupose Building (Covered Court) at Nayon ng Kabataan, Barangay Addition Hills, Mandaluyong, 14.584445, 121.035212",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010739",
      "projectName": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010752",
      "projectName": "Construction of Multi-Purppose Building (Covered Court), Along Pasolo Road, Barangay Pasolo, Valenzuela City, 14.709236, 120.952865",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0658-010754",
      "projectName": "Construction of Bisig Multi-Purpose Hall, Barangay Bisig, Valenzuela City, 14.712866, 120.947028",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0659-010772",
      "projectName": "Construction of Multi-Purpose Building at Canumay East 3S Center, Barangay Canumay East, Valenzuela City, 14.716991, 120.991475",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010810",
      "projectName": "Construction of Multi-Purpose Building (Completion) Health Facility at Barangay Sauyo, Quezon City, 14.687811, 121.037774",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0747-012540",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sinabacan, Candelaria, Zambales 15.656856, 119.926402",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0816-013917",
      "projectName": "Rehabilitation of Multi-Purpose Building, San Miguel Jordan, Guimaras, 10.589353, 122.589353",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0860-014782",
      "projectName": "Construction of Multi-Purpose Building, Barangay Inayupan, Javier, Leyte (10.783900, 124.973339)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0867-014919",
      "projectName": "Construction of Multi-Purpose Building in Godod, Zamboanga del Norte, 8.006772, 122.844892",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0868-014941",
      "projectName": "Construction of 2 units of Multi-Purpose Building, Barangay Libertad, Sominot, Zamboanga del Sur, 8.030723, 123.376173",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0868-014944",
      "projectName": "Construction of 2 units of Multi-Purpose Building, Barangay Wakat, Ramon Magsaysay, Zamboanga del Sur, 8.005024, 123.459103",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0748-012554",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pundaquit, San Antonio, Zambales 14.920177, 120.063109",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012558",
      "projectName": "Construction of Multi-Purpose Building, Barangay La Paz, San Narciso, Zambales 15.016086, 120.071358",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014675",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sto. Rosario, Naval, Biliran (124.391613°, 11.560757°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0635-010343",
      "projectName": "Rehabilitation of Multi-Purpose Building, CSU Carig Campus, Tuguegarao City, Cagayan Valley 17.6608166°,121.7534118°",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010813",
      "projectName": "Construction of Multi-purpose Building (SK Building) at Barangay Sauyo, Quezon City, 14.68967,121.03342",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0656-010712",
      "projectName": "Construction (completion) of Multi-Purpose Building, along 9 de Febrero , Barangay Mauway, Mandaluyong, 14.569941, 121.03184",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010727",
      "projectName": "Rehabilitation of Multi-Purpose Building at Rizal Technological University at Barangay Malamig, Mandaluyong, 14.583288, 121.03325",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0660-010781",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Arkong Bato, Valenzuela City, 14.696866, 120.954674",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0660-010788",
      "projectName": "Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010806",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Bartolome, 14.701284, 121.041237",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010809",
      "projectName": "Construction of Multi-Purpose Building (Disaster Operations Center) Mapayapa, Barangay Pasong Tamo, Quezon City, 14.68777,121.06779",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0729-012168",
      "projectName": "Construction of Multi-Purpose Building, S. Osmeña St., Poblacion, Pandi, Bulacan (120.953072, 14.858892)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0743-012467",
      "projectName": "Construction of Multi-Purpose Building, Barangay Matubog, Municipality of Camiling, Province of Tarlac, 15.686006, 120.446602",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0746-012511",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Libertad, San Narciso, Zambales 15.026323, 120.082537",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012561",
      "projectName": "Construction (Completion) of Multi-Purpose Facilities, Barangay Poblacion South, Sta. Cruz, Zambales 15.760286, 119.909701",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0749-012570",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pag-asa, Olongapo City (14.828564, 120.286469)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0751-012603",
      "projectName": "Construction of Multi-purpose Building, Barangay Haligue Silangan, Batangas City, 13.663986, 121.106207",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0795-013499",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0830-014183",
      "projectName": "Construction of Multi-Purpose Building, Villa Angeles, Barangay Estefania, Bacolod City, 10.663840, 122.985995",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0830-014192",
      "projectName": "Construction of Multi-Purpose Building in Vista Alegre Bacolod City, Negros Occidental, 11.083333, 123.03333",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014841",
      "projectName": "Construction of Multi-Purpose Building, Land Transportation Office (LTO Building), Gandara, Samar (124.807122, 12.015912)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014849",
      "projectName": "Construction of Multi-purpose Building, Paranas, Samar (11.7689, 125.0221)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0867-014916",
      "projectName": "Construction of Multi-Purpose Building in Kalawit, Zamboanga del Norte, 7.906022, 122.522743",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0874-015053",
      "projectName": "Construction of Multi-Purpose Building at USTP Balubal Campus, Barangay Balubal, Cagayan de Oro City (8.459073, 124.778347)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0876-015084",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bacnit, Municipality of Sagay, Province of Camiguin (9.123363, 124.719285)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015915",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay White Beach, Dinagat, Dinagat Islands (125.592034, 9.958603)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015925",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Cruz, Municipality of San Jose, Dinagat Islands (125.576022, 10.021376)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0703-011649",
      "projectName": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan 17.7416271, 121.6553187",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012553",
      "projectName": "Construction of Multi-Purpose Building, Barangay Zone 6, Iba, Zambales 15.323605, 119.982767",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0679-011150",
      "projectName": "Construction of Multi-Purpose Building, Sto. Tomas, La Union (16.284247, 120.390526)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010812",
      "projectName": "Construction of Multi-Purpose Building (4Storey4Classroom) at LR Pascual ES, Barangay, Baesa, Quezon City, 14.670409, 121.009451",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010825",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Xavierville I, Barangay Loyola Heights, Phase 2, Quezon City, 14.634985, 121.066953",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0747-012539",
      "projectName": "Construction of Muti-Purpose Building, Barangay Moraza, Botolan, Zambales 15.159234, 120.232274",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0655-010696",
      "projectName": "Construction of Multi-purpose Building (Social Services Area), Bayanan Old Plaza, Muntinlupa City, 14.40963177, 121.04971832",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0655-010698",
      "projectName": "Construction of Multi-Purpose Building (Social Services Area), Barangay Alabang, Muntinlupa City, 14.4095884, 121.04997165",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0656-010708",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010747",
      "projectName": "Rehabilitation of Multi-Purpose Building, San Antonio Valley 8, Parañaque City, 14.471679, 121.030024",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010748",
      "projectName": "Rehabilitation of Multi-Purpose Building at Sao Paolo, Annex 28, Better Living, Barangay Don Bosco, Parañaque City, 14.487121, 121.015716",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010805",
      "projectName": "Construction of Multi-purpose Building at Jordan Heights Subdivision, Sitio Damong Maliit, Barangay Nagkaisang Nayon, Quezon City 14.725365, 121.023890",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0661-010814",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010818",
