Six sub-program controls define the comparable annex scope. Additional recovered rows correct extraction coverage; project-level insertions require separate identity matching.
The workbook provides NIA named-project and programme subsidy entries, while this appendix lists finer irrigation works and segments. An unmatched title across these hierarchy levels cannot establish an insertion. A detailed external NEP annex is now available; local row-level counterpart reconciliation remains incomplete. See source-checked named NIA comparisons for the seven allocation changes at the named-project level. The locally available FY2025 historical screen found no displayed high-title-match candidates in this appendix; that is a separate historical comparison.
HGAB 2nd-versus-3rd results are on the dedicated reading-comparison page →
Source occurrences and their printed allocation fields are retained. Amounts are proposals, not payments or losses. A missing baseline is represented by an explicit status, not numeric zero. Source PDF page references come from the current candidate extraction and require original-page scope review. Graphs show the first 12 filtered rows; CSV exports all filtered rows.
The NEP workbook contains NIA named project and programme-level subsidy entries. The HGAB irrigation appendix contains finer works such as canal components and stated segments. These are different hierarchy levels and cannot establish appendix-level insertions simply through absent exact titles.
Compare source-checked named NIA allocations against NEP → · Inspect grouped NEP entries and source components
Comparative source: csiiiv FY2027 budget analysis · GitHub snapshot 34ef5d8cbbac. Downloaded 2026-10-18T08:46:20Z. Primary budget PDFs remain authoritative. Reconciliation, source hashes and update details (JSON).
Other Irrigation System: NEP PHP 3,000,000,000 versus House PHP 460,000,000; change PHP -2,540,000,000. These are external printed-annex controls, not project identities or proof of a transfer.
| NIA scope | Project rows | Allocation pesos |
|---|---|---|
| External NEP detailed annex | 791 | ₱17,598,181,000 |
| External House annex | 828 | ₱17,999,305,000 |
| Adopted HGAB detailed schedule | 828 | ₱17,999,305,000 |
The preferred House source is the retained second-reading copy. Its audit reports text equivalence across the NIA annex readings; this does not independently authenticate the bill. Annex totals and named major NIA projects are different scopes and must not be added without checking their budget hierarchy.
Preferred extraction: csiiiv budget-analysis workbench · pinned source revision. Documented human corrections take priority over the older automated extraction. Raw titles, repair history, unresolved flags and source identifiers are preserved. This does not claim that every row was individually image-reviewed.
Compare the same printed irrigation sub-programs: NEP 791 rows / ₱17,598,181,000; HGAB 828 rows / ₱17,999,305,000. Net adjustment: ₱401,124,000. The old 423-row local extraction missed part of the annex; correcting that extraction is not a legislative insertion. Named major NIA projects are a separate scope.
| Sub-program | NEP allocation pesos | HGAB allocation pesos | Allocation adjustment pesos |
|---|---|---|---|
| National Irrigation System | ₱4,662,231,000 | ₱5,471,255,000 | ₱809,024,000 |
| Communal Irrigation System | ₱1,620,000,000 | ₱3,243,000,000 | ₱1,623,000,000 |
| Other Irrigation System | ₱3,000,000,000 | ₱460,000,000 | ₱-2,540,000,000 |
| Establishment of Pump Irrigation | ₱7,915,950,000 | ₱8,466,950,000 | ₱551,000,000 |
| Special Irrigation | ₱200,000,000 | ₱158,100,000 | ₱-41,900,000 |
| Extension/Expansion | ₱200,000,000 | ₱200,000,000 | ₱0 |
Controls are directly comparable at sub-program level. The difference in project counts does not identify individual insertions or removals. Annex text equivalence between the local House readings is preserved in the adoption record.
Download accepted NEP/HGAB annex rows and provenance (JSON) · Source adoption and reading-equivalence record
These named-project allocations and the detailed irrigation annex are different budget slices. Their totals must not be added without reconciling hierarchy.
Named NIA allocations · NEP → HGAB 3rd reading 7 exact named-title allocations changed −₱1.50B net adjustment across these matched rows only Named HGAB rows 32 all checked against visible PDF title/amount rows Unresolved scope Separate review blank, zero and repeated-name entries are not interchangeable This is a matched subset of NIA, not the agency’s total budget. Exact titles do not certify engineering-scope identity; earlier House reading comparisons are on the dedicated comparison page.
