Average Projects per Contractor: -
Standard Deviation: -
Contractors Beyond 3 SD: - (Highly Unusual)
Total Budget: β±0
Average per Project: β±0
Highest Year: -
Project | Region | Year | Type | ||
---|---|---|---|---|---|
β³
Loading data...
|
Source: Department of Public Works and Highways (DPWH) Flood Control Information System
Total Projects: 9,855 flood control projects nationwide
Data Range: 2016-2024 infrastructure projects
Projects with identical contract amounts located within 1km of each other. Each pair has the exact same cost and is geographically close, which may warrant investigation.
Loading...
Loading...
Loading...
# | Distance | Red Flags | Project 1 | Project 2 |
---|---|---|---|---|
Loading proximity data... |
Analyze contractor performance, project counts, and spending patterns
Loading...
Loading...
Contractor Name | SEC Status | Projects | Total Cost | Avg Cost/Project | Suspicion Score |
---|---|---|---|---|---|
π
Loading contractor data...
|
Source: Department of Public Works and Highways (DPWH) Flood Control Information System
Total Projects: 9,855 flood control projects nationwide
Data Range: 2016-2024 infrastructure projects
Visualize relationships between companies through joint ventures. Each connection represents a shared project.
Loading...
Loading...
Loading...
Loading...
Note: Node size = total contract value. Hover over nodes/lines for details. Click and drag to explore. Dashed red lines indicate potentially same company with different names.
Source: Department of Public Works and Highways (DPWH) Flood Control Information System
Joint Ventures: 386 identified partnerships (12.87% of all projects)
Analysis: Companies connected through joint venture relationships
Analyze contractor SEC registration data and identify contractors without SEC information
Loading...
Loading...
Loading...
Loading...
Source: Department of Public Works and Highways (DPWH) Flood Control Information System, Securities and Exchange Commission (SEC) Philippines
Total Projects: 9,855 flood control projects nationwide
Data Range: 2016-2024 infrastructure projects