      "projectName": "Construction of Multi-Purpose Building at Unang Lingap, Barangay Nagkaisang Nayon, Quezon City 14.723472, 121.025453",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0663-010834",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay 775, Zone 84 MPB (Sagrada Familia cor. Onyx St.) 14.571645, 121.006484",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0690-011382",
      "projectName": "Construction of Multi-Purpose Building, Barangay, San Juan, Sta. Marcela, Apayao (18.240871, 121.47495)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0699-011542",
      "projectName": "Construction of Multi-Purpose Building,Barangay San Antonio, Basco, Batanes 20.44972°,121.96741°",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0699-011543",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kayvaluganan, Uyugan, Batanes 20.34983°, 121.93853°",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0730-012181",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Siling Matanda, Pandi, Bulacan (120.98725, 14.901936)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0730-012182",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Binacod Proper, Paombong, Bulacan (120.783673, 14.781252)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0731-012208",
      "projectName": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0749-012565",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Gordon Heights, Olongapo City (14.872517, 120.292367)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0750-012591",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) Barangay Old Cabalan, Olongapo City (14.856072, 120.312775)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0854-014674",
      "projectName": "Construction of Multi-Purpose Building (Storage Facility), Barangay Calumpang, Naval, Biliran (124.410214°, 11.564484°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014684",
      "projectName": "Construction of Multi-Purpose Building (Eastern Samar State University - Hospitality Building, Maydolong Campus,) Maydolong, Eastern Samar, 11.489875, 125.507153",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0867-014918",
      "projectName": "Completion of Multi-Purpose Building in Salug, Zamboanga del Norte, 8.10778, 122.75749",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0869-014955",
      "projectName": "Construction of Two (2) Units of Multi-Purpose Building, Barangay Kabatan, Vincenzo Sagun, Zamboanga del Sur (7.515794, 123.178379)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015093",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sto. Niño, Catarman, Camiguin (124.673466333,9.149847)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015095",
      "projectName": "Construction of Multi-purpose building (Covered Court), Sitio Bliss, Barangay Pandan,Mambajao, Camiguin (124.7309, 9.237481)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015096",
      "projectName": "Construction of Multi-purpose building (Covered Court), Sitio Kabuhi, Barangay Pandan,Mambajao, Camiguin (124.718505, 9.223458)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015098",
      "projectName": "Construction of Multi-purpose building (Covered Court), Sitio Maubog, Barangay BalbagonMambajao, Camiguin (124.736056, 9.224688)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015104",
      "projectName": "Rehabilitation of Multi-Purpose Building (Health/Evacuation Center), Barangay San Jose, Mahinog, Camiguin (124.783203833,9.165928666)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015917",
      "projectName": "Construction of Multi-Purpose Building, Barangay Llamera, Libjo, Dinagat Islands (125.576967, 10.141319)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0704-011651",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Caritan Sur, Tuguegarao City, Cagayan 17.6213927, 121.7247682",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015374",
      "projectName": "Rehabilitation of Multi-Purpose Buildings at Barangay Camudmud, Babak District, Davao del Norte (7.038923, 125.739609)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010757",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0659-010760",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Green Valley, Barangay 178, Caloocan City, 14.758876, 121.063984",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0729-012173",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Bagong Nayon, Baliwag, Bulacan (120.897881, 14.961437)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0730-012177",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0795-013515",
      "projectName": "Construction of Multi Purpose Covered Court Bldg. at Buyo Elementary School Manito, Albay, 13.110351666666668, 123.86585500000001",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014670",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Masagongsong, Kawayan, Biliran (124.358756°, 11.661647°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015108",
      "projectName": "Construction of Multi-purpose Building, Barangay Tominobo Proper, Iligan City (124.227240°,8.213422°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0894-015435",
      "projectName": "Construction of Multi-Purpose Building, Inawayan Elementary School,Barangay Inawayan, Sta. Cruz, Davao del Sur (6.965470, 125.472150)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0648-010568",
      "projectName": "Construction of Multi-Purpose Building, Lumba Bayabao, Lanao del Sur, 7.84852574, 124.37755348",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0649-010569",
      "projectName": "Construction of Multi - Purpose Building, Barangay Rapasun, Marawi City, 7.990731111, 124.256795",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0649-010580",
      "projectName": "Completion of Multi-Purpose Building, Barangay Rorogagus, Marawi City Lanao del Sur, 7.81759546, 124.33352668",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0650-010591",
      "projectName": "Construction of Multi-Purpose Building, Maladi, Municipality of Picong, Lanao del Sur, 7.66909833, 123.9669133",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0661-010807",
      "projectName": "Construction of Multi-Purpose Building at Barangay Bagbag, Quezon City 14.700457, 121.025461",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010830",
      "projectName": "Rehabilitation of Multi-Purpose Building at Philippine School for the Blind, Barangay 73 Zone 10 and its vicinity, Pasay City, 14.542464, 120.996305",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0690-011379",
      "projectName": "Construction of Multi-Purpose Building, Barangay. Tanglagan, Calansasan, Apayao (18.379673, 120.964029)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0699-011541",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes 20.45211°, 121.96935°",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0734-012261",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bagbaguin, City of Meycauayan, Bulacan (121.0061038, 14.7579463)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0734-012262",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bahay Pare, City of Meycauayan, Bulacan (121.0126960, 14.7678052)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012549",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Palanginan, Iba, Zambales 15.316823, 119.991849",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0750-012587",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall) at Barangay Cawag, Subic Zambales (14.88536, 120.22389)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0750-012589",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered court) at Barangay Calapacuan, Subic Zambales (14.862606961354272, 120.24145094120631)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0751-012602",
      "projectName": "Construction (Completion) of Multi-purpose Building, Barangay Kumintang Ibaba, Batangas City, 13.766711, 121.066528",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0755-012700",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion 2, Sta. Teresita, Batangas, 13.862479, 120.983511",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0782-013247",
      "projectName": "Construction of Multi-Purpose Building, Renato Edaño Vicencio National High School, Barangay Don Juan Vercelos, Municipality of San Francisco, Quezon, , 13.264567, 122.514767",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0786-013325",
      "projectName": "Construction of Multi-Purpose Building, Broadway, Barangay Dela Paz, Antipolo City, 14.619260, 121.174490",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0817-013938",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Guibongan, Miagao, Iloilo - (10.639497, 122.249494)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0830-014185",
      "projectName": "Construction of Multi-Purpose Building(Covered Court), Purok Sunflower, Barangay Tangub, Bacolod City, 10.6331636, 122.9385407",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0830-014186",
      "projectName": "Construction of Multi-Purpose Building, Purok KBS, Barangay Sum-ag, Bacolod City, 10.5973767, 120.9109917",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0830-014187",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mandalagan, Bacolod City, 10.689906645, 122.98809403",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0830-014191",
      "projectName": "Constuction of Multi-Purpose Building at Purok 3, Batad, Barangay Singcang Airport, Bacolod City, 10.66193229, 122.9323547",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0840-014389",