These name-based candidates compare FY2027 HGAB lines with FY2025 enacted GAA lines. Similar names can describe different scopes or locations, so confirm project type, location, stage, and source line before treating them as repeats. FY2026 GAA line items are not available locally for this screen.
Project repeat comparisons and source evidence →
Counts of named project candidates at each exact amount. Identical amounts do not establish equal project size or unit cost.
Each row preserves the source page and nearby schedule text to help review its place in the hierarchy.
The 32 named project candidate amounts sum to ; the printed Total, Project(s) subtotal on PDF page 572 is . Difference: . The schedule also contains program and PAP summaries; these are not additional project rows. An exact sum is a completeness check, not independent verification of every title-to-amount pairing or project-level classification.
Search project names, amount, PDF page, or nearby source context. Use the source PDF to verify project scope and hierarchy.
| Project title candidate | Amount | PDF page | Nearby source context | Review note |
|---|
This compares FY2027 NEP named-entry allocations with HGAB 3rd-reading named rows. Earlier House reading comparisons are on the dedicated comparison page. All 32 HGAB named title/amount rows have visible-PDF checks. Blank NEP amounts are not zeros; ambiguous repeated names stay unresolved.
| Graph project | NIA named project | NEP allocation pesos | HGAB allocation pesos | Allocation adjustment pesos | Comparison evidence | NEP workbook rows | HGAB PDF page |
|---|---|---|---|---|---|---|---|
| 1 | Sta. Filomena Irrigation Project, Cagayan | ₱500,000,000 | ₱250,000,000 | −₱250,000,000 | Exact named counterpart · allocation changed | 740342 | 571 |
| 2 | East Apayao-Abulug Irrigation System and Extension Project, Cagayan | ₱200,000,000 | ₱100,000,000 | −₱100,000,000 | Exact named counterpart · allocation changed | 740348 | 571 |
| 3 | Linoan Small Reservoir Irrigation Project (SRIP), Davao de Oro | ₱314,000,000 | ₱214,000,000 | −₱100,000,000 | Exact named counterpart · allocation changed | 740402 | 571 |
| 4 | Tumauini River Multipurpose Project, Isabela | ₱2,000,000,000 | ₱1,000,000,000 | −₱1,000,000,000 | Exact named counterpart · allocation changed | 740302 | 570 |
| 5 | Cabangan Small Reservoir Irrigation Project (SRIP), Zambales | ₱300,000,000 | ₱100,000,000 | −₱200,000,000 | Exact named counterpart · allocation changed | 740407 | 571 |
| 6 | Ugasan - Juanico Small Reservoir Irrigation Project (SRIP), Iloilo | ₱250,000,000 | ₱100,000,000 | −₱150,000,000 | Exact named counterpart · allocation changed | 740408 | 571 |
| 7 | Pantingan Small Reservoir Irrigation Project (SRIP), Bataan | ₱200,000,000 | ₱500,000,000 | +₱300,000,000 | Exact named counterpart · allocation changed | 740416 | 572 |
| — | Cabiao Water Impounding Project, Nueva Ecija | Not established | ₱500,000,000 | Not established | Unresolved named counterpart; original-source review | Unresolved | 571 |
| — | Abuan River Irrigation Project, Isabela | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740347 | 571 |
| — | Alimit Dam Multipurpose Irrigation Project, Isabela | Not established | ₱500,000,000 | Not established | Unresolved named counterpart; original-source review | Unresolved | 571 |
| — | Ilaguen Multipurpose Irrigation & Hydropower Plant Project, Isabela | Not established | ₱500,000,000 | Not established | Unresolved named counterpart; original-source review | Unresolved | 571 |
| — | Macalelon Small Reservoir Irrigation Project (SRIP), Quezon | Not established | ₱200,000,000 | Not established | Unresolved named counterpart; original-source review | Unresolved | 571 |
| — | Bagtingon Small Reservoir Irrigation Project (SRIP), Marinduque | ₱300,000,000 | ₱300,000,000 | ₱0 | Exact named counterpart · same allocation | 740380 | 571 |
| — | Cabano Small Reservoir Irrigation Project (SRIP), Guimaras | ₱130,000,000 | ₱130,000,000 | ₱0 | Exact named counterpart · same allocation | 740392 | 571 |
| — | Tulunan Small Reservoir Irrigation Project (SRIP), North Cotabato | ₱850,000,000 | ₱850,000,000 | ₱0 | Exact named counterpart · same allocation | 740395 | 571 |