      "projectName": "Construction of Multi-Purpose Building at Basay, Negros Oriental, 9.407922, 123.639095",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014665",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Baso, Cabucgayan, Biliran (124.597510°, 11.488663°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014666",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Bunga, Cabucgayan, Biliran (124.588080°, 11.481247°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014668",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014673",
      "projectName": "Construction of Multi-Purpose Building (Military Facility), Sitio Kobe, Barangay Lucsoon, Naval, Biliran (124.427771°, 11.574342°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0857-014726",
      "projectName": "Construction of Multi-Purpose Building (Phase II) in Barangay Pikas, Barogo, Leyte, 11.290236, 124.760842",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0858-014754",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion Del Sur, Viilaba, Leyte (11.21067, 124.38970)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0861-014816",
      "projectName": "Construction of Multi-Purpose Building in Purok 4 Maharlika Highway, Barangay Rawis, Lao-ang, Northern Samar, 12.559105, 125.005913",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0861-014817",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Monbon Palapag, Northen Samar (12.56901, 125.101444)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0864-014872",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Malagutay, Zamboanga City, 6.938836, 122.016736",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0864-014873",
      "projectName": "Construction of Multi-Purpose Building, Barangay Malagutay, Zamboanga City, 6.938319, 122.012928",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0864-014874",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Talisayan, Zamboanga City, 6.98517500, 121.92982222",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0873-015027",
      "projectName": "Construction of Muti-purpose Building in Barangay Carmen, Cagayan de Oro City (8.446667, 124.621389)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0874-015051",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) at CDO National High School - Senior High School, Barangay Nazareth, Cagayan de Oro City (8.473933, 124.649619)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0876-015097",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Sitio Lumad, Bura, Catarman, Camiguin (124.654669833, 9.175446833)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0882-015210",
      "projectName": "Construction/Completion of Multi-Purpose Building, Barangay Carangan, Ozamiz City, Misamis Occidental (123.839992, 8.157875)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015214",
      "projectName": "Construction of Multi-Purpose Building, Barangay Namut, Tudela, Misamis Occidental (123.70468364, 8.27780593)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015226",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Ampenican, Salay, Misamis Oriental (124.787858°,8.895868°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015370",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall) at Barangay Tagbay, Samal District, Davao del Norte (7.090066, 125.726542)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015372",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall) at Barangay Kinawitnon, Babak District, Davao del Norte (7.120292, 125.682583)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015373",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall) at Barangay Del Monte, Samal District, Davao del Norte (7.038923, 125.739609)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015376",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Remegio, Kaputian District, Davao del Norte (6.914347, 125.768535)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015903",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Sitio Maytubig, Barangay Bayanihan, Libjo, Dinagat Islands (125.647021,10.187977)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015914",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building (Evacuation Center), Barangay New Mabuhay, Dinagat, Dinagat Islands (125.618295, 9.950761)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015922",
      "projectName": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay Santiago, Loreto, Dinagat Islands (125.598155, 10.363977)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015926",
      "projectName": "Construction of Multi-Purpose Building, Barangay Sta. Cruz, San Jose, Dinagat Islands (125.572529, 10.019025)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015927",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Matingbe, San Jose, Dinagat Islands (125.575777, 10.003080)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015929",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Vicente, Tubajon, Dinagat Islands (125.559286, 10.326439)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015932",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Sitio Sto. Niño, Tigbao, Cagdianao, Dinagat Islands (125.654774, 9.898561)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012551",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Santa Barbara, Iba, Zambales 15.332061, 119.998889",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014669",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Jamorawon, Almeria, Biliran (124.384827°, 11.605187°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0889-015340",
      "projectName": "Construction of Multi-Purpose Building at Coronobe IS, Barangay Coronobe, Maragusan, Davao de Oro (7.315295, 126.158112)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0889-015344",
      "projectName": "Construction of Multi-Purpose Building, at Bagong Silang ES, Barangay Bagong Silang, Maragusan, Davao de Oro (7.293479, 126.106014)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0889-015345",
      "projectName": "Construction of Multi-Purpose Building at Mapawa CES, Barangay Mapawa, Maragusan, Davao de Oro (7.284956, 126.146664)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0889-015346",
      "projectName": "Construction of Multi-Purpose Building at Talian ES, Barangay Talian, Maragusan, Davao de Oro (7.370941, 126.148972)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0891-015367",
      "projectName": "Rehabilitation of Multi-Purpose Buildings at Barangay Caliclic, Babak District, Davao del Norte (7.110548, 125.672197)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0889-015341",
      "projectName": "Construction of Multi-Purpose Building, at Magcagong National High School, Barangay Magcagong, Maragusan, Davao de Oro (7.325354, 126.100437)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0660-010783",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Horacio Dela Costa Homes II, Barangay 179, Caloocan City, 14.748791, 121.070695",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0747-012525",
      "projectName": "Construction of Multi-Purpose Building, Barangay Banuanbayo, Cabangan, Zambales 15.1556071, 120.0547334",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0748-012562",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bulawon, Santa Cruz, Zambales 15.775388, 119.915505",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0830-014184",
      "projectName": "Construction of Multi-Purpose Building, East Villa, Barangay Estefania, Bacolod City, 10.669720, 122.999145",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0853-014661",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Cultural Center), Barangay Ermita, Maripipi, Biliran (124.343823°, 11.771111°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014671",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Sitio Lomboy, Barangay Calumpang, Naval, Biliran (124.414479°, 11.571779°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014672",
      "projectName": "Construction of Multi-Purpose Building (Maintenance Facility), Barangay Balacson, Kawayan, Biliran (124.347195°, 11.670850°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0865-014878",
      "projectName": "Construction of Multi-Purpose Building at Sitio Simariki, Barangay Talon-Talon, Zamboanga City, 6.894043, 122.101038",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0874-015054",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Corrales Elementary School, Barangay 22, Cagayan de Oro City, 8.490453°, 124.653851°",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0878-015128",
      "projectName": "Construction of Multi-Purpose Building (SK Building), Barangay Manga, Kolambugan, Lanao del Norte (123.831623°, 8.080625°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015217",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Salay, Misamis Oriental (124.787475°,8.861912°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015218",
      "projectName": "Construction (Completion) of Multi-purpose Building (Covered Court), Barangay Silad, Sugbongcogon, Misamis Oriental (124.779068°, 8.975880°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015223",
      "projectName": "Construction of Multi-Purpose Building at Barangay San Isidro (Covered Court), Magsaysay, Misamis Oriental (9.080112, 125.188458)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0883-015230",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kitotok, Kinoguitan, Misamis Oriental (124.8008528°,8.9567472°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015231",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Sta. Ines, Talisayan, Misamis Oriental (124.94276°, 8.96839°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015234",
      "projectName": "Construction (Completion) of Multi-purpose Building (Covered Court), Barangay Sta. Cruz, Sugbongcogon, Misamis Oriental (124.783848°, 8.934651°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015240",
      "projectName": "Construction of Multi-Purpose Building (Covered Court) in Barangay Poblacion, Magsaysay, Misamis Oriental (125.1817472°, 9.0217056°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015241",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Alipuaton, Salay, Misamis Oriental (124.809385°,8.856495°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015245",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Purok 6, Barangay Bulwa, Medina, Misamis Oriental (125.0056666°,8.9143266°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015246",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Puting Balas, Talisayan, Misamis Oriental (124.91325°, 8.98014°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015247",
      "projectName": "Construction of Multi-Purpose Hall, Barangay Mambayaan, Balingasag, Misamis Oriental (124.776463°,8.777165°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015248",
      "projectName": "Construction of Multi-Purpose Hall, Barangay Mimbunga, Gingoog City, Misamis Oriental (125.15563°, 8.806733°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0889-015342",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mahayahay, Maragusan, Davao de Oro (7.349793, 126.081787)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0889-015343",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pamintaran, Maragusan, Davao de Oro (7.352745, 126.127079)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0894-015436",
      "projectName": "Construction of Multi-Purpose Building, Barangay Jose Rizal, Sta. Cruz, Davao del Sur (6.942140, 125.432180)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010815",
      "projectName": "Construction of Multi-Purpose Building at Goodwill Townhomes at Barangay Bagbag, Quezon City 14.696463, 121.029594",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0652-010645",
      "projectName": "Construction of Multi-Purpose Building, Barangay Maslabeng, Buluan, Maguindanao del Sur, 6.678247, 124.790032",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010646",
      "projectName": "Construction of Multi-Purpose Building, Barangay Romongaob, South Upi, Maguindanao del Sur, 6.860841, 124.144768",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010647",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Pagalungan, Maguindanao del Sur, 7.056692, 124.699085",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010648",
      "projectName": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Montawal, Maguindanao del Sur, 7.088260, 124.753341",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010649",
      "projectName": "Construction of Multi-Purpose Building, Barangay Limpongo, Datu Hoffer Ampatuan, Maguindanao del Sur, 6.880852, 124.482485",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010650",
      "projectName": "Construction of Multi-Purpose Building, Barangay Barangay Macasampen, Guindulungan, Maguindanao del Sur, 6.958819, 124.397875",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0653-010651",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tumbao, Mangudadatu, Maguindanao del Sur, 6.649524, 124.782548",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0791-013437",
      "projectName": "Construction of Multi-Purpose Building at Barangay Manggahan, City of Puerto Princesa, Province of Palawan, 9.737904, 118.737890",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015107",
      "projectName": "Construction of Multi-purpose Building, Barangay Hinaplanon, Iligan City (124.257254°, 8.244369°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010755",
      "projectName": "Rehabilitation of Multi-Purpose Building with Ground Improvement, Horacio Dela Costa Homes II, Barangay 179, Caloocan City, 14.747192, 121.073797",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0637-010380",
      "projectName": "Construction of Multi-Purpose Building and Other Facilities, Barangay Uacon, Candelaria, Zambales 15.677564, 119.940543",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010749",
      "projectName": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0704-011650",
      "projectName": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Batu, Enrile, Cagayan 17.5382070, 121.7042974",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0704-011653",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose, Enrile, Cagayan 17.558861, 121.6934505",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0730-012187",
      "projectName": "Construction of Multi-Purpose Building (Materials Recovery Facility), Parulan, Plaridel, Bulacan (120.885356, 14.8854842)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0732-012220",
      "projectName": "Rehabilitation of Multi-Purpose Building, Lumang Bayan, Plaridel, Bulacan (120.853664, 14.895532)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012468",
      "projectName": "Construction of Multi-Purpose Building, Santa Ignacia South Central Elementary School, Barangay Pada-Pada, Municipality of Santa Ignacia, Province of Tarlac, 15.55307, 120.5158",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0854-014667",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Acaban, Culaba, Biliran (124.501334°, 11.688641°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015094",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015109",
      "projectName": "Construction of Multi Purpose Building, Barangay Maria Cristina, Iligan City (124.201185°, 8.186201°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015237",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Dansuli, Balingasag, Misamis Oriental 124.840932°,8.738102°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015238",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Gaston, Lagonglong, Misamis Oriental (124.812948°, 8.814483°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015239",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Valdeconcha, Binuangan, Misamis Oriental (124.801765°, 8.911733°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015249",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Waterfall, Balingasag, Misamis Oriental (124.7800000°,8.7346028°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015368",
      "projectName": "Construction of Multi-Purpose Building at Barangay Limao, Samal District, Davao del Norte (7.077323, 125.682486)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015375",
      "projectName": "Construction of Multi-Purpose Building, at Barangay Tagbitan-ag, Samal District, Davao del Norte (7.084815, 125.744264)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0695-011471",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangays Babalag West, Santor, Rizal, Kalinga, 17.520193, 121.585441",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0736-012306",
      "projectName": "Construction of Multi Purpose Building at Barangay Rang-ayan, Muñoz, Nueva Ecija, 15.742701, 120.881954",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0710-011771",
      "projectName": "Construction of Multi-Purpose Building, Buyasan Integrated School, San Mariano (16.802917, 122.062889)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0729-012171",
      "projectName": "Construction of Multi-Purpose Building, San Juan, Balagtas, Bulacan (120.910976, 14.812501)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0746-012516",
      "projectName": "Rehabilitation of Multi-Purpose Facilities, San Narciso, Zambales 15.015902, 120.077875",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0867-014925",