| — | Dumuloc Small Reservoir Irrigation Project (SRIP), Pangasinan | ₱400,000,000 | ₱400,000,000 | ₱0 | Exact named counterpart · same allocation | 740398 | 571 |
| — | Balasig Small Reservoir Irrigation Project (SRIP), Isabela | ₱200,000,000 | ₱200,000,000 | ₱0 | Exact named counterpart · same allocation | 740400 | 571 |
| — | Calapangan Small Reservoir Irrigation Project (SRIP), Cagayan | ₱300,000,000 | ₱300,000,000 | ₱0 | Exact named counterpart · same allocation | 740401 | 571 |
| — | Cabacanan Small Reservoir Irrigation Project (SRIP), Ilocos Norte | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740403 | 571 |
| — | San Felipe Small Reservoir Irrigation Project (SRIP), La Union | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740405 | 571 |
| — | Panay River Basin Integrated Development Project, Iloilo & Capiz | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740306 | 570 |
| — | Balog - Balog Multipurpose Project Phase II, Tarlac | ₱1,000,000,000 | ₱1,000,000,000 | ₱0 | Exact named counterpart · same allocation | 740312 | 570 |
| — | Bayabas Irrigation Project, Bulacan | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740321 | 570 |
| — | Ilocos Norte - Ilocos Sur - Abra Irrigation Project, Stage 2 | ₱1,000,000,000 | ₱1,000,000,000 | ₱0 | Exact named counterpart · same allocation | 740324 | 570 |
| — | Lower Apayao River Irrigation Project, Apayao | Not established | ₱100,000,000 | Not established | Unresolved named counterpart; original-source review | Unresolved | 570 |
| — | Esther Vintar Small Reservoir Irrigation Project (SRIP), Ilocos Norte | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740412 | 571 |
| — | Bustos Dam Afterbay Structure, Bulacan | ₱200,000,000 | ₱200,000,000 | ₱0 | Exact named counterpart · same allocation | 740338 | 570 |
| — | Dupitac Small Reservoir Irrigation Project (SRIP), Ilocos Norte | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740413 | 571 |
| — | Paoay Lake Irrigation Project, Ilocos Norte | ₱200,000,000 | ₱200,000,000 | ₱0 | Exact named counterpart · same allocation | 740341 | 570 |
| — | Estancia Small Reservoir Irrigation Project (SRIP), Ilocos Norte | ₱100,000,000 | ₱100,000,000 | ₱0 | Exact named counterpart · same allocation | 740414 | 571 |
| — | Baligatan (Tangke Creek) Small Reservoir Irrigation Project (SRIP), Isabela | ₱250,000,000 | ₱250,000,000 | ₱0 | Exact named counterpart · same allocation | 740417 | 572 |
| — | Jalaur River Multi Purpose Project, Stage II, Iloilo Korea EDCF Loan No. PHL-15 | ₱961,321,000 | ₱961,321,000 | ₱0 | Exact named counterpart · same allocation | 740350 | 572 |
61 grouped NIA entries carry positive allocations; 23 have explicit zero and 132 have blank amounts. These counts include activities and programme envelopes, not only construction projects. Named HGAB rows are a subset of the NIA budget: do not treat their net adjustment as the agency’s total change.
Source descriptions are retained. All NIA expenditure classes are included: GOCC project subsidies are classified as MOOE in the workbook, so a Capital-Outlays-only filter would miss them. Exact normalized whole-title NIA counterparts support descriptive allocation changes, with source rows preserved; not certified engineering scope. Fuzzy matches require qualified town/province and no explicit conflicts and do not establish changes. Repeated exact titles across grouped identities remain unresolved. Detailed NIA irrigation appendix rows and HFEP facility rows are not compared one-to-one with programme envelopes.
Every source component, grouped entry and comparison JSON · Visible PDF row/control evidence
Comparative source: csiiiv FY2027 budget analysis · GitHub snapshot 34ef5d8cbbac. Downloaded 2026-10-18T08:46:20Z. Primary budget PDFs remain authoritative. Reconciliation, source hashes and update details (JSON).
| NIA scope | Project rows | Allocation pesos |
|---|---|---|
| External NEP detailed annex | 791 | ₱17,598,181,000 |
| External House annex | 828 | ₱17,999,305,000 |
| Adopted HGAB detailed schedule | 828 | ₱17,999,305,000 |
The preferred House source is the retained second-reading copy. Its audit reports text equivalence across the NIA annex readings; this does not independently authenticate the bill. Annex totals and named major NIA projects are different scopes and must not be added without checking their budget hierarchy.