      "projectName": "Construction of Multi-Purpose Bldg in Liloy, Zamboanga del Norte, 8.133699, 122.660502",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015083",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) Bacnit, Sagay, Camiguin (124.710146999, 9.124862666)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015106",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Hindang, Iligan City, Lanao del Norte (124.345726°, 8.317925°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015139",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Andil, Lala, Lanao del Norte (123.811900°, 7.994266°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015143",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay De Asis, Kapatagan, Lanao del Norte (123.79172°, 7.89892°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015145",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Lala Proper, Lala, Lanao del Norte (123.747755°, 7.968001°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015146",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Lanipao, Lala, Lanao del Norte (123.777274°, 7.959098°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015147",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Linindingan, Poona Piagapo, Lanao del Norte (124.12467°, 8.12839°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015150",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Pinuyak, Lala, Lanao del Norte (123.751764°, 7.911119°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015151",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Raw-an, Lala, Lanao del Norte (123.773824°, 7.997482°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015152",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro Lower, Lala, Lanao del Norte (123.757704°, 7.959083°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015153",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro Upper, Lala, Lanao del Norte (123.806752°, 7.980467°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015154",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Manuel, Lala, Lanao del Norte (123.815538°, 7.907754°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0879-015155",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Vicente, Kapatagan, Lanao del Norte (123.77428°, 7.88487°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015156",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Simpak, Lala, Lanao del Norte (123.749334°, 7.936719°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015157",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Cruz Lower, Lala, Lanao del Norte (123.747006°, 7.953939°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015158",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Cruz, Kapatagan, Lanao del Norte (123.73575°, 7.89493°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015159",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Suso, Kapatagan, Lanao del Norte (123.75247°, 7.86020°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015161",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Tulatulahan, Kapatagan, Lanao del Norte (123.69553°,7.89047°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015162",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Waterfalls, Kapatagan, Lanao del Norte (123.77082°, 7.87239°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015165",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Mabugnao, Sapad, Lanao del Norte (123.836200°, 7.864267°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015166",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Maito Salug, Sapad, Lanao del Norte (123.863250°, 7.857200°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015167",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Mamaanon, Sapad, Lanao del Norte (123.883933°, 7.872967°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0880-015168",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Pendolunan, Munai, Lanao del Norte (124.06177°, 7.9777°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015369",
      "projectName": "Construction of Multi-Purpose Building at Barangay Sion, Kaputian District, Davao del Norte (6.957836, 125.764912)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0895-015454",
      "projectName": "Construction of Multi-Purpose Building (covered court) Barangay Ginatilan, Pikit, Cotabato (7.048695, 124.626431)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0643-010458",
      "projectName": "Construction of Multi-Purpose Building Barangay Calabagas San Vicente Camarines Norte, 14.08401, 123.014459",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010459",
      "projectName": "Construction of Multi-Purpose Building Barangay Lidong, Basud Camarines Norte, 14.00427, 123.01390",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010460",
      "projectName": "Construction of Multi-Purpose Building Barangay Oliva Basud, Camarines Norte, 14.01299, 122.99690",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010461",
      "projectName": "Construction of Multi-Purpose Building Barangay Guinatungan Basud Camarines Norte, 13.991281, 122.89977",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010462",
      "projectName": "Construction of Multi-Purpose Building Barangay San Felipe Basud Camarines Norte, 14.01237, 122.93050",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010464",
      "projectName": "Construction of Multi-Purpose Building Barangay Taisan, Basud Camarines Norte, 14.05835, 122.9963",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010465",
      "projectName": "Construction of Multi-Purpose Building Barangay Maisog , San Lorenzo Ruiz, Camarines Norte, 14.05258, 122.8808",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0643-010466",
      "projectName": "Construction of Multi-Purpose Building Barangay Matacong, San Lorenzo Ruiz, Camarines Norte, 14.00832, 122.849439",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0643-010467",
      "projectName": "Construction of Multi-Purpose Building purok 1 Barangay Calasgasan , Camarines Norte, 14.08465, 122.93709",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0644-010475",
      "projectName": "Construction of Multi-Purpose Building Barangay Kanluran San Vicente, Camarines Norte, 14.1078403, 122.872169",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0644-010476",
      "projectName": "Construction of Multi-Purpose Building Barangay Poblacion 2 Vinzons, Camarines Norte, 14.08401, 123.014459",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0644-010477",
      "projectName": "Completion of Multi-Purpose Building Barangay Maisog San Lorenzo Ruiz, Camarines Norte, 14.05258, 122.8808",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0649-010581",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bacolod 1, Lumba-Bayabao, Lanao del Sur, 7.776133, 124.223706",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0649-010583",
      "projectName": "Construction of Multi-Purpose Building, Barangay Dilimbayan, Maguing, 7.776133, 124.223706",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0650-010590",
      "projectName": "Construction of Multi-Purpose Building, Barangay Kitambugun, Molundo, Lanao del Sur, 7.776133, 124.223706",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010704",
      "projectName": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0656-010714",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at E. Rodriguez Integrated School at Barangay Hagdang Bato Itaas, Mandaluyong, 14.588011, 121.030687",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010715",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Addition Hills Integrated School, Barangay Addition Hills, Mandaluyong, 14.583288, 121.03325",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010716",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Hulo Integrated School at Barangay Hulo, Mandaluyong, 14.569004, 121.034764",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010717",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at City of Mandaluyong Science High School at Barangay Hulo, Mandaluyong, 14.6298, 121.0996",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010718",
      "projectName": "Rehabilitation of Multi- Pirpose Building (Covered Court and Outpost) at Block 19, Barangay Addition Hills, Mandaluyong, 14.6298, 121.0996",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0656-010719",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Mabini J. Rizal, Mandaluyong, 14.585564, 121.021158",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010722",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Isaac Lopez Integrated School at Barangay Vergara, Mandaluyong, 14.583288, 121.03325",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010723",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Block 12 Barangay Addition Hills, Mandaluyong, 14.6298, 121.0996",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010724",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Barangka Itaas, Mandaluyong, 14.583288, 121.03325",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0657-010725",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Barangka Ibaba, Mandaluyong, 14.583288, 121.03325",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0658-010744",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Ley-vic, Barangay San Perfecto, San Juan City (121.025057, 14.603140)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0660-010786",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Tala Estate, Barangay 186, Caloocan City, 14.774842, 121.071328",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0660-010787",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay 622, Manila City (14.59131149, 121.01906305)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010803",
      "projectName": "Rehabilitation of Multi-Purpose Building at B.F., Barangay Holy Spirit, Quezon City, 14.690145, 121.076070",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0661-010808",
      "projectName": "Construction of Multi-Purpose Building at Kingspoint, Barangay Bagbag, Quezon City 14.700746, 121.024567",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010827",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay 77 Zone 10 and its vicinity, Pasay City, 14.535558, 120.998649",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010828",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay 184 Zone 19 and its vicinity, Pasay City, 14.528556, 121.006309",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010829",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay 132 Zone 13 and its vicinity, Pasay City, 14.546231, 121.007711",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010831",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay 97 Zone 14 and its vicinity, Pasay City, 14.539816, 121.002382",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0662-010832",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay 128 Zone 13 and its vicinity, Pasay City, 14.552133, 121.001321",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011288",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Vicente, San Manuel, Pangasinan (Lat 16.065948, Long 120.705130)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011289",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Bonifacio, San Manuel, Pangasinan (Lat 16.093947, Long 120.674418)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011290",
      "projectName": "Construction of Multi-Purpose Building, Barangay Flores, San Manuel, Pangasinan (Lat 16.065956, Long 120.686743)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011295",
      "projectName": "Construction of Multi-Purpose Building, Barangay Bantog, San Quintin, Pangasinan (Lat 15.998217, Long 120.810275)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011302",
      "projectName": "Construction of Multi-Purpose Building, Barangay Pataquid, Sta. Maria, Pangasinan (15.960068, 120.738451)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0688-011325",
      "projectName": "Construction of Multi-Purpose Building, Barangay Casilan, Umingan, Pangasinan 15.88229723, 120.76974675",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0688-011328",
      "projectName": "Construction of Multi-Purpose Building, Barangay Tanggal Sawang, Umingan, Pangasinan 15.9409891, 120.76237384",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011357",
      "projectName": "Construction of Multi-Purpose Building, Barangay Naguilayan, San Carlos City, Pangasinan 15.963213, 120.334897",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011359",
      "projectName": "Construction of Multi-Purpose Building, Cabueldatan Elementary School, Malasiqui, Pangasinan 15.895601, 120.408428",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011361",
      "projectName": "Construction of Multi-Purpose Building, Alinggan-Banaban Elementary School, Bayambang, Pangasinan 15.836897, 120.415663",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011362",
      "projectName": "Construction of Multi-Purpose Building, Tanolong National High School, Bayambang, Pangasinan 15.808961, 120.410791",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011363",
      "projectName": "Construction of Multi-Purpose Building, Buenlag 1st Elementary School, Bayambang, Pangasinan 15.833316, 120.464651",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0690-011383",
      "projectName": "Construction of Multi-Purpose Building, Kilang, Barangay Butao, Calanasan, Apayao (18.075447, 120.933117)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0700-011565",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mabini Baggao, Cagayan, 17.85677, 121.83939",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0704-011652",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Lanna, Enrile, Cagayan 17.5742809, 121.7289317",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0704-011654",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Carig, Tuguegarao City, Cagayan 17.6595057, 121.7533519",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0704-011669",
      "projectName": "Construction of Multi-Purpose Building, CSU Carig Campus, Tuguegarao City, Cagayan 17.658580, 121.751262",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0759-012773",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Barangay Sabang, San Jose Batangas, 13.871477, 121.062333",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0794-013482",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Sagana, Bongabong, Oriental Mindoro (121.486218°,12.722329°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0807-013723",
      "projectName": "Construction/Completion of Multi-Purpose Building (Covered Court), Barangay Sta. Cruz Barcelona, Sorsogon, 12.807902, 124.120980",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0814-013859",
      "projectName": "Construction of Multi-Purpose Building in Bgy. Poblacion San Remegio Antique, 10.829109, 122.090332",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0830-014189",
      "projectName": "Rehabilitation of Mult-Purpose Building, Barangay Banago, Bacolod City, 10.70446, 122.94905",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0844-014471",
      "projectName": "Construction of Multi-Purpose Building Barangay Triple Union Municipality of Catigbian Province of Bohol, 9.873468, 124.055415",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014652",
      "projectName": "Construction (Completion) of Multi-Purpose Building Camp, Cebu City (10.372091, 123.845612)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014658",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Sudlon I, Cebu City (10.36031, 123.79391)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0853-014660",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014663",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Balite, Kawayan, Biliran (124.362540°, 11.679917°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0853-014664",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Bariis, Caibiran, Biliran (124.597752°, 11.556480°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0855-014700",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Hagna, Guiuan Eastern Samar, 11.065790, 125.735112",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0856-014705",
      "projectName": "Construction of Multi purpose Building, Barangay Calutan General Macarthur, 11.255764, 125.523821",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0858-014746",
      "projectName": "Construction of Multi Purpose Building (Barangay Hall), Barangay Ugbon, Leyte. Leyte (11.308596, 124.526586)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0861-014812",
      "projectName": "Construction of Multi-Purpose Facility (Covered Court) in Lavezares, Northern Samar (12.584648, 124.372205)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014818",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Cabicahan, Calbayog City, Samar (124.606651, 12.168488)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014820",
      "projectName": "Construction of Multi-Purpose Building, Barangay Matobato, Calbayog City, Samar (124.577359, 12.070494)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014821",
      "projectName": "Construction of Multi-Purpose Building, Barangay Mag-ubay, Calbayog City, Samar (124.567599, 12.159034)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014822",
      "projectName": "Construction of Multi-Purpose Building, Barangay Roxas 1, Calbayog City, Samar (124.597820, 12.134851)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014827",
      "projectName": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Helino, Calbayog City, Samar (124.717664, 12.236071)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014828",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Hibatang, Calbayog City, Samar (124.660012, 12.215102)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014829",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Himalandrog, Calbayog City, Samar (124.714562, 12.164709)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014830",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Jacinto, Calbayog City, Samar (124.645880, 12.205596)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014831",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Longsob, Calbayog City, Samar (124.528066, 12.156375)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014832",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Malopalo, Calbayog City, Samar ( 124.492220, 12.108889)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014833",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Rawis, Calbayog City, Samar (124.608864, 12.070655)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014834",
      "projectName": "Construction of Multi-Purpose Building (Covered Court), Barangay Tigbe, Calbayog City, Samar (124.702641, 12.215533)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014835",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Dawo, Calbayog City, Samar (124.470665, 12.2939805)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014836",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Macatingog, Calbayog City, Samar ( 124.492688, 12.308617)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0862-014837",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Panlayahan, Calbayog City, Samar (124.547930, 12.192963)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014838",
      "projectName": "Construction of Multi-Purpose Building (Evacuation Center), Barangay Tinaplacan, Calbayog City, Samar (124.368895, 12.250952)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014839",
      "projectName": "Construction of Multi-Purpose Building (New Barangay Hall), Barangay Bayo, Calbayog City, Samar (124.466199, 12.271470)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014840",
      "projectName": "Construction of Multi-Purpose Building, Barangay Limarayon (Child Development Center), Calbayog City, Samar (124.553176, 12.126921)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014842",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Alibaba, Calbayog City, Samar (124.651033, 12.130828)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014843",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Bante, Calbayog City, Samar (124.495180, 12.098479)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014844",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Mantaong, Calbayog City, Samar (124.515640, 12.187910)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014845",
      "projectName": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay San Jose, Calbayog City, Samar (124.669272, 12.114419)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014846",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Bantian, Calbayog City, Samar (124.467907, 12.133124)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0863-014847",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Peña, Calbayog City, Samar (124.402072, 12.193227)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0864-014877",
      "projectName": "Construction of Multi-Purpose Building, ZCGEMPCO , Barangay Cabaluay, Zamboanga City, 6.989400, 122.162072",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0874-015052",
      "projectName": "Construction (Completion) of Multi-Purpose Building at Macasandig Elementary School, Barangay Macasandig, Cagayan de Oro City (8.463616, 124.643987)",
      "reason": "Same explicit barangay/city wording only · administrative identity unverified"
    },
    {
      "projectId": "HB10858-3-0876-015082",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) Alga, Catarman, Camiguin (124.683219666, 9.122967333)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015085",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0876-015091",
      "projectName": "Construction (Completion) of Multi-PurposeBuilding (Covered Court) Agoho, Mambajao, Camiguin (124.668183333, 9.244668333)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015102",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015103",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015105",
      "projectName": "Construction of Multi-Purpose Building at Purok Dalamas, Barangay Puga-an, Iligan City (124.316352°, 8.20344547°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0877-015110",
      "projectName": "Construction of Multi-Purpose Building, Barangay Santa Filomena, Iligan City (124.261548°, 8.268178°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0878-015127",
      "projectName": "Construction of Multi-Purpose Building (Senior Citizens Center), Barangay Libertad, Kolambugan, Lanao del Norte (123.886847°, 8.109508°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015215",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Bal- ason, Gingoog City, Misamis Oriental (125.127222°, 8.698597°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0883-015216",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Kalipay, Gingoog City, Misamis Oriental (125.2153444°, 8.7676056°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0884-015235",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Lunotan (Covered Court), Gingoog City, Misamis Oriental (125.0281417°, 8.7203472°)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0891-015371",
      "projectName": "Rehabilitation of Multi-Purpose Building at Barangay Mambago-B, Babak District, Davao del Norte (7.106562, 125.694783)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0896-015467",
      "projectName": "Construction of Multi-purpose Building (Phase II) in Barangay Poblacion, Magpet, Cotabato (7.099352, 125.120601)",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0919-015898",
      "projectName": "Construction of Multi-Purpose Building (Passenger Terminal), Barangay White Beach, Dinagat, Dinagat Islands (125.590087, 9.959583)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015899",
      "projectName": "Improvement (Completion) of Multi-Purpose Building (Barangay Gymnasium), Barangay Catadman, Basilisa, Dinagat Islands (125.538922, 9.988313)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015902",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Loreto, Dinagat Islands (125.471703,10.443012)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015904",
      "projectName": "Construction of Multi-Purpose Building (CoveredCourt), Sitio Anas, Barangay Catadman, Basilisa, Dinagat Islands (125.544648, 9.976175)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015906",
      "projectName": "Rehabilitation of Multi-Purpose Building, Barangay Navarro, Basilisa, Dinagat Islands (125.570952,10.080260)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015912",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Boa, Cagdianao, Dinagat Islands (125.659762, 10.117853)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015913",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Cabunga-an, Cagdianao, Dinagat Islands (125.656205, 9.928658)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015916",
      "projectName": "Construction of Mutli-Purpose Building, Barangay Escolta, Dinagat, Dinagat Islands (125.593339, 9.960487)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015919",
      "projectName": "Construction of Multi-Purpose Building, Barangay San Juan, Loreto, Dinagat Islands (125.575697, 10.359468)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015920",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Ferdinand, Loreto, Dinagat Islands (125.549502, 10.374726)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015921",
      "projectName": "Construction of Multi-Purpose Building, Barangay Panamaon, Loreto, Dinagat Islands (125.614762, 10.416934)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015923",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Ferdinand, Loreto, Dinagat Islands ((125.614762, 10.416934)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015928",
      "projectName": "Construction/Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Mahayahay, San Jose, Dinagat Islands (125.585027, 10.006250)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015930",
      "projectName": "Construction of Multi-Purpose Building (Barangay Health Station), Barangay R.E.Ecleo Sr., Cagdianao, Dinagat Islands (125.641424, 9.936470)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015934",
      "projectName": "Construction (Completion) of Multi-Purpose Building (Barangay HAll) Barangay Mabuhay, Pilar, Siargao Island, Surigao del Norte (9.826381, 126.108974)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0643-010470",
      "projectName": "Completion of Multi-Purpose Building Barangay Banoboc, Vinzons Camarines Norte, 14.083963, 123.014532",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012469",
      "projectName": "Completion of Multi-Purpose Building, Barangay San Juan de Milla, Municipality of Paniqui, Province of Tarlac, 15.632765, 120.517346",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012470",
      "projectName": "Completion of Multi-Purpose Building, Barangay Tablang, Municipality of Paniqui, Province of Tarlac, 15.670704, 120.569280",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012474",
      "projectName": "Completion of Multi-Purpose Building, Barangay Mabilang, Municipality of Paniqui, Province of Tarlac, 15.675848, 120.487911",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012475",
      "projectName": "Completion of Multi-Purpose Building, Barangay San Isidro, Municipality of Paniqui, Province of Tarlac, 15.700037, 120.577336",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0827-014131",
      "projectName": "Construction (Comepltion) of Multi-Purpose Building in Barangay Tiringanan, Jainuay, Iloilo, 11.020429, 122.452505",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0867-014917",
      "projectName": "Rehabilitation/Completion of Multi-Purpose Building in Siocon, Zamboanga del Norte, 7.706657, 122.135133",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0856-014707",
      "projectName": "Construction/Completion of Multi-Purpose Building (Girl Scout of the Philippines Building), Borongan City, Eastern Samar 11.603807, 125.437031",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0865-014891",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Sitio Magutong, Barangay Salisig, Pres. Manuel Roxas, Zamboanga del Norte, 8.474208, 123.159594",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0692-011410",
      "projectName": "Construction (Completion) of Umalbong Multi-purpose Building, Umalbong, Hingyon, Ifugao 16.843856, 121.122844",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0692-011411",
      "projectName": "Construction (Completion) of Sanafe Multi-purpose Building, Sanafe, Lamut, Ifugao 16.700852, 121.236748",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0693-011434",
      "projectName": "Construction (Completion) of Namillangan Multi-purpose Building, Namillangan, Alfonso Lista, Ifugao, 16.84431, 121.499756",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0693-011436",
      "projectName": "Construction (Completion) of Caragasan Multi-purpose Building, Caragasan, Alfonso Lista, Ifugao, 17.027408, 121.491572",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0710-011772",
      "projectName": "Construction/Completion of Multi-Purpose Building, San Mariano II Central School, Barangay Minanga, San Mariano (16.99203, 122.026429)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0714-011859",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Wigan Cordon, Isabela, 16.703007, 121.44705",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012471",
      "projectName": "Completion of Multi-Purpose Building, Barangay Cariňo, Municipality of Paniqui, Province of Tarlac, 15.637524, 120.586640",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012472",
      "projectName": "Completion of Multi-Purpose Building, Barangay Cabayaoasan, Municipality of Paniqui, Province of Tarlac, 15.666111, 120.546492",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0744-012473",
      "projectName": "Completion of Multi-Purpose Building, Barangay Nancamarinan, Municipality of Paniqui, Province of Tarlac, 15.674349, 120.534831",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0814-013862",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Girls Scout Bldg. in Barangay 6, San Jose de Buenavista, Antique, 10.746803, 121.938482",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0854-014685",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Ginub-an, Lawaan, Eastern Samar, Eastern Samar, 11.139829, 125.272676",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0855-014687",
      "projectName": "Construction (Completion) of Multi-Purpose Buiding (Covered Court), Pob 2 Balangiga, Eastern Samar, 11.110642, 125.385087",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0855-014704",
      "projectName": "Rehabilitation of Multi-Purpose Building (Covered court), Llorente National Highschool, Llorente Eastern Samar, 11.409756, 125.541973",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015901",
      "projectName": "Rehabilitation/Completion of Multi-PurposeBuilding, Barangay Imee, Basilisa, Dinagat Islands (125.509961,9.998948)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015905",
      "projectName": "Construction/Completion of Multi-Purpose Building, Barangay San Juan, Loreto, Dinagat Islands (125.575773, 10.35967)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0919-015907",
      "projectName": "Construction/Completion of Multi-Purpose Building, Barangay New Mabuhay, Dinagat, Dinagat Islands (125.608389, 9.952433)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0685-011280",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion East, Natividad, Pangasinan (16.04395595, 120.79704149E)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011285",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Rosales, Pangasinan Lat 15.912667, Long 120.633300",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011296",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bantog, Sta. Maria, Pangasinan (15.96571236, 120.69556488)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011297",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Cal-litang, Sta. Maria, Pangasinan (15.94318666, 120.6589047)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011299",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Namagbagan, Sta. Maria, Pangasinan (15.95171288, 120.68617892)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011300",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay San Vicente, Sta. Maria, Pangasinan (15.98782107, 120.70832102)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0686-011301",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Sta. Rosa, Sta. Maria, Pangasinan (15.97469595, 120.68867114)",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0689-011360",
      "projectName": "Construction of Multi-Purpose Building, Barangay Amancosiling Sur, Bayambang, Pangasinan 15.775175, 120.456444",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0837-014323",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Bagawines Vallehermoso, Negros Oriental, 10.355162, 123.324091",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0837-014324",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Maglahos Vallehermoso, Negros Oriental, 10.399160, 123.274578",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0837-014327",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Biga-a La Libertad, Negros Oriental, 10.025857, 123.204158",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0837-014337",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Camandayon Jimalalud, Negros Oriental, 9.992865, 123.197553",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0838-014340",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Eli, Jimalalud Negros Oriental, 10.012528, 123.129903",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0838-014341",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Mambaid, Jimalalud Negros Oriental, 9.995463, 123.210155",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0838-014348",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tubod, Bindoy, Negros Oriental, 9.741933, 123.119069",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0838-014349",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Atotes, Bindoy, Negros Oriental, 9.756519, 123.083211",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0838-014350",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bindoy, Negros Oriental, 9.757660, 123.140655",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0838-014351",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay Tagaytay, Bindoy, Negros Oriental, 9.762108, 123.136958",
      "reason": "No matching municipal boundary"
    },
    {
      "projectId": "HB10858-3-0848-014557",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Basak, Sibonga, Cebu. 10.039066, 123.545864",
      "reason": "Barangay identity unresolved"
    },
    {
      "projectId": "HB10858-3-0920-015931",
      "projectName": "Construction (Improvement) of Multi-Purpose Building (Covered Court), Barangay R.E.Ecleo, Sr., Cagdianao, Dinagat Islands (125.641689, 9.936513)",
      "reason": "Barangay identity unresolved"
    }
  ],
  "coordinateAuditDistrictMatches": [
    {
      "projectId": "HB10858-3-0632-010279",
      "projectName": "Construction (Completion) of Multi-Purpose Building, San Andres Sports Complex, Malate, Manila 14.56880, 120.98791",
      "congressionalDistrict": "Manila City (Fifth District)",
      "place": "Malate · Manila",
      "coordinateRaw": "14.56880, 120.98791",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries"
    },
    {
      "projectId": "HB10858-3-0632-010278",
      "projectName": "Construction (Completion) of Multi-Purpose Building Barangay 719 Zone 78, P. Ocampo, Malate, Manila 14.560794, 120.99239",
      "congressionalDistrict": "Manila City (Fifth District)",
      "place": "Malate · Manila",
      "coordinateRaw": "14.560794, 120.99239",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries"
    },
    {
      "projectId": "HB10858-3-0662-010833",
      "projectName": "Construction (Completion) of Multi-Purpose Building, Barangay 740, Zone 80, Malate, Manila 14.57335, 120.99595",
      "congressionalDistrict": "Manila City (Fifth District)",
      "place": "Malate · Manila",
      "coordinateRaw": "14.57335, 120.99595",
      "boundarySource": "DPWH ArcGIS City-Municipal Boundaries"
    }
  ],
  "method": "Haversine great-circle separation, radius 6,371,008.8 meters, between one unambiguous decimal point per title. Latitude/longitude order inferred only from nonoverlapping local screening ranges (4–22 latitude, 116–127 longitude), recorded per point. At least four decimal places required. No geocoding, centroid substitution, nearest-coordinate join or coordinate borrowing from other rows/stages.",
  "limits": [
    "Printed points are not verified building footprints. Identical or nearby coordinates can be rounded, copied or reference a barangay center. Decimal precision is not positional accuracy.",
    "Under-50-meter pairs are interpreted as likely same-site references for scope review. They are not counted as two confirmed buildings. Site identity requires maps, asset IDs, designs or field verification; nearby plots can contain different structures.",
    "Municipality containment uses qualified title locations and the archived DPWH ArcGIS municipal boundary layer. Outside points are review candidates: title parsing, printed coordinates or boundaries may be wrong, and no barangay boundary layer was available.",
    "A same-barangay identity requires agreement at barangay, municipality and province levels. Matching city wording without a qualified hierarchy is separately marked unverified.",
    "One MPB per barangay is a needs-screening hypothesis, not a validated entitlement rule. Different functions, population, capacity, accessibility and hazard exposure may justify multiple facilities.",
    "Historical completion/repair allocations can fund the same legitimate building in successive years. A short distance does not establish two separate buildings or duplicate payment.",
    "Farther points can support a separate-site interpretation but do not establish need. The 50/100/250/1000-meter bins are descriptive review bands, not corruption thresholds.",
    "Pairs are not distinct projects; a cluster of three items yields three pairs. Do not sum pair allocations as losses."
  ],
  "sources": [
    {
      "file": "hb_nep_comparison_3rd.csv",
      "sha256": "6358f901c9416f7c6cde9328e5a65ac05f6d8962f0bdf6bab3c5f0ef124d36c9"
    },
    {
      "file": "priority_program_year_on_year_candidates.csv",
      "sha256": "21242acb3456af331d97c39c048813a4d7a357d851198162406b834e1eed6924"
    },
    {
      "file": "philippine_locations.sqlite",
      "sha256": "2270ba0190faad3cdd4add2a0208d43341a13d6c45675ff585d0fbc963545dbd"
    }
  ]
}
